Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.5 LSame as L1Rejected-Finance | ₹8.5 LSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L3₹9.2 L+₹69,926 (8.24%)Rejected-Finance | ₹9.2 L+₹69,926 (8.24%) | L3 | Rejected-Finance L3 |
| 4 | L4₹9.4 L+₹89,904 (10.6%)Rejected-Finance | ₹9.4 L+₹89,904 (10.6%) | L4 | Rejected-Finance L4 |
Tender Value
₹10.0 L
EMD Value
₹29,968
Closing Date
3 Jun 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Work of construction of drain in front of dumping ground in Dhabarasi village.
2026_DOLBU_1154911_13
122/Nirman/2026-27 Date 26.05.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹29,968
18 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 | 40.22 | CUM | 110 | ₹4,424.2 |
| 2 | S/L P:C:C (1:4:8) with 40 mm gauge stone ballast ,Coarse sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO-281 | 20.1 | CUM | 6,100 | ₹1,22,610 |
| 3 | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR
2020/283 a .) | 52.26 | CUM | 8,640 | ₹4,51,526.4 |
| 4 | Steel reinforcement for R.C.C work including straightening ,cutting ,bending,placing in position and binding all complete upto plinth level mild steel and medium tensile steel bars DSR 2023 ITEM N.5.22.1 | 32.82 | QTL | 8,166 | ₹2,67,999.95 |
| 5 | GST | 18 | Percentage | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2163383.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .