| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹89.0 LAccepted-AOC WARD NO 04 NEAR LIC PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | L-1 | Accepted-AOC Lowest Rate | |
| 2 | L-2₹77.8 L+₹2.4 L (3.17%)Rejected-Finance WARD NO 13 BANDHA MOHALLA PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | L-2 | Rejected-Finance Higher Rate | |
| 3 | L-3₹79.0 L+₹3.6 L (4.77%)Rejected-Finance | L-3 | Rejected-Finance Higher Rate |
Tender Value
₹85.2 L
EMD Value
₹1.1 L
Closing Date
12 Nov 2022, 5:00 pmClosed
General Manager (Opr.), Pench Area, WCL
Office of the Area General Manager Western Coalfields Limited Pench Area Parasia District Chhindwara
Transportation, Installation, Extension and Tail End Shifting of 13 Nos. Pony Belt and Dismantling in Seam II and IV at Naheriya Underground Mine of Pench Area
2022_WCL_260633_1
pe3350-min-e0027-2022-23
Open Tender
Miscellaneous Works
Item Rate
180 days
Naheriya Underground Mine of Pench Area
Please refer Tender documents.
7 documents required · 7 mandatory
₹1.1 L
2 Jan 2023
27 Oct 2022
14 Nov 2022
28 Oct 2022
12 Nov 2022
28 Oct 2022
28 Oct 2022 - 4 Nov 2022
Amount
PART - A - DSR Items
Excavation work by manual means in foundation or drains including dressing of sides and ramming of bottom, including getting out the excavated soil and disposal of same within lead of 50m in ordinary rock...etc
Providing and laying in position cement concrete of specified grade excluding the cost of centring & shuttering 1:2:4 (1Cement, 2course sand, 4 graded stone 20mm)......etc.
Centering and shuttering including, strutting, propping etc Removal of of form form for foundation ,footing ,bases of column etc for mass concrete
PART - B - Non - DSR Items
Installation of 01 x37 KW (800MM) belt drive head with all accessories and electrical up to initial lead 50 mtr
Extra for every additional lead of each 50 mtr. (Drive head) Extra for every additional lead of each 50 mtr (Drive head) PB-1-1DN/21L(Seam-IV)= 02 leads PB-2-25L/1DN(Seam-IV)= 03 lead PB-3-5DN/25L(Seam-IV) = 03 lead PB-4-0L/13DN (Seam-IV)= = 03 lead PB-5-2L/13DN (Seam-IV) = 02 lead PB-6-4L/13DN (Seam-IV) = 02 lead PB-7- 36DS/39L(Seam-II) = 02 lead PB-8- 40DS/39L(Seam-II) = 0 3lead PB-9- 32DS/31L(Seam-IV)=04ead PB-10- 36RS/31L (Seam-IV)= 04 lead PB-11-18DS/37L (Seam-IV)= 04 lead PB12-32LS/24DS(Seam-II)= NIL PB-13- 18RN/OL(Seam-IV)= 05 Lead
Transportation & installation of structure roller, stool bracket……etc and laying of belts with all accessories up to initial lead 50m PB-1-1DN/21L-25L(Seam-IV)= 120M PB-2-25L/1DN-5DN Seam-IV)= 120M PB-3-5DN/25L-27L(Seam-IV) = 60M PB-4-0L/13DN-19DN(Seam-IV)= 180M PB-5-2L/13DN- 17DN(Seam-IV) = 120M PB-6-4L/13DN-17DN(Seam-IV) = NIL PB-7- 36DS/39L-45L (Seam-II) = 180M PB-8- 40DS/39L-45L(Seam-II) = 180M PB-9- 32DS/31L-35L (Seam-IV)=120M PB-10- 36DS/31L-35L (Seam-IV)= 120M PB-11-18DS/37L-43L (Seam-IV)= 180M PB12-32LS/24DS(Seam-II)= NIL PB-13-18RN/OL-CL(Seam-IV)= 90M
Extra for transportation of belt structure …etc for every 50 mtrs from surface to installation site PB-1-1DN/21L-25L(Seam-IV)= 120M X 02LEAD= 240M PB-2-25L/1DN-5DN Seam-IV)= 120MX03LEAD=360M PB-3-5DN/25L-27L(Seam-IV) = 60MX03LEAD=180M PB-4-0L/13DN-19DN(Seam-IV)= 180MX03LEAD=540M PB-5-2L/13DN-17DN(Seam-IV) = 120M X02LEAD=240M PB-6-4L/13DN-17DN(Seam-IV) = NIL PB-7- 36DS/39L-45L (Seam-II) = 180MX04LEAD=720M PB-8- 40DS/39L-45L(Seam-II) = 180MX04LEAD=720M PB-9- 32DS/31L-35L (Seam-IV)=120MX04LEAD=480M PB-10-36DS/31L-35L (Seam-IV)= 120MX04LEAD=480M PB-11-18DS/37L-43L (Seam-IV)= 180MX04LEAD=720M PB12-32LS/24DS(Seam-II)= NIL PB-13-18RN/OL-CL(Seam-IV)= 90X05LEAD=450M
Shifting/Extension and installation of Tail end with all accessories up to one pillar PB-1-1DN/21L-25L(Seam-IV)= NIL PB-2-25L/1DN-5DN Seam-IV)= 01 PB-3-5DN/25L-28L(Seam-IV) = NIL PB-4-0L/13DN-19DN(Seam-IV)= 01 PB-5-2L/13DN- 17DN(Seam-IV) = 01 PB-6-4L/13DN-17DN(Seam-IV) = 01 PB-7- 36DS/39L-45L (Seam-II) = 03 PB-8- 40DS/39L-45L(Seam-II) = 03 PB-9- 32DS/31L-35L (Seam-IV)=02 PB-10- 36DS/31L-35L (Seam-IV)= 02 PB-11-18DS/37L-43L (Seam-IV)=03 PB12-32LS/24DS(Seam-II)= NIL PB-13-18RN/OL-CL(Seam-IV)= 01Tmes
Complete supply of nut & bolts
Belt fasteners hook for belt jointing
Dismantling, stacking & transportation of belt. Drive head with all accessories upto initial lead of 50 mtrs. 1-31LN/7DN(Seam-IV)=01 2-34LN/19DS(Seam-II)=01 3-4DS/31L(Seam-IV)=01 4-0L/13DN (Seam-IV)= = 01 5-2L/13DN (Seam-IV) = 01 6-4L/13DN (Seam-IV) = 01 7-32DS/39L(Seam-II) = 01 8-36DS/39L(Seam-II) = 01 9-40DS/39L(Seam-II) = 01 10-31RS/39L(Seam-II)= 01 11-37LS/7DS(Seam-IV)= 01 12- 32LS/24DS(Seam-II)= 01 13.18RS/OL (Seam-IV)=01 14. 32DS/31L(Seam-IV)=01 15. 36DS/31L (Seam-IV)=01 16.13RN/6L (Seam-IV)=01
Dismantling, stacking & transport of structures, rollers of belt with all accessories upto initial lead of 50 mtrs.(100 mtrs.) 1-31LN/7DS-1DS(Seam-IV)=180M 2-4DS/31L-36L(Seam-IV)= 150M 3.0L/13DN-19DN(Seam-IV)= 180M 4-2L/13DN- 18DN(Seam-IV) = 150M 5-4L/13DN-17DN(Seam-IV) = 120M 6-32DS/39L-45L(Seam-II) = 180 M 7-36DS/39L-45L(Seam-II) = 180M 8-40DS/39L-45L(Seam-II) = 180 M 9-31RS/39L-36L(Seam-II)= 90M 10-37LS/7DS-11DS(Seam-IV)= 120M 11- 32LS/24DS-29DS(Seam-II & IV)= 150 12.18RS/OL -CL(Seam-IV)= 90M 13. 32DS/31L35L (Seam-IV)=120M 14. 36DS/31L-35L (Seam-IV)=120M 15.13RN/6L (Seam-IV)= 210M
Total impact of GST for the purpose of CTC
DIAMOND CONSTRUCTION
AAVED SHEIKH
DIAMOND CONSTRUCTION
AAVED SHEIKH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .