Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L1 | Accepted-AOC Awarded as first lowest bidder (L1) | |
| 2 | L2₹42.3 L+₹2.5 L (6.34%)Rejected-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L2 | Rejected-AOC Awarded as second lowest bidder (L2) | |
| 3 | L3₹43.7 L+₹3.9 L (9.84%)Rejected-AOC SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | L3 | Rejected-AOC Awarded as third lowest bidder (L3) | |
| 4 | L4₹45.2 L+₹5.4 L (13.6%)Rejected-AOC 123 23 1 SHRISANT APARTMENT MANGALMURTI NAGAR PASHAN SUTARWADI ROAD PASHAN PUNE MAHARASHTRA 411021 | PUNE | MAHARASHTRA | 411021 | L4 | Rejected-AOC Awarded as forth lowest bidder (L4) | |
| 5 | L5₹45.2 L+₹5.4 L (13.6%)Rejected-AOC GALA NO B 128 129 130 SATYAM INDUSTRIAL ESTATE OFF KARVE ROAD OPP SNDT COLLEGE ERANNDWANE PUNE 411038 PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | L5 | Rejected-AOC Awarded as fifth lowest bidder (L5) |
Tender Value
Refer Docs
EMD Value
₹88,000
Closing Date
5 Feb 2021, 6:00 pmClosed
GERD PASHAN PUNE
GERD PASHAN PUNE
Manning and operation of AC plants lift including maintenance of AC plants, lift and cranes at NMRL ambernath under GERD Pashan Pune
2020_MES_389279_2
GERD/PSN/TOKEN/17 OF 2020-21
Open Tender
Civil Works
Item Rate
335 days
GERD PASHAN PUNE
As per tender documents
8 documents required · 8 mandatory
₹500
GERD PASHAN PUNE
₹88,000
Yes
5 Mar 2021
11 Jan 2021
8 Feb 2021
12 Jan 2021
5 Feb 2021
22 Jan 2021
12 Jan 2021 - 21 Jan 2021
Amount
Providing services to operate VRF system including all AHU's, chilled water plant 24 x 3 TR, of NMRL / MES, take care of all plants, cleaning of installation upto presentable manner and to ensure its smooth functioning of above mentioned installation in one General Shift of 8 hours ( i.e. from 0900 hrs to 1700 hrs) per day on all working days except saturdays, sundays and holidays by deploying requisite well trained mate Electrician services complete all as specified and directed. Notes : (i) The tradesmen should be well trained and having five years experienced to operate VRF System and chilled water plant etc; complete. (ii) A log sheet shall be maintained and signed by both the parties indicating time in hour of services and break down attended by the contractor and the delay, if any. (ii) The minimum number of tradesmen to be deployed by the contractor shall be as per note No 18(a) on srl page No 15 of tender documents.
Providing services to attend all type of day to day E/M complaints connected with water coolers, window ACs, split AC and to operate package type AC at NMRL / MES in one general shift of 8 hours (ie from 0900 hours to 1700 hours) per day on all working days excluding saturdays, sundays and holidays by providing requisite well trained tradesmen & helper with tools & equipments and in addition to that to operate package type AC as required by users complete all as specified and directed. Note : The minimum number of trademen & mate/helper to be deployed by the contractor shall be as per note No 18(b) on srl page No 15 of tender documents.
Providng services for services of lifts (02 Nos) at NMRL in general shift of 8 hours (i.e from 0900 hrs to 1700hrs) per day on all working days except Saturdays, Sundays and holidays by deploying requisite well trained lift operators complete all as specified and directed. Notes : (i) Unit quoted rate is deemed to be inluded for any due servicing of component and like wise any minor defect rectification as directed by Egineer-in-charge. (ii) No additional payments on account of transportation will be done by the department. Note : The minimum numbers of trademen to be deployed by the contractor shall be as per note No 18(c) on srl page No 15 of tender documents.
Providing services to attend all type of day to day complaints from MES service centre connected with water supply complaints such as water leakage, no water supply, water tap repairs / replacement etc in one general shift of 08 hours (ie from 0900 hours to 1700 hours) per day on all working days except saturdays, sundays and holidays by deploying requisite well trained tradesmen & helper with tools and equipments complete all as specified and directed. Notes : The minimum numbers of trademen & helper to be deployed by the contractor shall be as per note No 18(d) on srl page No 15 of tender documents.
Notes for Ser Item No 1 to 4 here in before :- (i) Consumable material as waste cotton, brooms, brushes required for the maintenance are deemed to be included in the above quoted rates. (ii) Consumable material as grease, gland packing, alum, bleaching powder and disinfactant chemicals / gas required for the maintenance will be supplied by the Department on required basis. (iii) Operator of the pump sets and DG sets plants shall only be done by the persons having 2 (Two) years ITI qualification in the subject trade or 10 (Ten) years experience in reputed organisation / Govt organisation for the similar work. (iv) Tools and plants including transportation of persons required for the maintenenace and operation will be born by the contractor. No extra payment will be made on this account. (v) Name of the individuals deployed for the services shall be exhibited at Pump house / installations. The contractor will submit verification in respect of antecedent of the individuals deployed and security passes shall be obtained well in advance for the individuals deployed for the services. (vi) The workers deployed on the services shall wear uniform as per standard industrial dress code to exhibit professionalism and integrity of the workers. The unit quoted against the items is deemed tobe included for the same and no extra claim on this accoutn shall be entertained by the Govt. (vii) In case of rates quoted are lower than the minimum fair wages as fixed by the Govt of India / State Govt / Union Territory whichever is higher, the Accepting Officer shall have the rights to reject the offer. No claim or any sort of appeal on this account shall be entertained.
Material and labour in repairs for GI sheet with and including TDF flanged rectangular / square duct made out to any shape hollow profile including all accessories such as corner, cleats, carriage bolts, gaskets and appropriate sealents on longitudinal joints etc , any gauge including GI sheet cover any guage all as directed and connecting / matching to the existing ducting system, including necessary brackets / supports of suitable size MS angle and painting the supports with two coats of synthetic enameled paint over a coat of zinc chrome primer including preparation and removal old complete all as specified and directed.(Note : Insulation will be measured and paid separaterly )
Material and labour in repairs insulation with new insulation with and including fiber glass wool roll of density 24 Kilogram / cum of thickness of insulation 50 mm including cleaning the dust surface (to be insulated) by scraping carefully with wire brush etc to make the surface completly free for mile scale, dirts, dust, grease and other foregin materials, taking special care so that all dust joints are sealed against any leaking and applying rubber based adhesive CPRX compound, sealing of all longitudinal joints and circular overlaps with and including aluminium foil tape 50 mm wide to make the insulation leak proof, securing the insulation with and including mechanically fastened nylon / steel straps of size 12 mm / 50 mm at maximum intervals of 1.2 metre and fixing the outer GI cover after repair with proper screws and nuts, bolts, including cleaning of inside ducts completly for removing dusts / dirts and rust with proper scrappers and using air compressor including testing for leaking complete and removal old complete all as specified and directed.
Material and labour in repairs for ducting insulation made out of fiber glass wool roll of density 24 Kilogram / cum of thickness of insulation 50 mm including jointing with propper sealing against any leaKilogrames and applying rubber based adhesive CPRX compound, sealing of all longitudinal joints and circular overlaps with and including aluminium foil tape 50 mm wide to make the insulation leak proof, securing the insulation with and including mechanically fastened nylon / steel straps of size 12 mm / 50 mm at maximum intervals of 1.2 m. and removal pld complete all as specified and directed.
Supply, install, testing and commissioning of air cooled scroll compressor operating on R-22 refrigerant of 12 TR suitable for package type unit including taking down unserviceable scroll compresser and removal complete all as specified and directed. Make:- Blue Star, Voltas, O General, LG.
Supply and fix in repairs humidity controller suitable for 2 x 12 TR central AC plants and testing complete all as specified and directed. Make : Honey well, Johnson or equivalent as approved by GE.
Material and labour for leakage testing, pressure testing with and including nitrogen, vaccumising complete system of central AC plant with double stage vaccume pump of atmospheric pressure less than 28 to 30 mm / hg complete all as specified and directed.
Material and labour for refrigerant gas R -22 including charging to All type of air conditioner for proper functioning and cooling effect to the entire satisfaction of Engineer in Charge complete all as specified and directed. Make - Refron, Macron, Freon
Material and labour in repairs for panel 2 x 12 TR suitable for condensing unit with and including MCB, Relay, contactor and control wirig as per existing including all other related accessories for smooth functioning for 2 x 12 TR AC plant including commissioning and testing Complete all as specified and directed.
Material and labour for Cleaning filter and drain pipe , Oiling , Servicing of AHU of central AC palnt 2 x 24 TR sizes including checking of tighting of belts including replacement of the same if required for smooth functioning complete all as specified and directed.
Material and labour for servicing and cleaning of cooling coil 4 / 6 rows deep of capacity 12 TR through cleaning agent and remove the oil and dust from fins and cooper tubes / pipes including checking of copper tubing for leakage including maching, repairing, brazing of leakaged tubes complete including sealing of joints complete all as specified and directed.
Supply and fix in repairs running metreal expansion valve suitable for 12 TR Central type AC plant system all as per existing / sample, including brazing at both ends complete all as specified and directed.
Supply and fix in repairs check oil filter connecting to refregerent supply line complete all as specified and directed..
Material and labour for compressor oil suitable for 22 HP out door unit of VRF System complete all as specified and directed.
Material and labour for refrigerant gas R -410 including charging for VRF palnt for proper functioning and cooling effect to the entire satisfaction of Engineer in Charge complete all as specified and directed.
Material and labour in repairs for disconnecting electrical connections, refrigerent piping, servicing and overhauling of high / middle / low static floor mounted ducted IDU machine / AHU with and including fan and cooling coil, return air filter, drain trays complete for Air handling unit of VRF Plant by removing dust, dirt, foreign material deposited on cooling coil fins with and including suitable ditergent, cleaning / de-carbunising of pre and post air filters of shaft and reinstalled in same position with correct alignment after cleaning / repairing, remove the all rust from shaft by machinery work, polishing maching to existing and rebalancing of shaft including servicing and testing of blower drum assembly for proper functioning and balancing including testing & commissioning complete all as specified and directed.
Taking down fins and copper tubes including disconnecting all electrical and other connection pipes and cleaning complete blockage of tubes with and including nitrogen and chemical of outdoor condensing unit complete along with testing for smooth functioning for 2 x12 TR and refixing the same complete all as specified and directed..
Material and labour in repairs for rewinding of condenser fan motor capacity 3 HP of central AC plant with and including supper enameled copper wire of same gauge including refixing and testing complete all as specified and directed.
Supply and fix in repairs temperature sensor with and including connecting wire from control panel to AHU Room complete all as specified and directed. Make : ANNAPURNA, INDFOSS, RANUTROL.
Matreial and Labour for special lift safety maintenance visit including break down on call , necessary repairs of goods lift of capacities 600 kilogram to 1000 Kilogram repectively (Make : Omega Elevators), travel motor , gear box, control panel, pulley, Ram coil, etc. installed at NMRL Ambernath area including dismantling / replacing the unserviceable spare parts at site complete all as specified and as directed. Note: (i) Spare parts to be replaced for completion of the job shall be measured and paid seperately as 'supply only' items here in after. (ii) Maintenance work to be carried out by authorised rep of manufacturers as approvd by GE.
Supply only main mother board complete all as specified and as directed
Supply only main Rope of size 13 mm complete all as specified and as directed
Supply only main traction Pulley , 24 "complete all as specified and as directed
Supply only ram coil complete all as specified and as directed
Supply only brake coil complete all as specified and as directed
Supply only over travel limit MCB complete all as specified and as directed
Supply only of machine bearings set complete all as specified and as directed
Supply only travelling copper Cable of size 1.0 sq mm 10 core complete all as specified and as directed
Supply only push button complete all as specified and as directed
Supply only braking resistor complete all as specified and as directed
Supply only V3F Drive complete all as specified and as directed
Material and labour in repairs for rewinding of main motor of capacity 10 HP with suitable copper winding wire as per existing complete all as specified and as directed
Material and labour for shaft wiring with 1.5 square mm copper conductor 1100volts grade FRLS wire including earth wire of 1.00 square mm drawn through and including 24 SWG thick GI through with cap of suitable size (trucking) in hoist way upto lower limit switch at ground floor to control panel etc. from the 1000 kilogram / 600 Kilogram goods lift serving Ground + 1 floor including testing and taking out existing shaft wiring complete all as specified and as directed
Material and labour for load testing of lift of 1000 kilogram / 600 Kilogram capacity including transportation of necessary load, necessary equipments for load test complete all as specified and directed. Notes :- (i) Load required for testing to be arranged by contractor, (ii) The Load test to be carried out by recongnised / authorised Govt Agencies as approved by GE in the presence of contractor or his authorised rep and users rep / Engineer in charge complete all as specified and directed, (iii) The load test report will be submitted by the contractor to Engineer in charge complete, (iv) Load testing is inclusive of shiffting / transporting of necessary load for testing and back to site including loading & unloading required ropes, man power, equipments, etc for load test complete all as specified and directed.
Supply and fixing in repairs complete microprocessor based variable voltage variable frequency controller system suitable for the existing speed, stops and simplex down collective operation, luminous and digital fixture for fright Elevator including dismantling of the existing controller, hall fixture, wiring and other unwanted accessories complete all as specified and directed.
Supply and fixing in repairs combined luminous hall buttons with and including digital hall position indicators on all floors having stailess steel faceplates complete all as specified and directed.
Supply and fixing in repairs car operating panel with and including luminous buttons suitable for existing stops having stainless steel faceplate complete all as specified and directed.
Supply and fixing in repairs digital car position indicator in the car with and including stainless steel faceplate complete all as specified and directed.
Material and labour in repairs for complete rewiring of the elevator including provision of new travelling cable, junction boxes and other wiring materials as per existing complete all as specified and directed.
Supply and fixing in repairs battery operated alarming meter bell and emergency light in car complete all as specified and directed.
Material and labour in repairs for Hoist way position system, limit switches and pit switch complete all as specified and directed.
Material and labour in repairs for RCBO, TOCI, R CAM, CAR gate switch and gate locks for all landing complete all as specified and directed.
Material and labour for checking throughly of serviceablity of every parts of EOT crane of capacity 1.0 Ton / 2.0 Tonnes such as travel motors , gear box contol panel, etc. complete including servicing, oiling and greasing, replcement of spares as required, make the crane serviceable in all respect and testing complete all as specified and directed. Note : Spare parts required to be replaced for completion of the job shall be measured and paid seperately as 'supply only' items here in after.
Supply only wheel with and including Pin Shaft complete all as specified and directed.
Supply only Ball bearing complete all as specified and directed.
Supply only MS Gears for wheel complete all as specified and directed.
Supply only Steel wire roop multi standed 10 mm complete all as specified and directed.
Supply only Steel wire rope multi standed 6 mm / 8 mm complete all as specified and directed.
Supply only Travelling copper Cable of size 1.0 sq mm 21 core complete all as specified and directed.
Supply only PVC Coated and PVC insulated copper conductor multi stranded of size 10 squaremm 4 core complete all as specified and directed.
Supply only HRC Fuse links 16 Amps complete all as specified and directed.
Supply only HRC Fuse links 32 Amps complete all as specified and directed.
Supply only HRC Fuse links 63 Amps complete all as specified and directed.
Supply only Gear Box oil EP -230 complete all as specified and directed.
Supply only Brake Oil complete all as specified and directed.
Supply only Brake Shoe of 150 mm dia complete all as specified and directed.
Supply only Magnatic Coil complete all as specified and directed.
Supply only Limit switch assembly complete all as specified and directed.
Supply only Push button 1 No + 1 NC complete all as specified and directed.
Supply only Time delay relay for starter complete all as specified and directed.
Supply only Coupling nuts bolts complete all as specified and directed.
Material and labour for Load testing of Flame proof EOT crane of 1.0 Tonne / 2.0 Tonne capacity including transportation of necessary laod and equipments for load test complete all as specified and directed. Notes :- (i) Load required for testing to be arranged by contractor. (ii) The Load test to be carried out by recongnised / authorised Govt Agencies as approved by GE in the presence of contractor or his authorised rep and users rep / Engineer in charge complete all as specified and directed, (iii) The load test report will be submitted by the contractor to Engineer in charge complete, (iv) Load testing is inclusive of transporting of required load and back to site including loading & unloading including required ropes, man power, epuipments, etc for load test complete all as specified and directed.
Shree Ayyappa Engineering
cooltech engineering services
R. K. Industrial Fabricators
M/s Vijay Airconditioning Pvt Ltd
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .