Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance B 16 280 KALYANI NADIA 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 LAdmitted-Finance 111 M C GARDEN ROAD KOL 30 | KOLKATA | WEST BENGAL | ₹2.8 L | L2 | Admitted-Finance |
| 3 | L3₹3.1 LAdmitted-Finance 10B DR LAHIT BANERJEE SARANI GROUND FLOOR KOLKATA 700 073 | KOLKATA | KOLKATA | WEST BENGAL | 700073 | ₹3.1 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,565
Closing Date
18 Feb 2026, 2:30 pmClosed
SENIOR SUPERINTENDING ENGINEER
OFFICE OF THE SENIOR SUPERINTENDING ENGINEER (P.W.Dte) South-Western Electrical Circle PWD Compound, Midnapore, Paschim Medinipur
Annual Comprehensive, Corrective and Preventive Maintenance Of Split Ac machines in different sites under Digha Electrical Section under Contai Elecltrical Sub division, P.W.Dte.
2026_WBPWD_1002672_1
WBPWD/SSE/SWEC/NIQ141/2025-26
Open Tender
ELECTRICAL WORKS M/R
365 days
PURBA MEDINIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,565
OFFICE OF THE SENIOR SUPERINTENDING ENGINEER
26 Feb 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
18 Feb 2026
12 Feb 2026
12 Feb 2026
Sites for AC Maintenance: Dighi Bungalow, Roads Inspection Bungalow, Civil Inspection Bungalow, Social Sector Bungalow & Office and Digha Section Office, Helipad Digha.
Annual Comprehensive, Corrective & Preventive Maintenance of various types of AC machines.
1 TR Split type AC Machine.- 2 Nos. (Quantity- 2 Nos x 12 Months = 24 Unit)
1.5 TR Split type AC Machine.- 12 Nos. (Quantity- 12 Nos x 12 Months = 144 Unit)
2 TR Split type AC Machine.- 30 Nos. (Quantity- 30 Nos x 12 Months = 360 Unit)
3 TR Split type AC Machine.- 16 Nos. (Quantity- 16 Nos x 12 Months = 192 Unit)
TERMS AND CONDITIONS FOR AC MAINTENANCE:-
A) Routine checking and servicing (Preventive maintenance). The rate are inclusive of all taxes. i) Checking & servicing of all mechanical & electrical parts of the A.C.Machine, refrigerant system, condenser & cooling system etc. twice in each month. ii) Checking of performance of each machine, Load Current (Amp) , CFM, grill temperature¸ room temperature etc. twice in a month & these shall be noted, in Log Book. All entries be countersigned by the Agency and the concerned Junior Engineer in the Log Book. iii) In every three months, the Outdoor unit should be thoroughly cleaned and washed by vacuum cleaner and jet spray. iv) All machine shall be numbered according to their location, made and as per direction of E.I.C & Log book be maintained accordingly. v) Cleaning of filters twice in each month. vi) Lubricating the bearing of the motor & fan as and when required vii) Checking the electrical incomer upto incoming M.C.B incl. starter, switches etc. in each month. Any fault located should be brought to the notice of the Asstt. Engineer & Junior Engineer immediately. viii) Checking & repairing of all parts which have not been specified but necessary to keep the machine satisfactory running condition. ix) If any fire hazard occurred due to poor maintenance of the Split/WindowAir Conditioning machine, the liability will goes to solely on the concerned maintenance agency.
B) Overhauling: i) Through overhauling of the machine part by part once in a year. ii) Cleaning & painting of the machine body, base tray etc. once in a year. iii) Cleaning & discalling of condenser unit, cooling coil etc. and gas leak test once & when required in a year. iv) Overhauling shall preferably be done during winter season and must be noted in the Log Book.
C) Supply & Repairing: This comprehensive contract covers preventive & corrective maintenance of A.C. machine/ spare parts as required so as to keep the A.C. machine operative/ functioning round the clock and for ensuring uninterrupted & trouble - free performance of the equipment. i) Replenishing refrigerant required as a result of a leak in system arising out of fair wear & tear as per requirement. ii) Supply of refrigerant shall be made as & when required by the Agency in his own cost for all AC Machine.. iii) Repair of microprocessor controls & to be replaced free of cost for all AC Machine. iv) Replacement capacitor (P2 type) incl. of all spare parts, including compressors , shall be made by the Agency for smooth running of the machine at his cost for all AC Machine. v) Filters be changed except nylon filter once in a year & the new once shall be approved by the EIC. vi) Replace/ repair of all spare parts of ductable split type (Like- Refrigerent, blower motor, remote sensing unit, controler, ducting, damper unit, all kind of valve, communication card, contactor and other electrical accerise etc) are to be made agency own cost. vii) No major parts shall be removed without permission of concerned Asstt. Engineer. Challan shall be obtained from Junior Engineer while taking away machine or parts from site for repairing and materials shall be returned/ repaireed within three days to worksite in Co’s challan.
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.83 MB
BOQ_2457877.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid