Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹17.3 L+₹3.2 L (23.0%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹17.7 L+₹3.6 L (25.5%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹18.1 L+₹4.0 L (28.3%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹23.5 L
EMD Value
₹47,000
Closing Date
5 Feb 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Barbed wire fencing of green belt along 100 mtr wide road from plot no. 147 to 257 sector 33, and green belt along nala on park-2 and park-4 side from 24 mtr wide road to 75 mtr wide road in sector 32 Yeida WC-H
2026_YEIDA_1108453_13
YEA/GM(PROJECT)/2026/457 DT-19/01/2026
Open Tender
Agricultural or Forestry
Fixed-rate
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹840
₹47,000
10 Aug 2026
27 Jan 2026
6 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating of holes more then 0.10 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. disposing within a lead of 50m and lift upto 1.5m. | - | nos | 24.93 | - |
| 2 | Providing and laying in position cement concrete with 4cm gauge stone ballast, core sand and cement in proportion 8:4:1 , including supply of all materials, labour, Tools & plant extra for proper completion of the work. | - | cum | 5,820 | - |
| 3 | Supply at siteR.C.C Standards post/struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 m m nominal size) with wooden plugs or mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | - | cum | 22,762.58 | - |
| 4 | Fencing with R.C.C Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but end post and corner post shall be strutted on both sides and end post one side only provided with norizontal lines and two diagonals of barbed wire 9.35 Kg. per 100 meters (min) between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C Posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used. | - | rm | 8.75 | - |
| 5 | White Washing with lime to give and even shade. | - | sqm | 16 | - |
| 6 | Supply of JCB on Hire Basis…… | - | day | 8,827.4 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.65 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
13.pdf
Tender Documents • 1.53 MB
BOQ_2049342.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .