Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.2 L+₹2,854.20 (0.69%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹4.6 L+₹43,151.20 (10.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MR.G.MADASAMY L2 | HARI CONSTRUCTION L3 | MR.THANGAPANDIAN, CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00PROVIDING CEMENT CONCRETE PAVEMENT AT Murugan House to Perumal House Street in Thirumalapuram Village and Sayamalai Panchayat | ||||||
| 2.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any 1 thickness of walls Chipping of concrete and Roughening the surface deploying machineries and labour including all other incidental charges etc., complete. | 300 | Sqm | 45 ₹13,500 | 240 ₹72,000 | 43 ₹12,900 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and 2 conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete - Pavement Top surface layer. | 30 | Cum | 5,595 ₹1,67,850 | 5,700 ₹1,71,000 | 5,591 ₹1,67,730 Lowest |
| 4.00 | Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete., | 15 | Sqm | 375 ₹5,625 | 460 ₹6,900 | 364 ₹5,460 Lowest |
| 5.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 30 | Cum | 7,670 ₹2,30,100 | 6,800 ₹2,04,000 Lowest | 7,605 ₹2,28,150 |
| 6.00 | Supllying and fixing Bituman Tarsheet 15mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete. | 3.2 | Sqm | 515 ₹1,648 | 1,600 ₹5,120 | 509 ₹1,628.8 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
21 Jul 2026, 3:00 pmClosed
Block development officer,kuruvikulam
Block development officer,kuruvikulam
BDOKRM/99/2026-A2 / Providing Cement Concrete Pavement at Murugan House to Perumal House Street in Thirumalapuram Village of Sayamalai Panchayat
2026_RDTN_684407_1
BDOKRM/99/2026-A2
Open Tender
Civil Works
Works
Kuruvikulam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
24 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
21 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PROVIDING CEMENT CONCRETE PAVEMENT AT Murugan House to Perumal House Street in Thirumalapuram Village and Sayamalai Panchayat | - | - | - | - |
| 2 | Dismantling, clearing away and carefully stacking materials useful for re-use for any 1 thickness of walls Chipping of concrete and Roughening the surface deploying machineries and labour including all other incidental charges etc., complete. | 300 | Sqm | 43.2 | ₹12,960 |
| 3 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and 2 conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete - Pavement Top surface layer. | 30 | Cum | 5,592.9 | ₹1,67,787 |
| 4 | Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete., | 15 | Sqm | 365 | ₹5,475 |
| 5 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 30 | Cum | 7,606.81 | ₹2,28,204.3 |
| 6 | Supllying and fixing Bituman Tarsheet 15mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete. | 3.2 | Sqm | 509 | ₹1,628.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.46 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_822704.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .