Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹15.9 L
Closing Date
16 Jul 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tata Power Delhi Distribution Limited
1 Year Rate Contract for Laying, Testing & Commissioning(LTC) of 33KV Cable at Different locations in TPDDL area
200001970
TPDDL/ENGG/ENQ/200001970/26-27
Delhi
• The bidder should have an average annual turnover of Rs. 1 crore in last 3 financial years. Copy of audited P&L Account to be submitted in this regard.
• The bidder should have executed 11KV (any sizes) or higher cable Laying works of at least 10km in last three years. Copy of work order / completion certificate to be submitted in this regard.
• Bidder should have Performance Certificates for 1 year satisfactory performance of cable laid by them from 1 reputed company of 33KV or higher. The work against these issued certificates should be completed in last five years from the date of bid submission. In case the bidder has a previous association with Tata Power DDL for similar products and services, the performance feedback for that bidder by Tata Power DDL’s User Group shall only be considered irrespective of performance certificates issued by any third organization.
• The bidder should have Valid Electrical Contractor License issued by Govt of NCT of Delhi to execute the electrical works in Delhi. Bidder must submit the copy of license in this regard. In case bidder is not having this License, Bidder shall submit an undertaking that in case they are the successful bidder, same shall be obtained by them before execution of contract by TPDDL.
• The bidder must have all statutory compliance like valid PAN no., ESI registration, EPF registration, GSTN etc. The bidder must submit the copy of all these registrations.
₹5,000
₹15.9 L
30 Jun 2026
30 Jun 2026
16 Jul 2026
Annexure-1 (Schedule of Item)
NIT No - TPDDL/ENGG/ENQ/200001970/26-27
NIT Description - 1 Year Rate Contract for Laying, Testing & Commissioning (LTC) of 33KV Cable at different locations in Tata Power – DDL area
S. NO. TPDDL Service Code Item Descr. UOM Quantity "A" Unit Rate (Rs.) "a" Applicable GST (in Rs.) "b" Price per Unit (in Rs.) "B"= a+b TPDDL Amt (in Rs.) C=A*B HSN/ SAC code
1.001 209221 Excavation 33KV CableTrench-Ordinary soil Cu M 1000 0.00 0.00 0.00
1.002 209222 Excavation 33KV CableTrench-CC road / Ordinary Bituminous/ Tile work pathways Cu M 2803 0.00 0.00 0.00
1.003 209223 Excavation 33KV CableTrench-Dense Bituminous road (Asphalt) / RCC road Cu M 2020 0.00 0.00 0.00
1.004 209224 Excavation 33KV CableTrench-Rocky soil/road Cu M 1071 0.00 0.00 0.00
1.005 209225 Surveying of cable route, excavation of trial pits as per field requirement, preparation of route drawing, finalization of bonding arrangement with location of joint chamber positions & finalizing the cable route in consultation with TPDDL's representative. M 11890 0.00 0.00 0.00
1.006 209226 Surveying of cable route, excavation of trial pits as per field requirement, preparation of route drawing, GPR Survey finalization of bonding arrangement with location of joint chamber positions & finalizing the cable route in consultation with TPDDL's representative. M 11890 0.00 0.00 0.00
1.007 205345 Evaluation of Thermal Resistivity of soil at selected locations along the route. EA 5 0.00 0.00 0.00
1.008 205346 Phase Test/ High Pot Test EA 14 0.00 0.00 0.00
1.009 209227 Laying, testing and commissioining of 33KV 3C x 400 sq.mm Aluminum, XLPE cable (as per TPDDL's specification) already in the excavated trench/already laid pipe M 20836 0.00 0.00 0.00
1.01 205305 Backfilling including normal ramming of loose earth during the back filling with selected available riddled earth from the trench excavation. Cu M 10786.8 0.00 0.00 0.00
1.011 209228 Disposal of surplus earth /debris of excavation after back filling including handling, loading, unloading & transportation Cu M 2696.2 0.00 0.00 0.00
1.012 209229 Supply, Fabrication and installation of galvanized steel required for cable mounting structure, tower mounting structure, LA installation, drain crossing structure, barricating, fencing etc, where ever required as per approved drawing including nuts, bolts, washer & clamps. KG 1978.94 0.00 0.00 0.00
1.013 209230 Supply, Fixing of the Danger plates on the poles including fabrication of clamp etc. EA 26 0.00 0.00 0.00
1.014 209231 Supply and Spreading of sand in the cable trench forming cushion and cover around & above the cable as per latest drawing & specifications TATA POWER-DDL including all accessories. (If TPDDL specifications is not avaoilable then relevant IS will be applicable) Cu M 2696.2 0.00 0.00 0.00
1.015 209232 Supply, Laying of 150 mm wide 100 micron thick Red color LDPE warning tape with desired printing as per latest drawing & specifications TATA POWER-DDL including all accessories. (If TPDDL specifications is not avaoilable then relevant IS will be applicable) M 21280 0.00 0.00 0.00
1.016 209233 Supply, Installation of identification marker / tag of size 50 mm x 25 mm x 2 mm and fastening the same with Nylon string as per TPDDL specifications or including all accessories as per TPDDL Specifications. (As per TPDDL specifications or IS in case TPDDL specifications are not available) EA 3633 0.00 0.00 0.00
1.017 209234 Supply, Laying of 200 mm dia 6 mm thick ISI marked GI pipe with jointing sockets (wherever required) & making of proper sealing arrangement at the ends of pipes with petty messonary work. (As per TPDDL specifications) M 5009 0.00 0.00 0.00
1.018 209235 Supply, Laying of 150 mm dia 6 mm thick 3 mtr length ISI marked GI pipe with jointing sockets (wherever required) & making of proper sealing arrangement at the ends of pipes with petty messonary work. as per TPDDL specifications EA 6 0.00 0.00 0.00
1.019 209236 Supply, Installation,Mounting & fixing of cable/cables with Fire retardent (SMC or Nylon) cleats as per TPDDL specs. & clamps arrangements for 33KV 3Cx400 sq.mm cable & passing through suitable GI pipe (pipe is seperate item) including its Jumpering on cable mounting structure of one circuit as required. Excluding supply of mounting structure EA 14 0.00 0.00 0.00
1.02 209239 Supply & Laying of RCC precast protection covers/ tiles as per latest specification & drawing of TATA POWER-DDL. EA 25239 0.00 0.00 0.00
1.021 209240 Supply, Fixing of route marker of specified size at 200 mtrs and on turns as specified in the TPDDL standard drawing. Material for fixing the route marker is in the scope of bidder. EA 161 0.00 0.00 0.00
1.022 209241 Supply, Fixing of joint marker of specified size at cable joints as specified in the TPDDL standard drawing.Material for fixing the route marker is in the scope of bidder. (250m drum) EA 48 0.00 0.00 0.00
1.023 209248 SITC of Earthing with GI Pipe Earth heavy class electrode 100 MM dia, Length 6000 mm for protection with earth enhancement compound (Terec-5 KG and Earthcon-12.5KG), earth clamp, connection arrangement for connection to equipment. This include backfilling and site restoration using your own material. Supply of GI pipe as mentioned above is in bidder scope. The work shall be done as per TPDDL specification and drawings. EA 13 0.00 0.00 0.00
1.024 209249 SITC of Earthing with GI Pipe Earth heavy class electrode 100 MM dia, Length 3000 mm for protection with earth enhancement compound (Terec-5 KG and Earthcon-12.5KG), earth clamp, connection arrangement for connection to equipment. This include backfilling and site restoration using your own material. Supply of GI pipe as mentioned above is in bidder scope. The work shall be done as per TPDDL specification and drawings. EA 31 0.00 0.00 0.00
1.025 209250 Supply, Laying of HUME pipe & making of proper sealing arrangement at the ends of pipes with petty messonary work for laying LT/HT cables etc of size upto 630 sqmm (As per TPDDL specifications or IS in case TPDDL specifications are not available) M 24 0.00 0.00 0.00
1.026 209006 Supply, Fixing of Number Plate including all accessories as per TPDDL Specifications. (As per TPDDL specifications or IS in case TPDDL specifications are not available) EA 28 0.00 0.00 0.00
1.027 209251 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (Zone -III) : 8 graded stone aggregate 40 mm nominal size). M3 60 0.00 0.00 0.00
1.028 209252 Supply, Laying of 200 mm dia PN4 PE63 ISI marked HDPE pipe with jointing sockets( IN OPEN CUT) & making of proper sealing arrangement at the ends of pipes. (As per TPDDL specifications or IS in case TPDDL specifications are not available) M 494 0.00 0.00 0.00
1.029 209253 Supply, Laying of 200 mm dia PN4 PE80 ISI marked HDPE pipe with jointing sockets( IN OPEN CUT) & making of proper sealing arrangement at the ends of pipes. (As per TPDDL specifications or IS in case TPDDL specifications are not available) M 2465 0.00 0.00 0.00
1.03 209254 Supply, Installation ,testing & commissioning of (50x6 GI flat) Earthing conductor for connection of , L.T panel, Junction box, & building Lightning risers & peak Connection etc M 1900 0.00 0.00 0.00
1.031 209255 Supply, Installation ,testing & commissioning of ( 75 x 12 mm G I flat) Main Earth mat, Aux Earth mat & Earthing Risers for Main Equipments&structures etc ( 75 x 12 mm G I flat).This item includes required earthexacavation for laying earth flat including weilding etc.if required M 610 0.00 0.00 0.00
1.032 209256 ITC of 30KV,10KA,Zinc oxide type, heavy duty, station class, lightning arrestor 1CX50 sqmm copper flexible cable if required provided for connection with LA surge counter including jumpering, Bimetallic Clamp for LA if any EA 21 0.00 0.00 0.00
1.033 209257 SITC of 1cx50 sqmm copper cable as per TATA Power-DDL specifications (between LA and counter) M 30 0.00 0.00 0.00
1.034 209007 Supply, Installation, Testing & Commissioning of wedge connectors of any type through authorized & certified person EA 36 0.00 0.00 0.00
1.035 209258 Supply, Fixing of Bird guard EA 12 0.00 0.00 0.00
1.036 209259 Installation, Testing & Commissioning of 36kV Post Insulator (porcelain) as per TATA Power-DDL specifications. EA 6 0.00 0.00 0.00
1.037 209260 Installation, Testing & Commissioning of ACSR Zebra conductor as per TATA Power-DDL specifications M 100 0.00 0.00 0.00
1.038 209261 Installation, Testing & Commissioning of ACSR covered Goat conductor as per TATA Power-DDL specifications M 12 0.00 0.00 0.00
1.039 209262 Supply, Installation ,testing & commissioning of Hardware & Fittings for Conductors (GOAT, ZEBRA) EA 20 0.00 0.00 0.00
1.04 209263 Supply, Installation ,testing & commissioning Paddle for GOAT/WOLF/ZEBRA Conductor EA 20 0.00 0.00 0.00
1.041 209264 Supply, Installation ,testing & commissioning of GI Stray Wire KG 50 0.00 0.00 0.00
1.042 Collecting, stacking , screening & resprEAding of existing yard gravel stone. M3 4 0.00 0.00 0.00
1.043 209266 Supply, Installation of heavy duty Al Terminal connectors EA 10 0.00 0.00 0.00
1.044 209267 Supply, Installation of heavy duty Al Terminal connectors (Earth Jumpers) EA 10 0.00 0.00 0.00
1.045 209268 Supply, errection of 13 m Rail Pole as per TPDDL specifications EA 4 0.00 0.00 0.00
1.046 209269 ITC of PIN INSULATOR POLYMER 33 KV (10 KN) EA 6 0.00 0.00 0.00
1.047 209380 Jumpering of various electrical equipment by wolf/goat/Zebra Conductor in between equipment to equipment/ tower to rail pole by connector as per TPDDL standard design (material will be free issued by TPDDL) Set means three phases. SET 2 0.00 0.00 0.00
1.048 209270 Laying tensioning, testing & commissioning of line, including hoisting of insulators, hardware fittings and Jumpering etc. ACSR "Wolf" conductor (per mtr. per conductor) M 10 0.00 0.00 0.00
1.049 209271 Supply, ITC of GI ladder tray-600 as per drawing (in cable trench) M 50 0.00 0.00 0.00
1.05 209272 Supply, ITC of GI ladder tray-300 as per drawing (in cable trench) M 50 0.00 0.00 0.00
1.051 209273 Supply, Fabrication & Installation, grouting of Jalli/Mesh for cable mounting structure of size as per TPDDL standard drawing and instruction of Engineer In charge , above ground painted with one coat of red oxide and two coats of syanthtic paint ,one gate of 1.25mtr width,earthing the gate and channel angle frame, and grouting (All material will be supplied by contractor.steel Paint,c wire Mesh/Jalli & Hinges,cement to be supplied by contractor of standard size). (As per TPDDL specifications or IS in case TPDDL specifications are not available) Sq M 2 0.00 0.00 0.00
1.052 209274 Fixing/ providing complete pacca stay in 4Cu Ft concrete mortor of the ratio 1:3:6 including the supply of stone blast & Badarpur sand (Cement will be supplied by TPDDL) as per standard design of TPDDL EA 2 0.00 0.00 0.00
1.053 209275 SITC of WIRE STAY GI 7/8 SWG as per TPDDL specification. KG 2 0.00 0.00 0.00
1.054 209276 SITC of stay set including PLATE BASE RCC SIZE 450X450X75MM as per TPDDL approved drawing EA 2 0.00 0.00 0.00
1.055 209277 SITC of stay set including ANCHOR ROD SIZE 20MMX2100MM as per TPDDL approved drawing EA 2 0.00 0.00 0.00
1.056 209279 Supply, Installtion, Testing & Commissioning of Polymeric Tension Insulator 33 kV, 120 kN as per TATA Power-DDL specifications ENG-EHV-113 EA 6 0.00 0.00 0.00
1.057 209280 Supply, Installtion, Testing & Commissioning of Polymeric Suspension Insulator 33 kV, 90 kN as per TATA Power-DDL specifications ENG-EHV-115 EA 6 0.00 0.00 0.00
1.058 209282 Painting of poles in black & yellow strip (Zebra) as per TPDDL Design upto 180 cm.from ground level including numbering of pole in red & white paint of ISI mark to be supplied by contractor. Supply of paint is in bidder scope. EA 5 0.00 0.00 0.00
1.059 209283 Supply, Fixing of Anticlimbing device including Fixing of 14 SWG GI barbed wire (approx. 25 kg), and GI brackets as per IS specifications. EA 24 0.00 0.00 0.00
1.06 209285 Supply, Fixing of the Circuit plates on the poles including fabrication of clamp etc. EA 32 0.00 0.00 0.00
1.061 209286 ITC of Cover MVLC-38 on condutor as per TPDDL specification. M 12 0.00 0.00 0.00
1.062 209287 SITC of PVC 1 inch Conduit M 5 0.00 0.00 0.00
1.063 209288 ITC of insulated conductor on jumers as per TPDDL specifcations M 24 0.00 0.00 0.00
1.064 209289 Providing & Laying C.C in brick ballast in 1:6:12 (1 Cement : 6 Coarse Sand : 12 Brick aggregate) mix. (Stay) M3 4 0.00 0.00 0.00
1.065 209290 Earth work in excavation in all kinds of soil by mechanical mEAns (Hydraulic excavator) / manual mEAns including dressing of sides and ramming of bottoms including dewatering (both for sub-soil water& rain water) wherever required by mEAns of suitable capacity of pump & pipe lines during excavation, concreting & also keeping the arEA dry till the construction is over including close timbering including strutting, shoring and packing cavities (wherever required) etc. complete and disposal of excavated EArth lEAd upto 50m and lift upto 1.5m, disposed EArth to be levelled and nEAtly dressed M3 4 0.00 0.00 0.00
1.066 201793 Filling available excavated EArth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating EAch deposited layer by ramming and watering, lEAd up to 50 m and lift up to 1.5 m. M3 10 0.00 0.00 0.00
1.067 209291 Transportation of various items from stores to site or from site to site or from site to store including loading and unloading: with tempo 709/410 EA 5 0.00 0.00 0.00
1.068 209292 Transportation of various items from stores to site or from site to site or from site to store including loading and unloading: with truck EA 4 0.00 0.00 0.00
1.069 209293 Transportation of power cable drum from stores to site or from site to site or from site to store including loading and unloading EA 49 0.00 0.00 0.00
1.07 209295 Supply & spreading of gravels M3 4 0.00 0.00 0.00
1.071 209296 Collecting, stacking , screening & resprEAding of existing yard gravel stone. M3 4 0.00 0.00 0.00
1.072 209297 SITC of 33kV BPI for required cable mounting structure EA 12 0.00 0.00 0.00
1.073 209298 SITC of clamp & connectors required for 33kV BPI suitable for 2.5 inch IPS tube EA 12 0.00 0.00 0.00
1.074 209299 SITC of clamp & connectors required for 33kV LA suitable for 2.5 inch IPS tube EA 6 0.00 0.00 0.00
1.075 209300 SITC of connector to terminate cable termination lug & 2.5 inch IPS tube EA 10 0.00 0.00 0.00
1.076 209301 SITC of aluminium IPS tube busbar of 2.5 inches suitable for minimum 1600A of required length(maximum 3metre) Rated Current insulated with Raychem BPTM sleeves of 33kV class, endcaps of tube busbar. EA 18 0.00 0.00 0.00
1.077 209302 SITC of 33kV cable mounting and junction structure. This shall be outdoor cable junction arrnagment connected with incoming and outgoing power cables of one circuit (2 run three phases) through external open bus bar arrangement comprising of brass palm conectors, alluminium IPS tube busbar of 2.5 or 4 inches suitable for minimum 1600A Rated Current insulated with Raychem BPTM sleeves of 33kV class, endcaps of tube busbar. This includes supply of structural steel/ GI required for mounting structure with porcelain/polymeric(as per Approved drawing) insulators suitable for 36kV rating class. This also includes all clamps required for cable connection on tube busbar and cable mounting arrangement with Nylon cleats. Scope also inlcude supply of insulators required for separation of earthing flat from mounting structure. Danger Notice Plates shall be provided on the fencing of the mounting structure at suitable height as per the standard and TPDDL Specification & drawing. EA 22 0.00 0.00 0.00
1.078 209303 SITC of clamp & connectors required for 33kV BPI suitable for 4 inch IPS tube EA 10 0.00 0.00 0.00
1.079 209304 SITC of clamp & connectors required for 33kV LA suitable for 4 inch IPS tube EA 10 0.00 0.00 0.00
1.08 209305 SITC of connector to terminate cable termination lug & 4 inch IPS tube EA 10 0.00 0.00 0.00
1.081 209306 SITC of aluminium IPS tube busbar of 4 inches suitable for minimum 1600A of required length(maximum 3metre) Rated Current insulated with Raychem BPTM sleeves of 33kV class, endcaps of tube busbar. EA 3 0.00 0.00 0.00
1.082 209307 S&I Steel Work - Built up Section Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primerall complete. KG 500 0.00 0.00 0.00
1.083 209308 SITC of 33kV Cable terminating box. Cable Termination Box suitable for 2 Run 33kV 3CX400sq.mm incoming & outgoing cable, made of CRCA sheet having Double leaf door on front/ Rear with padlock arrangement & panel key with table like base frame of size 1500X1500. The base of table Box frame height of 1mtr from ground. There should be a provision of 2 nos. incoming & 2 nos. outgoing cable through the base frame for termination in boxes. Boxes should have IP protection. Boxes should have copper Busbar of 80 x10 mm , Earthing - 50 x 6 AL, Color Shade - RAL7035, Gland Plate - 3 mm (ms), Cubical Sheet -2mm (ms). Size of Box: 1500X1500X1800 mm. (Material code: 601000730) EA 1 0.00 0.00 0.00
1.084 209309 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe- PN 4, PE63 200 mm dia casing using HDD machine in DOUBLE RUN as per TPDDL Specifications. Scope includes Supply of HDPE Pipe PN 4, PE63 200 mm along with all accessories. (If TPDDL specifications is not avaoilable then relevant IS will be applicable) M 3681 0.00 0.00 0.00
1.085 209310 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe- PN 4, PE63 200 mm dia casing using HDD machine in SINGLE RUN as per TPDDL Specifications. Scope includes Supply of HDPE Pipe PN 4, PE63 200 mm along with all accessories. (If TPDDL specifications is not avaoilable then relevant IS will be applicable) M 54 0.00 0.00 0.00
1.086 209311 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe-PN Grade 6, PE63 200 mm dia casing using HDD machine in DOUBLE RUN as per TPDDL Specifications. Scope includes Supply of HDPE Pipe PN 6, PE63 200 mm along with all accessories. (If TPDDL specifications is not avaoilable then relevant IS will be applicable) M 2578 0.00 0.00 0.00
1.087 209312 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe-PN Grade 6, PE63 200 mm dia casing using HDD machine in SINGLE RUN as per TPDDL Specifications. Scope includes Supply of HDPE Pipe PN 6, PE63 200 mm along with all accessories. (If TPDDL specifications is not avaoilable then relevant IS will be applicable) M 6 0.00 0.00 0.00
1.088 209313 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of HDPE pipe-PN Grade 6, PE63 200 mm dia casing using HDD machine in SINGLE RUN as per TPDDL Specifications. Scope includes Supply of HDPE Pipe PN 6, PE63 200 mm along with all accessories. (If TPDDL specifications is not avaoilable then relevant IS will be applicable) M 24 0.00 0.00 0.00
1.089 209314 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable 3CX 400 sqmm <(>&<)> HDPE pipe-PN Grade 4, PE80 200 mm dia casing using manual trenchless method. Scopeincludes Supply of HDPE Pipe PN 4, PE80 200 mm long with all accessories. (If TPDDL specifications is not available then relevant IS will be applicable) M 50 0.00 0.00 0.00
1.09 209316 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe- PN 4, PE80 casing using HDD machine. Scope includes Supply of HDPE Pipe PN 4, PE80 200 mm along with all accessories. (If TPDDL specifications is not avaoilable then relevant IS will be applicable) M 53 0.00 0.00 0.00
1.091 209317 Supply, Laying, testing and commissioining of OFC (with power cable) through already excavated trench in 40 mm HDPE in open cut including supply & laying of pipe along with push fit coupler (Coupler HDPE push fit type - 50 nos.) (The work also include cable blowing and pulling). HDPE to be as per TPDDL specifications. This excludes the supply of OFC M 6784 0.00 0.00 0.00
1.092 209319 Supply, Laying, testing and commissioining of OFC (with Power cable) through trenchless in 40 mm HDPE PIPE including supplying & laying of pipe (The work also include cable blowing and pulling). HDPE to be as per TPDDL specifications.This excludes the supply of OFC. M 4256 0.00 0.00 0.00
1.093 209320 Supply, Laying, testing and commissioining of OFC (without Power cable) through trenchless in 40 mm HDPE PIPE including supplying & laying of pipe (The work also include cable blowing and pulling). HDPE to be as per TPDDL specifications.This excludes the supply of OFC. M 50 0.00 0.00 0.00
1.094 209321 Supply, Installation, testing & commissioning of FMS 24 Port EA 6 0.00 0.00 0.00
1.095 209322 Supply, Installation, testing & commissioning of FMS 48 Port EA 4 0.00 0.00 0.00
1.096 209325 Supply, Installation of the joint/loop chamber for OFC EA 116 0.00 0.00 0.00
1.097 209030 Supply, Installation, testing & commissioning of Splice clouser 96F EA 12 0.00 0.00 0.00
1.098 209332 SITC OPGW Jointing Kit EA 13 0.00 0.00 0.00
1.099 203695 Dismantling of ACSR "Wolf" conductor (per mtr. per conductor) including stacking at site, re- roling of dismantled ACSR conductor on drum and transportation of dismentalled material to TPDDL store/ site as per requirement of Engineer- in- charge. Including loading/ unloading M 6600 0.00 0.00 0.00
1.1 209333 Dismantling of MS rail 42 pole including loading, unloading & transportation to location as per TPDDL EIC In charge EA 12 0.00 0.00 0.00
1.101 209334 Dismantling of mounting structure as per TPDDL engineer instructions TON 0.306 0.00 0.00 0.00
1.102 209335 Dismantling of structure including H/W fitting, pin with insulator, insulator, insulator strings, x-arm etc. from Pole structure as per requirement of engineer in charge (No separate charges for transportation and loading/unloading will be paid for this item) KG 50 0.00 0.00 0.00
1.103 209336 Dismantling of H/W fitting with insulator, insulator strings etc from the Rail Poles-Single Pole Structure as per requirement of engineer in charge. (No separate charges for transportation and loading/unloading will be paid for this item) EA 2 0.00 0.00 0.00
1.104 209337 Dismantling of H/W fitting with insulator, insulator strings etc from the Rail Poles-Double Pole Structure as per requirement of engineer in charge. (No separate charges for transportation and loading/unloading will be paid for this item) EA 3 0.00 0.00 0.00
1.105 209338 Dismantling of H/W fitting with insulator, insulator strings etc from the Rail Poles-TriPole Structure as per requirement of engineer in charge. (No separate charges for transportation and loading/unloading will be paid for this item) EA 2 0.00 0.00 0.00
1.106 209339 Dismantling of H/W fitting with insulator, insulator strings etc from the Rail Poles-four Pole Structure as per requirement of engineer in charge. (No separate charges for transportation and loading/unloading will be paid for this item) EA 1 0.00 0.00 0.00
1.107 205133 Dismantling - G.I.Wire 4 SWG M 10 0.00 0.00 0.00
1.108 209340 Dismantling - G.I.Wire 8 SWG M 10 0.00 0.00 0.00
1.109 209341 Cutting of stubs (set of 4 members) EA 5 0.00 0.00 0.00
1.11 209342 Dismantling - Cable from mounting structure EA 8 0.00 0.00 0.00
1.111 209343 Dismantling of 9m pole including any hardware fittings as per requirement of engineer in charge. (No separate charges for transportation and loading/unloading will be paid for this item) EA 2 0.00 0.00 0.00
1.112 209344 Dismantling of 11m pole including any hardware fittings as per requirement of engineer in charge. (No separate charges for transportation and loading/unloading will be paid for this item) EA 2 0.00 0.00 0.00
1.113 209381 dismantling of existing isolator. This item scope also including loading , unloading and transportation of the same to store as per TPDDL project in charge Set 2 0.00 0.00 0.00
1.114 209382 Dismantling tower, gantry/super structure ton 9 0.00 0.00 0.00
1.115 209345 Dismantling of 33KV U/G/AG cable by digging the required size of trench and back refilling the trench, ramming surface and re-rolling the cable on the drum or in the shape of coil as per TPDDL engineer instructions . M 10 0.00 0.00 0.00
1.116 209346 Dismantling of ACSR panther conductor ( per conductor / per mtr) inclduing dismantling of H/W fittings with insulator strings from existing structure/pole as per requirement of engineer in charge. (No separate charges for transportation and loading/ unloading will be paid for this item (rerolling included)) M 10 0.00 0.00 0.00
1.117 209347 Dismantling of ACSR GOAT conductor ( per conductor / per mtr) inclduing dismantling of H/W fittings with insulator strings from existing structure/pole as per requirement of engineer in charge. (No separate charges for transportation and loading/ unloading will be paid for this item (rerolling included)) M 10 0.00 0.00 0.00
1.118 209348 Dismantling of OPGW from rail poles/tower M 2100 0.00 0.00 0.00
1.119 209349 Supply of 33KV TOUCHPROOF TERMINATION EUROMOLD 2R 33kV Touch Proof termination kit including all accessories including Tee (M484TB/G), Coupling(M804PB/G)<(>,<)> Trifurcation kit(T-HSBK-50-DR2F),Euromold make suitable for double runs of 33kv 3cx400 sqmm power cables. ST 2 0.00 0.00 0.00
1.12 209350 ETC of 33KV TOUCHPROOF TERMINATION EUROMOLD at GIS panel for 3cx400 sqmm power cables. ST 2 0.00 0.00 0.00
1.121 209352 ITC of wedge connectors EA 36 0.00 0.00 0.00
1.122 209364 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) M3 4 0.00 0.00 0.00
1.123 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe- PN 4, PE80 casing using HDD machine including of Supply of HDPE Pipe & including all accessories As per Tata Power- DDL specifications or IS in case Tata Power- DDL specifications are not available -(Profile drawing of trenchless to be submitted to PO with co-ordinate) - Double Run Cable M 737 0.00 0.00 0.00
1.124 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe- PN 4, PE80 casing using HDD machine including of Supply of HDPE Pipe & including all accessories As per Tata Power- DDL specifications or IS in case Tata Power- DDL specifications are not available -(Profile drawing of trenchless to be submitted to PO with co-ordinate)- Single Run Cable M 15 0.00 0.00 0.00
1.125 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe- PN 6, PE80 casing using HDD machine including of Supply of HDPE Pipe & including all accessories As per Tata Power- DDL specifications or IS in case Tata Power- DDL specifications are not available -(Profile drawing of trenchless to be submitted to PO with co-ordinate)- Double Run Cable M 369 0.00 0.00 0.00
1.126 Laying, testing & commissioning of cable making Trenchless ducts with 200 mm dia including laying of cable & HDPE pipe- PN 6, PE80 casing using HDD machine including of Supply of HDPE Pipe & including all accessories As per Tata Power- DDL specifications or IS in case Tata Power- DDL specifications are not available -(Profile drawing of trenchless to be submitted to PO with co-ordinate)- SIngle Run Cable M 15 0.00 0.00 0.00
1.127 Making of Civil goomties around GI earth pipe as per TPDDL design including supply of bricks, cement, sand and CI Cover of size as per TPDDL standards and providing the same on top of the goomties EA 36 0.00 0.00 0.00
1.128 SITC of 40 MM dia HDPE Pipe. M 340 0.00 0.00 0.00
1.129 SITC of Earth Insulator (DMC) EA 140 0.00 0.00 0.00
1.13 SITC of wedge connectors as per Tata Power- DDL sepcifications.. EA 30 0.00 0.00 0.00
1.131 Supply of CABLE OPTICAL FIBER SIZE 24 F ARM M 10715 0.00 0.00 0.00
1.132 Supply of CABLE OPTICAL FIBER SIZE 48 F ARM M 2350 0.00 0.00 0.00
1.133 Supply, Laying of 200 mm dia PN6 PE63 ISI marked HDPE pipe with jointing sockets( IN OPEN CUT) & making of proper sealing arrangement at the ends of pipes.(As per Tata Power- DDL specifications or IS in case Tata Power- DDL specifications are not available ) M 1726 0.00 0.00 0.00
1.134 Supply, Laying of 200 mm dia PN6 PE80 ISI marked HDPE pipe with jointing sockets( IN OPEN CUT) & making of proper sealing arrangement at the ends of pipes.(As per Tata Power- DDL specifications or IS in case Tata Power- DDL specifications are not available ) M 248 0.00 0.00 0.00
1.135 Supply, Mounting, fixing, testing and commissioning of OPGW Cable including supply of tension fitting, downlead clamp, joint closure etc. The work also include cable blowing and pulling M 210 0.00 0.00 0.00
1.136 Tapping of existing OPGW and connecting to OFC. The scope of work also includes re- stringing, installation of OPGW at one tower.(the scope of work excludes supply of material) EA 14 0.00 0.00 0.00
Total All Inclusive Amount (Rs) 0.00
TENDER NO: TPDDL/ENGG/ENQ/200001970/26-27
DESCRIPTION: 1-year Rate Contract For Laying, Testing & Commissioning of 33KV Cable at Different TPDDL Sites
TYPE OF TENDER: OPEN TENDER
Last Date of receipt of pre-bid queries, if any 03.07.2026 up to 1800 Hours
Sr. No. Detailed Reference to Tata Power Technical Document. Please specify Document No / Clause No / Page No Description as per Bid Document Query / Clarification Tata Power DDL Reply Vendor name Email ID phone number
Supplier Sustainability Index Questionnaire
Vendor Name : Vendor Code : Date : Vendor Code
Parameter Category (Marks) S. No. Questions Detail Description Max Score Scoring Criteria
Marks Gain Response by BA Remark By BA
Environment (100) Carbon Footprint (20) 1 Does your organization calculate GHG emissions? Please select the suitable option (Select any one response): a) Yes, we calculate the GHG emissions and data is available since FY ….... b) No, but we have plans to start GHG inventorization from FY ….... c) No, we do not compute GHG emissions, nor we have any plans in near future to do so. 5 a) 5 b) 2 c) 0
2 Which GHG emissions your organization has computed and what is their value? Please select the suitable option (multiple responses can be selected): a) Scope-1 (Direct GHG emissions from sources owned or controlled by the organization); Emissions for FY 25: .................. b) Scope-2 (Indirect GHG emissions from the generation of purchased electricity, steam, heating, and cooling consumed by the organization) Emissions for FY 25: .................. c) Scope-3 (Indirect emissions from activities upstream and downstream of the value chain, i.e. with purchasers and suppliers) Emissions for FY 25: .................. 10 a) 4 b) 4 c) 2
3 Has your organization set targets & programs to reduce carbon footprint in its overall logistic operation? Please select the suitable option (Select any one response): a) Yes, our organization has set targets and programs to reduce carbon footprint. b) No, our organization does not have set targets and programs to reduce carbon footprint. c) Partially, our organization has some initiatives but no specific targets or programs in place. d) Unsure/ Not applicable 5 a) 5 b) 0 c) 3 d) 0
Energy Consumption and Efficiency (10) 4 How does your organization manage and optimize energy consumption? Please select the suitable option (multiple responses can be selected): a) We regularly conduct energy audits and implement energy-efficient technologies. b) We have designated energy management teams to monitor and improve energy usage. c) We actively promote energy-saving practices and provide employee training on energy conservation. d) We have implemented automated systems to track and control energy consumption. e) Our organization does not have specific measures in place to manage or optimize energy consumption. 5 a) 2 b) 1 c) 1 d) 1 e) 0
5 Does the organization monitor Stack Emissions (source specific) and/ or Ambient Air Emissions (area wide) in its premises? a) Yes, the organization regularly monitors both Stack and Ambient Air Emissions b) Yes, the organization monitors Stack Air Emissions only c) Yes, the organization monitors Ambient Air Emissions only d) No, the organization does not monitor Stack or Ambient Air Emissions 5 a) 5 b) 3 c) 3 d) 0
Waste Management/ Packaging (10) 6 What are the different categories of waste which your organization generates? Please select the suitable option (multiple responses can be selected): a) Hazardous Waste and/or Battery Waste b) Plastic Waste c) Metal Waste d) Biomedical Waste e) Municipal Soild Waste & other waste streams 5 a) 1 b) 1 c) 1 d) 1 e) 1
7 Does your organization has a process to recycle these waste categories either in-house or through external agency? a) Yes, all types of waste generated by us is recycled b) Yes, ....% of our waste goes for recycling c) We are not aware if any of our waste is recycled 2 a) 2 b) 1 c) 0
8 How does the organization incorporate packaging reduction, reuse, and recycling in its purchasing practices? Please select the suitable option (multiple responses can be selected): a) We actively seek suppliers who offer minimal packaging or sustainable packaging options b) We prioritize reusable packaging solutions when available and feasible c) We have established policies to encourage recycling of packaging materials d) Our organization does not specifically address packaging reduction, reuse, or recycling in purchasing practices 3 a) 1 b) 1 c) 1 d) 0
Water Management (15) 9 Has your organization set specific targets to reduce water consumption? a) Yes, our organization has set specific targets to reduce water consumption b) Our organization has some standalone initiatives to reduce water consumption, but no specific targets are set c) No standalone initiatives or targets are there to reduce water consumption 3 a) 3 b) 2 c) 0
10 Do you have a functional Rainwater Harvesting System at your facility? a) Yes with a capacity of …….KLD in …... sqm of catchment area b) No, but we have plans to put a RWH system by …..... c) No, we do not have any plans of putting up RWH in our premises 2 a) 2 b) 1 c) 0
11 What is the source wise consumption of water in your organization? Please select the suitable option (multiple responses can be selected): a) Underground Borewell approved by local authority; ..... KL b) Underground Borewell not approved by local authority; ..... KL c) Piped Municipal water supply; ..... KL d) Water Tanker; ...... KL e) Packaged Drinking Water; ...... KL f) Treated Waste Water; ..... KL g) Water consumption is not monitored in our organization 7 a) 1 b) 1 c) 1 d) 1 e) 1 f) 2 e) 0
12 Do you have any waste water treatment facility in your organization? a) Yes, we have waste water treatment facility of ….... KLD b) No, we do not have waste water treatment facility 3 a) 3 b) 0
Innovation for Sustainability (20) 13 How is your organization fostering innovation to address sustainability challenges? Please select the suitable option (multiple responses can be selected): a) By investing in internal R&D initiatives focused on sustainability. b) By establishing cross-functional teams dedicated to innovation in sustainability. c) By partnering with external stakeholders such as startups, research institutions, or NGOs. d) By encouraging employee-led sustainability projects and ideas. e) By participating in industry collaborations or consortia focused on sustainability innovation. f) Unsure/ Not applicable 10 a) 2 b) 2 c) 2 d) 2 e) 2 f) 0
14 Please share examples in support of the above. free text 10 5 marks of each example (mention any two examples)
Continuous Improvement (15) 15 Has your organization set specific ESG targets, and how are they monitored? a) Yes, our organization has set specific ESG targets, and they are monitored through regular performance assessments via well defined KPIs. b) Partial - While we do not have specific targets, but we monitor key parameters related to ESG. c) No, our organization has not set any specific ESG targets. 5 a) 5 b) 2 c) 0
16 How does your organization engage in continuous improvement in sustainability practices? Please select the suitable option (multiple responses can be selected): a) By conducting regular sustainability audits and assessments. b) By implementing feedback mechanisms from stakeholders on sustainability initiatives. c) By setting and reviewing sustainability goals on a regular basis. d) By participating in sustainability-focused training and education programs. e) By benchmarking against industry best practices on sustainability. f) By integrating sustainability considerations into decision-making processes. g) Other (Please specify) ________________________ 5 1 mark for each response with a maximum of 5 marks
17 Has the organization taken any initiative(s) to improve the Recyclability Ration of its products (End of Life Treatment) to reduce the impact of manufactured products on the environment and society? a) Yes [please share the details] b) No 5 a) 5 b)0
Renewable Energy (10) 18 Has your organization installed solar panels in the facility for renewable power generation? a) Yes for ….. KW b) No, but we purchase solar power from outside c) No, we do not have solar power in our energy mix 5 5 if details are provided else 0
19 Please provide the % share of solar in overall energy consumption (if response to previous question is Yes) …. %
20 Are you using Electric Vehicles in your organization setup? a) Yes, we have …... nos. of EVs deployed b) No, we do not have any EV in our setup 5 5 if details are provided else 0
21 In case response to previous question is "Yes", please share the details of EVs deployed in your organization setup with respect to type of usage etc. free text
Social (50) Labor Practices (20) 22 How does your organization ensure fair wages, working hours, and safe working conditions? Please select the suitable options (multiple responses can be selected): a) By implementing regular wage reviews and adjustments to ensure fair compensation. b) By adhering to legal regulations and industry standards regarding working hours. c) By conducting regular workplace inspections and safety audits to maintain safe working conditions. d) By providing training and education on labor rights and safety protocols to employees. e) By establishing grievance mechanisms for employees to report concerns about wages or working conditions. f) By collaborating with labor unions or worker advocacy groups to address labor-related issues. 10 a) 2 b) 2 c) 2 d) 1 e)2 f) 1 Maximum 10 marks
23 Does your organization have a presence of an Internal Review Committee and Policies to ensure the workplace is free of physical abuse, corporal punishment, physical contact with the intent to injure or intimidate, and disciplinary measures that cause physical discomfort? a) Yes, our organization has an Internal Review Committee and Policies in place to ensure the workplace is free from physical abuse and corporal punishment. b) Yes, our organization has Policies in place to ensure the workplace is free from physical abuse and corporal punishment, but there is no specific Internal Review Committee. c) No, our organization does not have specific Policies or an Internal Review Committee addressing physical abuse and corporal punishment. 5 a) 5 b) 3 c) 0
24 Can you provide information on diversity, equity, and inclusion within your workforce? a) Yes, our organization actively collects and reports data on diversity, equity, and inclusion metrics within our workforce. b) Yes, our organization has implemented initiatives and programs to promote diversity, equity, and inclusion within our workforce but does not currently collect or report data on diversity, equity, and inclusion within our workforce. c) No, our organization does not have specific initiatives or programs focused on diversity, equity, and inclusion within our workforce. 5 a) 5 b) 3 c) 0
Supply Chain Labor Standards (10) 25 How do you ensure that your suppliers adhere to fair labor practices? Please select the suitable option (multiple responses can be selected): a) By conducting regular audits or assessments of suppliers' labor practices. b) By requiring suppliers to sign agreements or contracts that include provisions for fair labor practices. c) By providing training and guidance to suppliers on fair labor standards and expectations. d) By engaging with suppliers in dialogue and collaboration to address any issues related to fair labor practices. e) By sourcing from suppliers with recognized certifications or accreditations related to fair labor practices. 5 a) 1 b) 1 c) 1 d) 1 e) 1
26 What steps are taken to address human rights issues in your supply chain? Please select the suitable option (multiple responses can be selected): a) Regular audits or assessments of suppliers' human rights practices. b) Requiring suppliers to adhere to codes of conduct or standards that include human rights provisions. c) Providing training and guidance to suppliers on human rights standards and expectations. d) Engaging with suppliers in dialogue and collaboration to address human rights issues. e) Sourcing from suppliers with recognized certifications or accreditations related to human rights practices. 5 a) 1 b) 1 c) 1 d) 1 e) 1
Community Engagement (20) 27 To promote social responsibility in its value (supply) chain, is there any visible commitment from the Top Management of the organization to integrate ESG criteria under a Responsible Supply Chain Policy/Program such as but not limited to Ethical, Social, Environmental and Gender Equality criteria, and health and safety, in its purchasing, distribution and contracting policies and practices to improve consistency with social responsibility objectives. a) Yes, there is visible commitment from Top Management to integrate ESG criteria into a Responsible Supply Chain Policy/ Program. b) Partially, there is some commitment from Top Management, but not all aspects of ESG criteria are integrated into the Responsible Supply Chain Policy/Program. c) No, there is no visible commitment from Top Management to integrate ESG criteria into a Responsible Supply Chain Policy/Program. 10 a) 10 b) 5 c) 0
28 Describe your organization's initiatives for supporting local communities where you operate. Please select the suitable option (multiple responses can be selected): a) We actively participate in community outreach programs and events. b) We contribute to local charities or nonprofits through donations or volunteer work. c) We collaborate with local stakeholders to address community needs and concerns. d) We provide employment opportunities and skill development programs for community members. e) We sponsor or support local educational or environmental initiatives. 10 a) 2 b) 2 c) 2 d) 2 e) 2
Governance (50) Ethics and Anti-Corruption (20) 29 Does the organization measure the following information:- Total number of substantiated complaints received concerning breaches of customer privacy? a) Yes, it is measured, there were ….. nos. in FY 25 b) No, it is not measured 5 a) 5 b) 0
30 Does the organization measures the following information:- Total number of identified leaks, thefts, or losses of customer data? a) Yes, it is measured, there were ….. nos. in FY 25 b) No, it is not measured 5 a) 5 b) 0
31 How does your organization prevent and address corruption risks? Please select the suitable option (multiple responses can be selected): a) By implementing robust anti-corruption policies and procedures. b) By conducting regular training on anti-corruption measures for employees. c) By establishing clear channels for reporting corruption concerns. d) By conducting periodic risk assessments to identify and mitigate corruption risks. e) By collaborating with law enforcement agencies or regulatory bodies to address corruption issues. 5 a) 1 b) 1 c) 1 d) 1 e) 1
32 Has the organization established a Code of Business Ethics, endorsed by senior management indicating organization’s values, principles, standards, and norms of behavior? a) Yes, our organization has established a Code of Business Ethics endorsed by senior management. b) No, we do not have any Code of Business Ethics endorsed by our senior management as of now, but we plan to introduce it by FY ...... c) No, we do not have any Code of Business Ethics endorsed by our senior management, nor we have any immediate plans for the same. d) Unsure/ Not applicable. 5 a) 5 b) 2 c) 0 d) 0
Transparency and Reporting (15) 33 How does your organization communicate its ESG efforts to stakeholders? Please select the suitable option (multiple responses can be selected): a) Through regular reports or publications dedicated to ESG initiatives. b) By hosting stakeholder meetings or forums specifically focused on ESG topics. c) Via dedicated sections on the company website or sustainability reports. d) Through social media platforms or other digital communication channels. e) By participating in industry conferences or events focused on sustainability. 5 a) 1 b) 1 c) 1 d) 1 e) 1
34 Is there a well-established governance structure for regulating/governing its policies? a) Yes, there is a well-established governance structure in place. b) Partially, there is some governance structure, but it's not well-established. c) No, there is no well-established governance structure in place, but we intend to establish the same by FY ..... d) No, there is no well-established governance structure in place, nor do we have any plans to establish the same in near future. 5 a) 5 b) 3 c) 1 d) 0
35 Are all labor, health, and safety policies, practices, and expectations communicated to all employees and suppliers in local or appropriate languages? a) Yes, all policies, practices, and expectations are communicated in local or appropriate languages. b) Partially, some policies, practices, and expectations are communicated in local or appropriate languages, but not all. c) No, not all policies, practices, and expectations are communicated in local or appropriate languages. 5 a) 5 b) 3 c) 0
Certifications (15) 36 Does your organization have following certifications (valid till date-please mention validity) Please select the suitable option (multiple responses can be selected): a) ISO 9001 accreditation b) ISO 20400:2017 or equivalent c) SA 8000 or equivalent d) ISO 14001 certification e) ISO 18001/45001 or equivalent f) ISO/IEC 27001 or equivalent g) Other (Please specify) ________________________ 15 a) 1 b) 5 c) 4 d) 2 e) 1 f) 1 g) 1
What is GHG emission?
GHG emission stands for Greenhouse Gas emission, which refers to the release of gases into the Earth's atmosphere that trap heat and contribute to global warming and climate change.
Key Greenhouse Gases (GHGs):
1. Carbon dioxide (CO₂) – from burning fossil fuels like coal, oil, and gas.
2. Methane (CH₄) – from agriculture (e.g., livestock), landfills, and natural gas leaks.
3. Nitrous oxide (N₂O) – from fertilizers, agricultural activities, and combustion.
4. Fluorinated gases – synthetic gases from industrial processes (e.g., HFCs, PFCs, SF₆).
🔥 Why GHG Emissions Matter:
GHGs act like a blanket around the Earth. They trap heat in the atmosphere, which leads to:
· Rising global temperatures
· Melting glaciers and rising sea levels
· More extreme weather (storms, droughts, floods)
· Disruption of ecosystems and food supply
📏 Measuring GHG Emissions:
GHG emissions are usually measured in tonnes of carbon dioxide equivalent (tCO₂e) to account for the different warming potentials of each gas.
· 1 tonne of methane (CH₄) = ~28–36 tonnes of CO₂e over 100 years
· 1 tonne of nitrous oxide (N₂O) = ~265–298 tonnes of CO₂e
📊 Types of GHG Emissions (Scopes):
Scope Description Examples
Scope 1 Direct emissions from owned/controlled sources Company vehicles, fuel combustion on-site
Scope 2 Indirect emissions from purchased energy Electricity used in buildings or factories
Scope 3 All other indirect emissions in the value chain Business travel, waste, supply chain emissions
🏭 Why Are GHG Emissions Important?
Climate Change: GHGs are the primary drivers of global warming.
Regulatory Compliance: Many countries require GHG reporting.
Sustainability Goals: Companies track emissions to reduce their carbon footprint.
Investor & Customer Pressure: Transparency and climate responsibility matter.
Scope 1 Emission:
Scope 1 emissions refer to direct greenhouse gas (GHG) emissions from sources that are owned or controlled by an organization. These include:
Sources of Scope 1 Emissions:
1. Stationary Combustion – e.g., fuel burned in boilers, furnaces, generators.
2. Mobile Combustion – e.g., fuel used in company-owned vehicles.
3. Process Emissions – e.g., emissions from chemical processes in manufacturing.
4. Fugitive Emissions – e.g., leakage from refrigerants or gas pipelines.
Scope 1 Emission Calculation Formula:
Scope 1 Emissions (tCO₂e)=∑(Fuel Quantity×Emission Factor)
Fuel Quantity is the amount of fuel used (in litres, m³, kg, etc.).
Emission Factor is a standard value indicating how much CO₂ (or CO₂e) is emitted per unit of fuel used. These values are typically provided by:
IPCC (Intergovernmental Panel on Climate Change)
National databases (e.g., US EPA, UK DEFRA, India’s CEA)
Example Calculation:
Scenario: A company uses 10,000 litres of diesel in generators annually.
Emission Factor (diesel): ~2.68 kg CO₂/litre
10,000 litres×2.68 kg CO₂/litre=26,800 kg CO₂=26.8 tCO₂
So, the Scope 1 emissions from diesel use = 26.8 tonnes CO₂e
Scope 2 Emission:
🔌 Scope 2 Emissions – What Are They?
Scope 2 emissions are indirect greenhouse gas emissions from the generation of purchased electricity, steam, heating, or cooling consumed by your organization.
Even though these emissions occur at the power plant (not on-site), they are accounted for by the buyer of the energy to reflect true carbon responsibility.
📐 Scope 2 Emission Calculation Formula
Scope 2 Emissions (tCO₂e)=Electricity Consumed(kWh)×Emission Factor (kg CO₂e/kWh)÷1000
Electricity Consumed: in kilowatt-hours (kWh)
Emission Factor: varies by country and source (coal, gas, hydro, renewables, etc.)
Conversion factor ÷ 1000 to convert kg to tonnes (tCO₂e)
📊 Example Calculation
Your organization consumes 100,000 kWh of grid electricity annually
Emission factor for your grid = 0.82 kg CO₂e/kWh (common in coal-heavy grids like India)
📌 Emission Factor References (Typical Values)*:
Region Grid Emission Factor (kg CO₂e/kWh)
India (CEA, 2023) ~0.82
USA (EPA Avg.) ~0.40
Renewable Energy ~0.0
Scope 2 GHG emission calculation:
If require want help of chatgpt for calculation:
e.g. type below sentence in chatgpt
“My factory annual electricity consumption is 12000 kwh in india. calculate scope 2 GHG emission value for me.”
It will give below reply:
Thanks! Based on your input:
Annual electricity consumption = 12,000 kWh
Location = India
Grid Emission Factor (India, CEA 2023) = 0.82 kg CO₂e/kWh
📊 Scope 2 Emissions Calculation:
Scope 2 Emissions = 12,000 kWh×0.82 kg CO₂e/kWh=9,840 kg CO₂e
9,840kg CO₂e ÷ 1000 = 9.84tonnes CO₂e (tCO₂e)
Your factory’s Scope 2 GHG emissions = 9.84 tCO₂e per year
Scope 3 Emission:
🌐 Scope 3 Emissions – What Are They?
Scope 3 emissions are all other indirect GHG emissions that occur in your value chain — both upstream (supplier side) and downstream (customer side). These do not come from owned or directly controlled sources but are a major part of your overall carbon footprint.
🔍 Examples of Scope 3 Activities:
Category Examples
Upstream Purchased goods & services, transportation, business travel, waste
Downstream Use of sold products, product disposal, downstream transport, franchises
Employee-related Commuting, leased assets
📐 How to Calculate Scope 3 Emissions
Because Scope 3 involves many sources, each category may use a different approach:
✅ General Formula:
Emissions (tCO₂e)=Activity Data×Emission Factor
· Activity Data = e.g., amount of goods purchased, km traveled, tonnes of waste
· Emission Factor = standard GHG factor for that activity (from sources like DEFRA, GHG Protocol, etc.)
📊 Example Calculation – Purchased Goods
· Your factory purchases 5 tonnes of steel per year
· Emission factor for steel production = 1.9 tCO₂e per tonne
5 tonnes×1.9 tCO₂e/tonne=9.5 tCO₂e5
You would repeat this process for each major activity under Scope 3.
✏️ To Calculate Scope 3 for Your Factory, if require you can use open source available on web & provide below detail for calculation of scope 3:
1. Purchased goods (type and quantity)
2. Waste generated (in tonnes or kg)
3. Business travel data (km, flights, etc.)
4. Employee commuting (approximate number, distance, transport type)
5. Transport of goods (inbound/outbound, km and tonnes)
6. Other relevant Scope 3 activities
🌫️ Stack and Ambient Air Emissions – Overview
In air pollution control and environmental compliance, stack emissions and ambient air emissions refer to two key concepts for monitoring and managing air quality.
🔥 1. Stack Emissions (Point Source Emissions)
These are air pollutants emitted from a fixed source, such as a chimney, furnace, or exhaust stack of a factory, boiler, or power plant.
🏭 Key Characteristics:
· Controlled and measurable
· Emitted directly into the atmosphere
· Subject to environmental regulation and pollution control norms
📋 Typical Stack Pollutants:
· Particulate Matter (PM10, PM2.5)
· Sulphur Dioxide (SO₂)
· Nitrogen Oxides (NOx)
· Carbon Monoxide (CO)
· Carbon Dioxide (CO₂)
· Volatile Organic Compounds (VOCs)
· Heavy metals (e.g., lead, mercury, cadmium)
· Dioxins and furans
🧪 Measurement Method:
· Stack monitoring is done using Continuous Emission Monitoring Systems (CEMS) or manual stack sampling as per CPCB/MoEF norms.
· Results are usually reported in mg/Nm³ or ppm.
🌍 2. Ambient Air Emissions (Ambient Air Quality)
These refer to the quality of the air in the environment outside the facility — i.e., the air people breathe in surrounding areas. These include emissions from multiple sources (industry, vehicles, construction, etc.).
📋 Key Ambient Pollutants Monitored:
· NH₃ (Ammonia)
· Benzene, Benzo(a)pyrene
🧪 Measurement Method:
· Ambient Air Quality Monitoring is done using Ambient Air Quality Monitoring Stations (AAQMS).
· Reported in µg/m³ as per National Ambient Air Quality Standards (NAAQS) in India.
✅ Regulatory Standards (India – CPCB):
Pollutant Stack Limit (Typical) Ambient Air Limit (24-hr avg, Industrial Area)
PM 150 mg/Nm³ (stack) 100 µg/m³ (PM10), 60 µg/m³ (PM2.5)
SO₂ 100 mg/Nm³ 80 µg/m³
NOx 50–300 mg/Nm³ 80 µg/m³
CO 100 mg/Nm³ 2 mg/m³ (1-hr avg)
Limits vary by industry type, fuel, and state-specific rules.
Aspect Stack Emissions Ambient Air Emissions
Source From industrial stacks or chimneys From all sources in the open environment
Purpose Regulatory compliance & pollution control Public health & environmental monitoring
Monitoring Stack analyzers or sampling Ambient air monitoring stations
ESG stands for Environmental, Social, and Governance — a framework used to assess an organization’s sustainability, ethical impact, and corporate responsibility beyond traditional financial metrics.
📊 The Three Pillars of ESG:
1. Environmental (E)
Focuses on how a company impacts the natural environment.
· Carbon footprint (GHG emissions)
· Energy and water usage
· Waste management
· Pollution control (air, water, soil)
· Biodiversity and conservation
· Climate risk and adaptation
Looks at how a company manages relationships with employees, communities, and stakeholders.
· Labor practices and human rights
· Health and safety
· Diversity, equity & inclusion (DEI)
· Community engagement
· Customer satisfaction
· Supply chain responsibility
3. Governance (G)
Relates to the structure, ethics, and accountability of corporate leadership.
· Board composition and diversity
· Business ethics and anti-corruption
· Transparency and disclosure
· Executive compensation
· Shareholder rights
· Compliance and risk management
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Annexure X – GCC_Composite Work.pdf
Tender Document • 2.87 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Annexure XIV – Safety Bid Document.pdf
Tender Document • 0.28 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Annexure-1 Schedule of Item_Price Bid (BOQ).pdf
Tender Document • 0.46 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Annexure-I Schedule of Item_BOQ.xlsx
Tender Document • 0.03 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_ENG-EHV-1019.pdf
Tender Document • 0.12 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_ENG-EHV-1020_Standard Technical Particular of.pdf
Tender Document • 1.30 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_ENG-EHV-1028_Standard Technical Particular of.pdf
Tender Document • 1.44 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_ENG-GEN-4023-01_Standard Technical Particular.pdf
Tender Document • 0.35 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_ENG-GEN-4024_Standard Technical Particular of.pdf
Tender Document • 0.58 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_ENG-GEN-4038_Standard Technical Particular of.pdf
Tender Document • 1.00 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_ENG-HV-2001_Specification for Galavnised Iron.pdf
Tender Document • 3.87 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPD-S-202-C-008 Optical Fibre Cable Manhole D.pdf
Tender Document • 0.41 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPD-S-202-C-079 Typical Fencing Details For E.pdf
Tender Document • 0.64 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPDDL-PED-5012_General Arrangement of GI Cabl.pdf
Tender Document • 1.26 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPDDL-SID-1008-02_Installation Drawing of 33k.pdf
Tender Document • 0.71 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPDDL-SID-1009-01_IDENTIFICATION TAG EHV CABL.pdf
Tender Document • 0.55 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPDDL-SID-1010-01_Warning tape for EHV cable .pdf
Tender Document • 0.47 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPDDL-SID-1016_Earthing Philosophy for EHV Pr.pdf
Tender Document • 2.70 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPDDL-SID-1022_Standard Drawing of RCC Cable .pdf
Tender Document • 0.74 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Applicable Specifications_TPDDL-SID-1023_Standard Installation Drawing .pdf
Tender Document • 3.46 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_e-Payment Mandate Form.pdf
Tender Document • 0.18 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Fabricator List.pdf
Tender Document • 0.51 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Pre-Bid_Query_Format_TPDDL-ENGG-ENQ-200001970-26-27.xlsx
Tender Document • 0.01 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_SSI question explanation.docx
Tender Document • 0.03 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Supplier Sustainability Index (SSI) Questionnaire Format.xlsx
Tender Document • 0.03 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_TPDDL-ENGG-ENQ-200001970-26-27_LTC of 33KV Cable.pdf
Tender Document • 0.93 MB
S0056-01-07-2026 03-19-51 PM-Tender-TPDDL-ENGG-ENQ-200001970-26-27_Tender-TPDDL-ENGG-ENQ-200001970-26-27_Vendor Appraisal Form - Supply.pdf
Tender Document • 0.32 MB
Notification of Technically Qualified Bidders_20260903122411753.pdf
Corrigendum • 0.62 MB
Pre-Bid_Query_200001970_response_20261005061836549.pdf
Corrigendum • 0.44 MB
Pre-Bid_Query_200001970_response_20261005061836549.pdf
Corrigendum • 0.44 MB
Notification of Technically Qualified Bidders_20260903122411753.pdf
Corrigendum • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .