Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹71.9 LAccepted-Finance CO RPORTARATE OFFICE UJJAYANTA MARKET BLOCK C ROOM NO 310 AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799002 | ₹71.9 L | L-1 | Accepted-Finance Accepted being L-1 |
| 2 | L-2₹78.8 L+₹6.9 L (9.56%)Rejected-Finance | ₹78.8 L+₹6.9 L (9.56%) | L-2 | Rejected-Finance Rejected being L-2 |
| 3 | L-3₹82.8 L+₹10.9 L (15.1%)Rejected-Finance | ₹82.8 L+₹10.9 L (15.1%) | L-3 | Rejected-Finance Rejected being L-3 |
| Sl No | Description | Qty | Unit | Lalhminghlua Zote L2 | M/S CHITTARANJAN SAHA & OTHERS L1 | Nidhi Creative Infrastructure Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00 | Maintenance of Shoulder - Providing spot reconditioning, reconstruction and regravelling to repair specific erosion or other damages for restoring the eroded area to originally constructed cross section on cuts and fills slopes/shoulders conforming to Technical Specifications Clause no.3002. Fill material should be brought from borrow areas located outside ROW conforming to Technical Specification no. 305. Watered and well compacted with plate compactor or power rammer with all leads and lifts as directed by the Engineer | 770.25 | cum | 105 ₹80,876.25 Lowest | 150 ₹1,15,537.5 | 123 ₹94,740.75 |
| 2.00 | Hill Side Drain Clearance - Unlined Side Drain - Clearing, cleaning, deepening and reshaping of
roadside unlined/kaccha drains and making shallow kaccha lateral drains on shoulders wherever required, including removal and disposal of sediments, extraneous debris and vegetation growth blocking thefree flow from site outside ROW with all leads and lifts complete in all respects as directed by the Engineerin-Charge and as per Maintenace Standards Clause no. 3.1 | 5,135 | Rm | 65 ₹3,33,775 Lowest | 200 ₹10,27,000 | 72 ₹3,69,720 |
| 3.00 | Clearing culverts - Clearing slab/box type culverts and pipe culverts including clearing, cleaning and reshaping of upstream and down stream faces of these culverts within right of way. The job includes disposal of excess material recovered from site including vegetation outside ROW with all leads and lifts complete in all respects as per direction of Engineer-in-Charge. and as per Maintenance Standards Clause 3.1 | 15 | No. | 19,000 ₹2,85,000 | 20,000 ₹3,00,000 | 4,000 ₹60,000 Lowest |
| 4.00 | Clearing road side vegetation, brush wood mooli bamboos, overgrown grass including removal etc. - Removal of rank vegetation/weeds and undesirable vegetation from shoulders, embankment slopes upto ROW (both sides) complete in all respects including breaking of clods, rough dressing and disposal of waste material and vegetation at a place outside ROW as per direction of Engineer-In-Charge and as per Maintenance Standards Clause 3.3 | 1,84,860 | Sqm. | 1 ₹1,84,860 Lowest | 7 ₹12,94,020 | 8 ₹14,78,880 |
| 5.00 | Repair of Joint Groove with Epoxy Mortar or Epoxy concrete | 1,450 | cum | 1,360 ₹19,72,000 | 600 ₹8,70,000 Lowest | 1,627 ₹23,59,150 |
| 6.00 | Repair involving removal of Old joint sealant and sealing with fresh sealant in cement concrete pavement. | 1,550 | cum | 230 ₹3,56,500 Lowest | 500 ₹7,75,000 | 277 ₹4,29,350 |
| 7.00 | Thermostatics Road marking | 1,925.63 | Sqm. | 1,420 ₹27,34,394.6 | 700 ₹13,47,941 Lowest | 750 ₹14,44,222.5 |
| 8.00 | Painting of Kerb,parapet walls/crash barriers etc. | 60 | Rm | 300 ₹18,000 | 100 ₹6,000 Lowest | 398 ₹23,880 |
| 9.00 | Lumpsum provision for emergency works (landslip clearance) | 20,800 | cum | 92 ₹19,13,600 | 70 ₹14,56,000 Lowest | 97 ₹20,17,600 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
6 May 2026, 12:00 pmClosed
Chief Engineer, PWD, Highway, Aizawl, Mizoram
O/o the Chief Engineer, PWD, Highway, Aizawl
Special Repair on NH108or44A Rockfall ByPass Between km 5.700 and km 10.835 in the State of Mizoram.
2026_MoRTH_904276_1
NIT No. 1/IFB/SBD/CE-HW/2026-27 Dt. 01.04.2026
Open Tender
Civil Works - Highways
Item Rate
365 days
Between km 5.700 and km 10.835
As per tender documents
5 documents required · 5 mandatory
₹2,500
Chief Engineer, PWD, Highway, Mizoram, Aizawl
₹1.7 L
O/o the Chief Engineer, PWD, Highway, Aizawl
14 Jul 2026
1 Apr 2026
7 May 2026
1 Apr 2026
6 May 2026
16 Apr 2026
1 Apr 2026 - 15 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of Shoulder - Providing spot reconditioning, reconstruction and regravelling to repair specific erosion or other damages for restoring the eroded area to originally constructed cross section on cuts and fills slopes/shoulders conforming to Technical Specifications Clause no.3002. Fill material should be brought from borrow areas located outside ROW conforming to Technical Specification no. 305. Watered and well compacted with plate compactor or power rammer with all leads and lifts as directed by the Engineer | - | cum | - | - |
| 2 | Hill Side Drain Clearance - Unlined Side Drain - Clearing, cleaning, deepening and reshaping of
roadside unlined/kaccha drains and making shallow kaccha lateral drains on shoulders wherever required, including removal and disposal of sediments, extraneous debris and vegetation growth blocking thefree flow from site outside ROW with all leads and lifts complete in all respects as directed by the Engineerin-Charge and as per Maintenace Standards Clause no. 3.1 | - | Rm | - | - |
| 3 | Clearing culverts - Clearing slab/box type culverts and pipe culverts including clearing, cleaning and reshaping of upstream and down stream faces of these culverts within right of way. The job includes disposal of excess material recovered from site including vegetation outside ROW with all leads and lifts complete in all respects as per direction of Engineer-in-Charge. and as per Maintenance Standards Clause 3.1 | - | No. | - | - |
| 4 | Clearing road side vegetation, brush wood mooli bamboos, overgrown grass including removal etc. - Removal of rank vegetation/weeds and undesirable vegetation from shoulders, embankment slopes upto ROW (both sides) complete in all respects including breaking of clods, rough dressing and disposal of waste material and vegetation at a place outside ROW as per direction of Engineer-In-Charge and as per Maintenance Standards Clause 3.3 | - | Sqm. | - | - |
| 5 | Repair of Joint Groove with Epoxy Mortar or Epoxy concrete | - | cum | - | - |
| 6 | Repair involving removal of Old joint sealant and sealing with fresh sealant in cement concrete pavement. | - | cum | - | - |
| 7 | Thermostatics Road marking | - | Sqm. | - | - |
| 8 | Painting of Kerb,parapet walls/crash barriers etc. | - | Rm | - | - |
| 9 | Lumpsum provision for emergency works (landslip clearance) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
SBDSRNH44ARockFallBypass.pdf
Tender Documents • 2.05 MB
BOQ_950467.xls
BOQ • 0.31 MB
BidextensionSR_20260429_0001.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .