Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-AOC | ₹3.0 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹3.0 LRejected-AOC | ₹3.0 L | 2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RAVI K L1 | Prabhaharan L2 |
|---|---|---|---|---|---|
| 1.00Part I - Repairs to ceiling at Sengarayankattalai PUM School (Three Class Room – west side) in Elakkurichi Panchayat | |||||
| 2.00 | Clean removal of cement plaster from walls including all labour charges etc. complete | 158.48 | Sq.m | 9 ₹1,426.32 | 9.12 ₹1,445.34 |
| 3.00 | Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work. | 158.48 | Sq.m | 308.5 ₹48,891.08 | 309 ₹48,970.32 |
| 4.00Repairs to ceiling at Sengarayankattalai PUM School (Three Class Room – North East side) in Elakkurichi Panchayat | |||||
| 5.00 | Clean removal of cement plaster from walls including all labour charges etc. complete | 158.48 | Sq.m | 9 ₹1,426.32 | 9.12 ₹1,445.34 |
| 6.00 | Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work. | 158.48 | Sq.m | 308.5 ₹48,891.08 | 309 ₹48,970.32 |
| 7.00Repairs to ceiling at Sengarayankattalai PUM School (Three Class Room – South East side) in Elakkurichi Panchayat | |||||
| 8.00 | Clean removal of cement plaster from walls including all labour charges etc. complete | 158.48 | Sq.m | 9 ₹1,426.32 | 9.12 ₹1,445.34 |
| 9.00 | Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work. | 158.48 | Sq.m | 308.5 ₹48,891.08 | 309 ₹48,970.32 |
| 10.00Repairs to ceiling at Thoothur PUE School (Three class Room – South face ) in Thoothur Panchayat | |||||
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
27 Nov 2025, 3:00 pmClosed
Block Development Officer(B.Pt), Thirumanur
Block Development Office, Thirumanur,Ariyalur District
Package II Repair work of Ceiling Sengarayankattalai PUM School (Three Class Room west side), Sengarayankattalai PUM School (Three Class Room North East side), Sengarayankattalai PUM School (Three Class Room South East side) in Elakkurichi, Tho
2025_RDTN_625103_1
Rc.No.3019/2025/A2 dated 20.11.2025
Open Tender
Civil Works - Buildings
Block Development Office, Thirumanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,000
Yes
25 Feb 2026
20 Nov 2025
27 Nov 2025
20 Nov 2025
27 Nov 2025
20 Nov 2025
Amount
Part I - Repairs to ceiling at Sengarayankattalai PUM School (Three Class Room – west side) in Elakkurichi Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Sengarayankattalai PUM School (Three Class Room – North East side) in Elakkurichi Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Sengarayankattalai PUM School (Three Class Room – South East side) in Elakkurichi Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Thoothur PUE School (Three class Room – South face ) in Thoothur Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Villupanankurichi PUM School (Three class Room – South face ) in Villupanankuirchi Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Prabhaharan (BID ID -1521073)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.76 MB
PB.pdf
Tender Documents • 0.56 MB
TB.pdf
Tender Documents • 0.89 MB
BOQ_747485.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid