| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | L1 | Accepted-Finance Paper complete | |
| 2 | L2₹3.0 L+₹299.12 (0.10%)Accepted-Finance | L2 | Accepted-Finance Paper complete | |
| 3 | L3₹3.0 L+₹3,290.32 (1.10%)Accepted-Finance | L3 | Accepted-Finance Paper complete |
Tender Value
₹3.0 L
EMD Value
₹30,000
Closing Date
30 Sept 2026, 5:00 pmClosed
Executive Office
Executive Officer Nagar Palika Parishad Bulandshah
4600WorkTender0003
2026_DOLBU_1182262_1
439 Date 01-09-2026
Open Tender
Civil Works
Percentage
60 days
Executive Officer Nagar Palika Parishad Bulandshah
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
Executive Officer Nagar Palika Parishad Bulandshah
₹30,000
7 Oct 2026
7 Sept 2026
1 Oct 2026
7 Sept 2026
30 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old damaged brick work in cement mortar | 1.46 | cum | 600 | ₹876 |
| 2 | First class B/w in 1:4 Cement C'sand mortor in Sub Structure including supply of all meterial labour t&P etc required for proper completion of work | 1 | cum | 5,170 | ₹5,170 |
| 3 | RCC Work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Raft foundation and Footing | 1.2 | cum | 8,100 | ₹9,720 |
| 4 | RCC Work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Beam | 2.53 | cum | 9,190 | ₹23,250.7 |
| 5 | RCC Work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Column or Wall | 1.07 | cum | 9,310 | ₹9,961.7 |
| 6 | Supply, Fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications including supply of all material, labour, Tools & Plants etc. required for proper completion of work | 2.64 | Qtl | 8,631 | ₹22,785.84 |
| 7 | First class brick work in 1:4 cement and coarse sand mortar in Super Structure & Filling one brick thick including supply of all materials, labour and T & P etc. required for proper completion of work. | 5.2 | cum | 5,930 | ₹30,836 |
| 8 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work | 840 | Kg | 85 | ₹71,400 |
| 9 | Apply two coat superior synthetic enamal paint including primer coat on steel surface | 34.82 | sqm | 85 | ₹2,959.7 |
| 10 | Washed stone grit plaster on exterior walls height upto 10 metre above ground level, in two layers, under layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand ), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 Kg of cement per square metre, top layer 15 mm cement plaster 1:1/ 2:2 (1 cement: 1/2 coarse sand : 2 stone chipping 10 mm nominal size), in panels with groove all around as per approved pattern, including scrubbing and washing the top layer with brushes and water to expose the stone chippings ,complete as per specification and direction of Engineer-in-charge (payment for providing grooves shall be made separately). | 65.25 | sqm | 998 | ₹65,119.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_2222574.xls
BOQ • 0.25 MB
46Amendment28092026.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .