Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.1 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹44.3 L+₹5.1 L (13.2%)Rejected-Finance | L2 | Rejected-Finance HIGHER BIDDER | |
| 3 | L3₹50.4 L+₹11.3 L (28.8%)Rejected-Finance | L3 | Rejected-Finance HIGHER BIDDER | |
| 4 | Rejected-Technical GURDASPUR ROAD OPP WAREHOUSE PATHANKOT 145 001 PB | PATHANKOT | PUNJAB | 145001 | - | Rejected-Technical Eligibility Criteria Not Fulfilled | |
| 5 | Rejected-Technical | - | Rejected-Technical Eligibility Criteria Not Fulfilled |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
23 Feb 2021, 6:00 pmClosed
SH A K SINGH SE CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
OUTSOURCING FOR MANNING AND OPERATION OF LIFTS AND WATER SUPPLY INSTALLATIONS AT MAP PHASE II NEAR NEW LEADING VARUNAPURI UNDER AGE EM II OF GE NW VASCO
2021_MES_414928_1
85344/E8
Open Tender
Civil Works
Item Rate
334 days
CWE NAVY VASCO
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹1,000
Yes
GE NW VASCO
₹1.0 L
Yes
12 Apr 2021
21 Jan 2021
25 Feb 2021
21 Jan 2021
23 Feb 2021
16 Feb 2021
Amount
Outsourcing services of 2 Nos of Lift in each building (G+9) at MAP Phase-II (Total 06 Nos of building) near Map Phase -I site new leading area at varunapuri-III,16 hrs on every day in two shifts per day by One Skilled Operator for each shift as under:- 1st shift 0600 hrs to 1400 hrs - 06 Operating services 2nd shift 1400 hrs to 2200 hrs - 06 Operating services Total No of Lift operating services = 12 Nos (One Skilled operator shall operate two lifts in each building) including Sundays and Holiday all as specified and as directed.
Notes:- (a) The operator shall be experience holder of two years in particular field with minimum qualification of 12 or ITI. (b) The 16 hours operation time 0600 hrs to 1400 hrs and 1400 hrs to 2200 shall be considered as two shift of 8 hrs working in one day. Two shifts considered as one day (c) The rate quoted shall be deemed to include for any minor repairs of passenger lifts as required for smooth running of lifts without any extra cost and also the operator has to maintain the breakdown register, attendance register ,maintenance register. (d) The contractor will hand over the lift to the department in good working condition on expiry of contract period. (e) The operator shall check ARD of lifts for proper functioning daily before commencement of shift duty and the same shall be recorded in the maintenance register. (f) The operator shall check all equipment for their proper functioning and shall be reported to concerned JE E/M or Engineer-in-Charge (g) Two operators in two shifts of 8 hrs shall be employed in each building at 06 places (h) During the off period ie 22.00 hrs to 06.00 hrs ,lifts shall be operated by the user in case of emergency.
Rendering services round the clock (three shifts ) by One Skilled FGM including Sundays and Holidays and operation of water supply installations ,DG set and LT panels including connected items such as valves/ pipelines connected to pumping mains and electrical items such as main switch, starter, voltmeter, ammeter, panel board, AMF panel all as specified and as directed at Map phase -II building near Map phase-I site consisting of electrical driven pump sets-04 Nos ,Diesel engine pumpset-01 No ,DG set 320 KVA -01 No and all panel board including AMF panel and removing grass and bushes, cutting branches of trees growing in the entire area of water supply installation and keep the installation neat and clean throughout the period of Contract all as specified and as directed. Note:- One pump set shall run at a time for domestic use and fire fighting pumps as and when required.
Notes:- (a) 24 hour period will be considered as a day, pump set shall be operated in three shifts of 08 hours each i,e, 1st shift 0600 to 1400 hours, 2nd shift 1400 to 2200 hours, and 3rd shift 2200 to 0600 hours of the next day as directed. Contractor shall employ one operator per shift. (b) Daily maintenance all as per manufacturer's instruction including greasing, lubrications, replacement of gland ropes etc, including area cleaning shall be included in the rate quoted. The unit rate quoted against item shall deemed to inclusive of the cost of items required for daily maintenance of minor nature and any repair to the foot valve system by replacing the leather flap, rubber insertion, nut & bolts etc. Operator shall maintain maintenance register for each installation showing all day to day maintenance / activities carried out daily (c) Log sheet showing daily running hours and maintenance carried out ie consumption of grease, chlorine chemical granules, lubricants, DHPP etc shall be maintained by the contractor in their installations and same will be checked by the Engineer-in-Charge periodically and daily by JE. All log sheets / maintenance register duly signed by operator and contractor shall be produced for verification.
(d) Consumption of bleaching powder/chlorine chemical granules shall be regulated by the Dept. However, supply of the items is out of the scope of work and DHPP shall be filled in DG's at regular intervals by Department to avoid interruption in DG operation under the supervision of JE concerned. (e) The rate quoted shall deemed to be inclusive of topping up of battery electrolyte, cleaning/replacement of battery terminals, charging of batteries and replacement of fan belt, fuel cap if required etc all as directed. (f) Pumps and DG sets shall be operated by the same operators as required and directed. (g) Attendance register and duty roaster shall be maintained in each installation. (h) Water testing kit and testing solution shall be provided and maintained at all time in each installation. (j) The DG set will be operated as and when power supply failure or as directed.
Notes for Item Nos 1 to 2:- (a) The rates quoted shall be inclusive of all taxes ,cess, levies etc as applicable including GST (b) The prevailing rate,wage,contribution etc shall be as applicable as on the bid submission end date. (c) In view of COVID-19 alerts various restrictive instructions issued concerned authorities from time to time. Hence additional precautions essential for the work shall be taken by the contractor by way of provisioning of masks, hand sanitizers, gloves etc to workmen and all local instructions issued by the Concerned Authorities and Station Authorities shall be complied with all relevant safety precautions covered under Model Rules for the protection of health and sanitary arrangement for workmen (Annexure ‘C’ of IAFW-2249) shall be strictly followed. Nothing extra is admissible on this account
(d) The contractor shall also deploy additional man power as relief against weekly off,leave,holidays etc all as per existing Labour Act and shall substitute the operator accordingly for which no extra payment admissible. The unit rate quoted against items in Schedule ‘A’/BOQ shall be inclusive of this provision also. (e) The contractor shall pay the wages to the operator through e-payment i.e Aadhar linked bank accounts and Credit to their bank account. The wages shall not be less than prevailing minimum wages fixed by state Govt or central Govt whichever is more.
(f) It is responsibility of contractor to deposit the employees provident fund (EPF) to the concerned authority as per the prevailing scales as laid down by the Ministry of labour for all Electrician/operator/helper (as applicable) and necessary proof to this regard shall be submitted to Engineer-in-Charge for verification and records. The quoted rate shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, he shall be liable for action as deemed fit. Decision of GE in this regard shall be final and binding. (g) The contractor shall maintain all the registers under various labour law rules, 2017 and shall be produced to GE and as well as officers detailed by labour department.
BRITE INDUSTRIES
M/S G.N.POWAR
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .