Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 863 JOSHI ROAD KAROL BAGH NEW DELHI DELHI 110005 | CENTRAL DELHI | DELHI | 110005 | Admitted-Finance |
| 2 | Admitted-Finance 2 MORE SARAI CH CHOWK DELHI CENTRAL DELHI DELHI 110006 | NORTH DELHI | DELHI | 110006 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹40,500
Closing Date
5 Sept 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE (SDW) VII
NSTP Coronation Pillar Delhi 110009
Replacement of 180 HP Induction Motor and Starter for Sewage Pump Set No 7 at Nehru Vihar SPS including allied work re invite
2022_DJB_228351_2
NIT No 11 (2022-23)
Open Tender
Miscellaneous Works
Works
60 days
NSTP Coronation Pillar
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Online
₹40,500
17 Oct 2022
27 Aug 2022
5 Sept 2022
27 Aug 2022
5 Sept 2022
27 Aug 2022
Supply Portion Supply of 180 HP, 8 Pole, IE2 Efficiency, Horizontal Foot mounted “Totally Enclosed Fan Cooled (TEFC)" 3 Ph Squirrel Cage Induction Motor with Enclosure conforming to protection IP 55, continuously rated suitable for operation on 415V+/-10%, 50Hz+/-5%, A.C. supply with class 'F' insulation for 50 Deg C ambient temperature and altitude less than 1000M above MSL and confirming to IEC:60034-1 & IS 12615:2018. Make: KEC/CG/ DJB Approved makes
Supply of complete AC VFD Panel with drive for operation of 132 KW /180 HP, 3 Ph Squirrel Cage Induction Motor. Make: ABB/ DJB Approved makes
Supply of MS Base frame for foundation of the pump set made out of 150 x 100 mm MS Channel
Supply of PH-390 (H), Tyre type automatic flexible Cushion couplings. Make: Unique / Finner
Supply of single core 240 Sq mm armoured aluminium conductor PVC insulated and PVC sheathed / XLPE cable for working voltage upto1.1 KV. Make:- Gloster/ ICL/ ICC/ Universal/ CCI/ Havells/ Grandly
Supply of 240 sq mm long barrel heavy duty thimbles. Make: Dowel / national
Supply of M. S Nut bolts washer. (DSR E&M 2018: Item Code 1034)
Supply of neoprene rubber sheet
JOB Work Disconnection of electric connection of motor and taking it out from base frame with the help of HOT Crane after cutting of foundation bolt and removing coupling of pump and motor.
Closing of Suction & Delivery side sluice valves for isolating the entire work area in the dry sump. Dismantling the existing pump by cutting off nut bolts with the help of a gas cutter and shifting the pump from the foundation frame. The job also includes fixing of the dead flanges on suction & delivery sides.
Dismantling of the rusted & damaged MS base frame from the RCC foundation by Cutting the nut bolts with the help of a gas cutter and taking the frame upto floor level. Breaking of RCC with the help of power hammer for removing loose & damaged foundation bolt from pockets in RCC foundation as required for fresh foundation. This includes removing malba of CC from the foundation site by manual labour from the dry sump well to outside of the pump.
Providing & Fixing of the new Foundation bolt in pocket by proper welding to MS Jall of RCC with proper support and filling of CC in ratio 1:2:4 for grip of foundation bolt in CC structure and also making wet layer of cement in old CC Structure for Proper mixing and required civil work with proper levelling. The job also includes fixing of new base frames on foundation.
Fixing of Pump on foundation frame with help of HOT crane and making of proper alignment with suction and delivery line of existing system with new nut bolts and packing etc as per required. Fixing of the newly supplied motor on the foundation frame. The job also includes proper alignment on M S Channel after fixing the newly supplied coupling with suitable bores.
Installation of the newly supplied VFD Panel and laying of power cables from VFD Panel to motor. The job also includes connection of the cables in motor & VFD.
Testing and commission of complete Work in the presence of Engineer-in-charge with full satisfaction
Auro Green Products
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .