Loading…
Loading…
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
18 Jun 2026, 6:00 pm5d left
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Const of T/Road from PMGSY Road Kundai to House of Mohd Rafiq Lone SO Mohd Iqbal Lone W.no.05 PytShajroo A Block Mahore under scheme CDF For the year 2025-26
2026_RDPR_312116_4
e-NIT No. 19 of REW REASI of 2026-27
Open Tender
Civil Works
90 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹2,000
11 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : including all leads, lift and carriage complete | 50 | cum | 91.75 | ₹4,587.5 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :25 meter beyond 1 m from cutting edge | 3.6 | cum | 576.45 | ₹2,075.22 |
| 3 | Providing and laying Dry stone Aggregate | 0.54 | cum | 1,500 | ₹810 |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah Stone including all leads, lift and carriage complete | 13.82 | sqm | 5,402.9 | ₹74,668.08 |
| 5 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge | 1 | No. | 3,000 | ₹3,000 |
| 6 | Carriage of Cement from an avg. distance of 25 KM by MT & 100 Meter by AT. | 1.14 | MT | 581.39 | ₹662.78 |
| 7 | Carriage of stone and aggregate & sand from an avg. distance of 45 K.M by MT & 100 Meter by AT. | 6.22 | CUM | 777.59 | ₹4,836.61 |
| 8 | Carriage of sand and aggregate & sand from an avg. distance of K.M by MT & 600 Meter by AT. | 12.58 | CUM | 801.48 | ₹10,082.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_1010560.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid