| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹6.5 L (5.73%)Admitted-Finance | ₹1.2 Cr+₹6.5 L (5.73%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹12.0 L (10.7%)Admitted-Finance 52E JEROMIA APARTMENTS IIND AVENUE ASHOK NAGAR CHENNAI TAMIL NADU 600083 | CHENNAI | TAMIL NADU | 600083 | ₹1.2 Cr+₹12.0 L (10.7%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹16.3 L (14.5%)Admitted-Finance | ₹1.3 Cr+₹16.3 L (14.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.3 Cr+₹17.3 L (15.3%)Admitted-Finance NA | NA | NA | 121004 | ₹1.3 Cr+₹17.3 L (15.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.V.Engineering Works L5 | G NAGESWARAN L13 | K Sathyapalan Engineering Contracts L12 | P.S CONSTRUCTION PVT LTD L7 | U.P.RAMMAIAH CIVIL ENGINEER CONTRACTOR L8 | M/s ANIRUTH K ENTERPRISES L11 | A.G. CONSTRUCTIONS L1 | HDC POWER SYSTEMS PVT LTD L3 | Sneham Enterprises L4 | UNICONSYS PRIVATE LIMITED L9 | Vendigge Engineering Projects Private Limited L10 | M.Govindaraj contractors and earth movers L6 | GULF ENGINEERS AND CONSTRUCTORS PRIVATE LIMITED L14 | Anish Infrastructure (Coimbatore) Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10.00IMPORTANT NOTES TO THE CONTRACTOR | |||||||||||||||||
| 20.00Since the entire site activity is planned at green belt site which is planted with almost 10,000 trees ,care shall be taken by contractor to see that their site activities does not hamper the trees at site and the workers of TNFD maintaining the green belt in any manner. | |||||||||||||||||
| 30.00Contractor should make own arrangements for safeguarding of individual materials and tools at site.Any loss in this account will not be attributable to CPCL. | |||||||||||||||||
| 40.00Considering the present Covid-19 situation, contractor shall ensure that sufficient manpower is available to take up the work and complete within the stipulated completion period without any delay adhering to all safety guidelines issued by Govt. in view of Covid-19. Also,Face mask and Hand gloves are mandatory as part of PPEs for all persons in addition to safety helmet,safety shoes,safety jackets etc.The entire work is to be executed giving utmost importance to safety. | |||||||||||||||||
| 50.00The job includes taking levels and transferring as per the approved drawings throughout the period of work. No separate payment will be made for levelling and surveying including equipments and materials required for surveying along with skilled labour at site as per the site requirement. | |||||||||||||||||
| 60.00Dewatering of accumulated /sub soil water from any source and keeping the surface dry for subsequent works will be in the contractor scope and no extra payment will be made. | |||||||||||||||||
| 70.00The entire work is to be executed outside CPCL premises at Amullaivoyal / Vaikkau Villages and all the equipments, tools and tackles, construction materials for the work to be transported and stored at site without hindering the Green Belt Development project by TNFD | |||||||||||||||||
| 80.00Formation of approach to the construction site wherever required will be in the contractor scope and No extra payment will be made by CPCL.Especially during rains ,contractor to make own arrangement for accesing the site of work and no additional payment will be made for formation of approach. | |||||||||||||||||
| 90.00The Construction site is outside the Refinery Premises, hence it is contractor responsiblity to take necessary measures for handling local problems /issues and to safeguard materials, equipments and personnels. CPCL will not be in a position to address issues arising out of local problems and no extra payment will be made by CPCL. | |||||||||||||||||
| 100.00Construction power and construction water is in contractor scope. | |||||||||||||||||
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
7 Sept 2020, 11:00 amClosed
GM ( Proj-III)
Admin block-II CPCL Manali
Pavement works in green belt site of CPCL at Amullaivoyal Area
2020_DGMMC_7237_1
CPCL/PMC/T-017/2020-21
Open Tender
Civil - All
Item Rate
240 days
CPCL Manali
Please Refer Tender Document
7 documents required · 7 mandatory
₹0
₹1.9 L
Yes
CPCL Manali
30 Dec 2020
6 Aug 2020
7 Sept 2020
6 Aug 2020
7 Sept 2020
20 Aug 2020
17 Aug 2020
Amount
IMPORTANT NOTES TO THE CONTRACTOR
Since the entire site activity is planned at green belt site which is planted with almost 10,000 trees ,care shall be taken by contractor to see that their site activities does not hamper the trees at site and the workers of TNFD maintaining the green belt in any manner.
Contractor should make own arrangements for safeguarding of individual materials and tools at site.Any loss in this account will not be attributable to CPCL.
Considering the present Covid-19 situation, contractor shall ensure that sufficient manpower is available to take up the work and complete within the stipulated completion period without any delay adhering to all safety guidelines issued by Govt. in view of Covid-19. Also,Face mask and Hand gloves are mandatory as part of PPEs for all persons in addition to safety helmet,safety shoes,safety jackets etc.The entire work is to be executed giving utmost importance to safety.
The job includes taking levels and transferring as per the approved drawings throughout the period of work. No separate payment will be made for levelling and surveying including equipments and materials required for surveying along with skilled labour at site as per the site requirement.
Dewatering of accumulated /sub soil water from any source and keeping the surface dry for subsequent works will be in the contractor scope and no extra payment will be made.
The entire work is to be executed outside CPCL premises at Amullaivoyal / Vaikkau Villages and all the equipments, tools and tackles, construction materials for the work to be transported and stored at site without hindering the Green Belt Development project by TNFD
Formation of approach to the construction site wherever required will be in the contractor scope and No extra payment will be made by CPCL.Especially during rains ,contractor to make own arrangement for accesing the site of work and no additional payment will be made for formation of approach.
The Construction site is outside the Refinery Premises, hence it is contractor responsiblity to take necessary measures for handling local problems /issues and to safeguard materials, equipments and personnels. CPCL will not be in a position to address issues arising out of local problems and no extra payment will be made by CPCL.
Construction power and construction water is in contractor scope.
EARTHWORK: Earthwork in excavation in all types of soil, including soft or hard murrum, but excluding soft and hard rock, using mechanical means (Hydraulic Excavators) / Manually for depth upto 1.5m,including removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, levelling, grading and ramming of bottoms, compacting excavated area with earth rammer/plate compactor, dewatering of accumulated/sub-soil water from any source and keeping the surface dry for subsequent works and disposal or stacking of excavated material within a lead of 100m, as directed including providing temporary supports to existing water pipes etc. all complete as per the specifications and directions of Engineer-in-Charge.
PCC 1:4:8 : Providing and laying PLAIN CEMENT CONCRETE (PCC) 1:4:8 by volume (1Cement : 4 M-Sand:8 Coarse aggregate) with OPC 53 grade and 40mm & down size graded crushed stone aggregates for all depths wherever required like under foundations , under toe wall filling or any other works etc., including shuttering, tamping, ramming, vibrating, curing, etc. all as specified in any shape, position, thickness and finishing the top surface rough or smooth as specified and directed all complete including cement cost etc, all complete as directed by Engineer-in-Charge.
PCC 1:2:4 : Providing and laying PLAIN CEMENT CONCRETE (PCC) 1:2:4 by volume (1Cement : 2 M-Sand:4 Coarse aggregate) with OPC 53 grade and 20mm & down size graded crushed stone aggregates for all depths and heights wherever required like in toe walls/kerb walls or any other works etc., tamping, ramming, vibrating, curing, etc. all as specified in any shape, position, thickness and finishing the top surface rough or smooth as specified and directed all complete including cement cost etc. but excluding shuttering works alone, all complete as directed by Engineer-in-Charge. (Note: The quoted rate shall exclude Formwork/Shuttering and it will be paid separately in relevant items)
REINFORCEMENT STEEL: Supplying, fabricating and placing in position High strength deformed steel bar REINFORCEMENT (conforming to IS 1786, grade Fe500) for RCC work, straightening, cleaning, decoiling, cutting, bending to required shapes and lengths as per details, binding with contractor's own 16 Standard Wire Gauge(SWG) black soft annealed binding wire at every intersection, supplying and placing with proper cover blocks, supports, overlaps, welding spacers, lifting hooks etc for all heights & depths etc. removing of scraps from site, all complete as directed by Engineer-in-Charge.
FORMWORK: Providing, fixing FORMWORK including centering, shuttering ,strutting and propping in SUB STRUCTURE at all depths wherever required including removal of the shuttering after the specified period is over and as directed by the Engineer- in- Charge complete with all materials, labour, consumables etc.(Form work shall be supplied by the contractor and shall remain the property of the contractor)
Supplying and fixing in position 25mm thick BITUMEN IMPREGNATED FIBRE BOARD conforming to IS:1838 of approved quality in expansion joints at all locations and levels etc. all complete as specified and directed by EIC.
Supplying and sealing EXPANSION JOINTS 25 mm wide and 12mm deep at all locations and levels with approved two part liquid POLYSULPHIDE SEALING COMPOUND as per IS:12118 including raking of joints etc. all complete as specified and as directed by EIC.
TRANSPORTING & DISPOSING the SURPLUS EARTH & DEBRIS including shrubs and vegetations from construction area (beyond the initial lead of 100m) to designated areas up to a lead of 3km including re-excavating the deposited soil excavated earlier, transportation, loading, unloading, laying at all depths & heights, stacking, levelling and dressing both areas (viz., from where the earth is transported and where it is deposited) to required levels and slopes complete with all lifts as directed by Engineer in Charge.( Note: If measured by stacks 30% voids will be deducted.)
LIME SAND PILES: Providing 150mm Dia LIME- SAND PILES filled with Dry mix of Lime+M Sand (Ratio 1:1) ,depth of pile 1.5m starting at approx. 450mm below FGL .The lime pile is to be formed by boring to a depth of 1.5 m using simple helical hand auger of 150 mm diameter ,erecting,hire charges for drilling equipments and compacting by manual or by machineries,compacting each layer (every 300mm) with vibratory compactor and at inaccessible places with wooden / steel rammers.etc.complete as directed by the EIC. The cost shall include cost and conveyance of all materials, labours, machinery, etc. complete . The intial excavation of 450mm to reach the piling starting level will be paid under relevant item of SOR. In case of any back filling in the area where contractor has excavated more than that shown in approved drawings is not payable.(Note: Minimum 10 Hand Auger Drilling equipments per day should be used for boring the piles.)
Providing and laying in position LIME: EARTH SLURRY by dry mixing 3% to 5% of lime by volume of available excavated earth . The rate shall include the cost of necessary materials, labour and machineries, transportation charges,labour costs,mixing the Lime with available excavated earth manually or by machineries in compacted layers of 150mm each, curing and compacting ,compacting each layer with vibratory compactor and at inaccessible places with wooden / steel rammers. The subgrade is to be compacted up to 90 to 95% of maximum dry density (Standard Proctor Test) of lime mixed earth and the maximum dry density of lime earth shall be arrived by conducting Standard Proctor Test as per IS 2720 Part-7.The density of lime mixed earth may be ensured at field by conducting field density test as per IS 2720 Part – 29 as directed by the EIC, testing,curing, tools and tackles, making the surface good to receive the finishes, protecting the newly placed Lime Slurry from rain / heat with PVC sheets , making necessary arrangements for clearing the area of debris, providing required labour and hoisting at all levels ,leads and lift etc.complete as directed by EIC.
Providing 15mm THICK CEMENT PLASTER in cement mortar 1:4 (1Cement:4 M sand) on PCC/RCC surfaces including preparation of base, cleaning, scaffolding if required, finishing, curing including mouldings and providing grooves in plaster etc. as specified for all heights including labour charges,tools and tackles,material costs etc. as per specifications and as directed by the Engineer-in-Charge.
Supplying and applying two coats of WEATHER PROOF EXTERIOR EMULSION PAINT of approved brand of required shade and including a priming coat with emulsion primer of approved brand of the same including necessary scaffolding and surface preparation, sand papering, filling all holes and depressions, cracks with putty, etc. all complete as per specifications and directions of Engineer-in-Charge.
Providing and laying 60mm thick factory made cement concrete interlocking RUBBER MOULD PAVER BLOCK of M30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in two or more colour and pattern over and including 150mm thick compacted bed of M sand filling and filling the joints with sand etc. all complete as per the direction of Engineer in Charge.
Providing and Laying Reinforced NP3 CLASS (MEDIUM DUTY) RCC HUME PIPE of 300mm dia. with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1cement:2M sand) for crossing the poposed driveway/pathway etc.including cutting, lowering, laying in position , with proper level, slope , testing of joints etc. as per specifications and directed by Engineer -in-Charge.
Same as Sl. No. 250 above,but for 450mm diameter.
Supply of JCB on hire basis on all working days from Monday to Saturday on 8 hrs.shift including driver,assistant /fuel/oil/lubricants /all consumables etc. complete. The quoted rate should include mobilization, operator crew/driver /assistant cost, tools, tackles etc., as directed by the Engineer-in-charge.
Supply of POCLAIN-PC 200 on hire basis including fuel/oil/lubricants for excavating , levelling to required slopes and dumping at designated places within the site premises. The quoted rate should include mobilization, operator crew/driver cost, loading, transporting, unloading, tools, tackles etc. complete as directed by Engineer-in-Charge.
Same as Sl. No: 280 above, but for supply of TIPPERS of capacity not less than 10 Cu.m
Same as Sl. No: 280 above, but for supply of TAURUS/approved equivalent TIPPERS of capacity minimum 15 Cu.m.
Supply of 20 FEET TRAILER WITH TRACTOR on hire basis on all working days from Monday to Saturday on 8 hrs.shift ,inclusive of driver,one assistant,all consumables like diesel etc.,with all safety precautions within the designated site premises.The quoted rate should include mobilization, operator crew's/driver /assistant cost, loading, transporting , unloading,2 nos. of unskilled labour for loading and unloading, tools, tackles,wire ropes,pulley blocks,belts,chains etc. for lifting,aligning,tying,stacking etc. all complete as directed by Engineer-in-Charge.
Same as Sl.No No. 310 above but for TRACTOR WITH TRAILER of minimum capacity 2.5 Cu.m.
Supply of UNSKILLED LABOUR to carry out petty works not assessable for measurements/minor repair works, on day-to-day basis. The rates shall include ESI, PF, payroll cost and allowances, fringe benefits, overhead supervision, profits and hand tools.
Anish Infrastructure (Coimbatore) Pvt Ltd
HDC POWER SYSTEMS PVT LTD
Sneham Enterprises
S.V.Engineering Works
M.Govindaraj contractors and earth movers
P.S CONSTRUCTION PVT LTD
U.P.RAMMAIAH CIVIL ENGINEER CONTRACTOR
UNICONSYS PRIVATE LIMITED
Vendigge Engineering Projects Private Limited
M/s ANIRUTH K ENTERPRISES
K Sathyapalan Engineering Contracts
G NAGESWARAN
GULF ENGINEERS AND CONSTRUCTORS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .