Loading…
Loading…
Tender Value
₹97,000
EMD Value
₹1,940
Closing Date
27 Jul 2026, 6:00 pmDue tomorrow
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
BALANCE WORK OF CULVERT AT THAGRI KASSI WARD NO. 2 Pyt LAITER MAGHAI Block Pouni Distt Reasi under capex PRI for the year 2026-27
2026_RDPR_316674_5
e-NIT No. 53 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
MH 0515
₹1,940
20 Jul 2026
20 Jul 2026
28 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2.63 | Cum | 5,733.6 | ₹15,079.37 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.63 | Cum | 7,275.25 | ₹19,133.91 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 315.07 | Kg | 123.2 | ₹38,816.62 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 39 | Sqm | 286.35 | ₹11,167.65 |
| 5 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 24 | Cum | 276.6 | ₹6,638.4 |
| 6 | Construction of CIB (Include concrete/Brick pedestal of size 3' x 2'. Platering ,painting all complete job as per direction of Engineer-in-charge | 1 | No. | 3,000 | ₹3,000 |
| 7Carriage of material from source to site of work by MT/AT including loading, unloading and stacking complete. | |||||
| 7.01 | Cement 1 KM by MT. | 1.77 | MT | 114.44 | ₹202.56 |
| 7.02 | Steel 1 KM by MT. | 0.31 | MT | 114.44 | ₹35.48 |
| 7.03 | Sand & Aggregate 25.0KM by MT. | 5.79 | Cum | 505.34 | ₹2,925.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_1035039.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].