New construction work of Missing link of Hamirpur Kalpi road (SH-91) km 2 to Gangwa dera via Brahma Ka dera road.
2026_CEBAN_1185439_1
1631/30C-Hamirpur Circle/2026 Date 21.08.2026
Open Tender
Civil Works - Roads
Percentage
365 days
PD PWD Hamirpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹8.6 L
S.E., Hamirpur Circle, PWD Hamirpur
18 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m & lead up to 5000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5 (Carted Earth Work) | 9,600 | cum | 245 | ₹23,52,000 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 656 | cum | 2,570 | ₹16,85,920 |
| 3 | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm to water bound macadam-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means | 468 | cum | 3,161 | ₹14,79,348 |
| 4 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement (M-30), thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. | 900 | cum | 7,135 | ₹64,21,500 |
| 5 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 5000 m as per Technical Specification Clause 303.1. (Carted EW) | 2,197 | cum | 237 | ₹5,20,689 |
| 6 | Excavation for Structures / Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 90.1 | cum | 404 | ₹36,400.4 |
| 7 | Sand Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9. | 8.2 | cum | 1,873 | ₹15,358.6 |
| 8 | Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 802,803,1202,1203,1109. | 9.9 | cum | 5,763 | ₹57,053.7 |
| 9 | Brick Masonry Work in 1:4 cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109 / (A). | 31.9 | cum | 6,618 | ₹2,11,114.2 |
| 10 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3 | 99 | sqm | 82 | ₹8,118 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
Tendernotice_2.pdf
PDF • 6.75 MB
BOQ_2232078.xls
BOQ • 0.25 MB
Shuddhipatra1631PDHmr.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .