Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹8.2 L+₹6,087.73 (0.75%)Rejected-AOC 93 SOUTH ZONE COIMBATORE CORPORATION | TIRUPPUR | TAMIL NADU | 638459 | L2 | Rejected-AOC REJECT | |
| 3 | L3₹8.3 L+₹16,477.73 (2.02%)Rejected-AOC 6 641 041 | COIMBATORE | TAMIL NADU | 641041 | L3 | Rejected-AOC REJECT |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
19 Feb 2024, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Bigbazzar Street, Townhall, Coimbatore.
Reconstruction of Storm Water Drain and Providing CC flooring at Pothanur Puthuveethi in Ward No 85 South Zone.
2024_MAWS_421468_82
E8/2024
Open Tender
Civil Works - Roads
Works
120 days
Coimbatore Corporation
As per Tender Condition attached.
3 documents required · 3 mandatory
₹0
₹10,000
18 Nov 2024
13 Feb 2024
20 Feb 2024
13 Feb 2024
19 Feb 2024
13 Feb 2024
Amount
Desilting the existing drain as per the instruction of Departmental officers. Including all initial lead and other labour charges.
Dismantling the damaged Cement mortar concrete wall work as per the instruction of Departmental officers. Including all initial lead and other labour charges.
Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting
Earth work excavation in all soils with initial lead and lift excepting all kinds of rock dumping the excavated materials away from work site manually within 50m initial lead and initial lift etc. complete as per direction of departmental officers.
Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet)
Plain Cement Concrete 1:3:6 (one cement, three fine aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Wall plastering for using cement mortar 1:5(One part of cement, five parts of sand by volume) thickness 12 mm (average) for all internal/external surfaces for drains etc., finished smoothly to one level including curing etc., complete, at all leads and at all heights.
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification.
R KANNAN
A S P AND CO
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .