Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LNot Admitted-Fee/PreQual/Technical JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | L1 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 2 | L2₹11.6 L+₹7,559.49 (0.65%)Rejected-Finance GRAM LALPUR POST PARSHERA TEHSIL SADAR DISTRICT SITAPUR | SITAPUR | SITAPUR | UTTAR PRADESH | L2 | Rejected-Finance Financlal Bid Rejected Due to Heigher Rate | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Ram Vilas L2 | M/S ANIL KUMAR SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning of thick jungle and throney bushes without uprooting. Including cost of all labour and T&Petc. Required for proper completion of work. | 7,650 | sqm | 5.1 ₹39,015 | 4.4 ₹33,660 Lowest |
| 2.00 | Silt Clearance of canal by hydrulic excavator (POCLAIN) with proper disposal of silt including all lead&lift &cost of all labour and T&P etc. required for proper completion of work. | 21,544.9 | cum | 43.1 ₹9,28,585.19 | 43 ₹9,26,430.7 Lowest |
| 3.00 | Dressing Of excavated earth/silt including cost of all labour and T&P etc. required for proper completion of work. | 21,544.9 | cum | 9 ₹1,93,904.1 Lowest | 9 ₹1,93,904.1 Lowest |
| 4.00 | Painting one Coat of red oxied primer and two coat of synthetic enamel paint on new steel surface with superior quality approved ,including cleaning the surface of all dust, dirt and other foreign matter, sand preparing and sand stopping and including cost of all material, labour and T&P etc required for proper completion of work. | 3.89 | sqm | 98 ₹381.22 Lowest | 98 ₹381.22 Lowest |
| 5.00 | Writing letter on sign board above 50 mm size but below 80 mm size including cost of all material, labour and T&P etc. required for proper completion of work. | 250 | No. | 4.2 ₹1,050 | 4 ₹1,000 Lowest |
Tender Value
₹11.7 L
EMD Value
₹23,340
Closing Date
27 Oct 2025, 11:00 amClosed
Executive Engineer
EXECUTIVE ENGINEER SITAPUR DIVISION SHARDA CANAL SITAPUR
Silt clearance of Ramkot Dy. from km 0.000 to km 20.230 (Lot-12)
2025_UPIDC_1082164_12
04/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
20 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹23,340
16/10/2025
30 Dec 2025
14 Oct 2025
27 Oct 2025
14 Oct 2025
27 Oct 2025
14 Oct 2025
16 Oct 2025
Amount
Cleaning of thick jungle and throney bushes without uprooting. Including cost of all labour and T&Petc. Required for proper completion of work.
Silt Clearance of canal by hydrulic excavator (POCLAIN) with proper disposal of silt including all lead&lift &cost of all labour and T&P etc. required for proper completion of work.
Dressing Of excavated earth/silt including cost of all labour and T&P etc. required for proper completion of work.
Painting one Coat of red oxied primer and two coat of synthetic enamel paint on new steel surface with superior quality approved ,including cleaning the surface of all dust, dirt and other foreign matter, sand preparing and sand stopping and including cost of all material, labour and T&P etc required for proper completion of work.
Writing letter on sign board above 50 mm size but below 80 mm size including cost of all material, labour and T&P etc. required for proper completion of work.
Ram Vilas (BID ID -5628667)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
Bid.pdf
Tender Documents • 2.39 MB
BOQ_1981630.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .