Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹13,765
Closing Date
30 Jul 2026, 10:00 am4d left
Execuitve Engineer
Execuitve Engineer Building Maintenance an Plantation Division
Estimate for Construction of new security check post and entry gates at workshop area Shahpurkandi Township
2026_WR_171874_1
40/2026
Open Tender
Civil Works - Buildings
Item Rate
90 days
Shahpurkandi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹13,765
30 Jul 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Flexible Pavements(By Mechanical
Means)-Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of MORT&H specifications | 14.18 | Cum | 1.25 | ₹17.73 |
| 2 | (6.6) Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed
within lead of 30 metres. | 4.1 | Cum | - | - |
| 3 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 51.86 | Cum | 100 | ₹5,186 |
| 4 | Cement concrete with stone ballast or shingle Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 9.47 | Cum | 53 | ₹501.91 |
| 5 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 5.15 | Cum | 10 | ₹51.5 |
| 6 | Damp proof course 7.5 Cm thick cement concrete 1:2:4 with 2 coats of bitumen 20/30 penetration at 1.65 Kg per sqm laid hot and sanded | 1.63 | Sq.Mtr | 11 | ₹17.93 |
| 7 | Cement concrete mixing by mechanical means using concrete mixer volumetric type | 9.38 | Cum | 1.25 | ₹11.73 |
| 8 | Mixing by mechanical means NO. using concrete mixer 10-10.12-a-ii volumetric type | 5.09 | Cum | - | - |
| 9 | Shuttering for faces of NO. 9-9.1 concrete foundations and foundation beam & plinth
beam (vertical or battering) | 25.25 | Sq.Mtr | 100 | ₹2,525 |
| 10 | Centering and shuttering for NO. 9-9.4 columns (Square or rectangular or poly gonal in
plain) | 28.8 | Sq.Mtr | 53 | ₹1,526.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
BOQ_349597.xls
BOQ • 0.37 MB
corrigendumcheckpost12.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].