Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance VILL BASTIYA P O P S EGRA DIST PURBA MEDINIPUR PIN 721429 | EGRA | PURBA MEDINIPUR | WEST BENGAL | 721429 | ₹5.1 L | L1 | Accepted-Finance OK |
| 2 | L2₹5.1 L+₹7,889.93 (1.56%)Accepted-Finance | ₹5.1 L+₹7,889.93 (1.56%) | L2 | Accepted-Finance OK |
| 3 | L3₹5.3 L+₹20,432.90 (4.04%)Rejected-Finance MATHABHANGA COOCH BEHAR | MATHABHANGA | COOCH BEHAR | WEST BENGAL | ₹5.3 L+₹20,432.90 (4.04%) | L3 | Rejected-Finance EMD TO BE REFUNDED |
Tender Value
₹5.1 L
EMD Value
₹10,114
Closing Date
7 Apr 2026, 11:00 amClosed
EXECUTIVE ENGINEER (CIVIL)
1ST ADMINISTRATIVE BUILDING, CITY CENTRE, DURGAPUR
CIVIL WORKS
2026_ADDA_1018935_1
ADDA/DGP/ED/N-93/2025-26(SL-5)
Open Tender
CIVIL WORKS
Percentage
60 days
CITY CENTRE, DURGAPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,114
17 Jul 2026
11 Mar 2026
9 Apr 2026
11 Mar 2026
7 Apr 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. In ground floor including roof. (a) upto 150 mm. thick | - | Cu. M. | 939 | - |
| 2 | Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-usible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility < -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse) | - | Sq. M. | 407 | - |
| 3 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking
out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement, (iii) 35 mm. thick | 25 | sqm. | 263 | ₹6,575 |
| 76 | G S T As applicable @ 18% on total work done value ( SL NO. - 1 to 75 ) | - | Nos. | - | - |
| 77 | Labour Welfare Cess @ 1% on total work done value including G S T ( SL NO. - 1 to 88) | - | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.29 MB
TenderBook.pdf
Tender Documents • 1.98 MB
BOQ_2503647.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .