OFFICE OF THE EXECUTIVE ENGINEER (SDW)-VIII
SEWAGE TREATMENT PLANT (WSTP), DWARKA SECTOR 16D.
Augmentation/up-gradation of existing STPs under Pkg- 5 of liquid stream
2022_DJB_228962_1
Press NIT NO. 16 (2022-2023) EE(SDW)VIII
Open Tender
Miscellaneous Works
4380 days
OFFICE OF THE EXECUTIVE ENGINEER (SDW)-VIII
as per NIT conditions
2 documents required · 2 mandatory
₹1,500
services.sabpaisasa.in
₹3.7 Cr
CE (SDW)
30 Dec 2022
7 Sept 2022
7 Nov 2022
7 Sept 2022
7 Nov 2022
7 Sept 2022
4 Oct 2022
Augumentation/Up-gradation of existing capacity of Sewage Treatment Plant at Vasant Kunj Ph I & II to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years. (Fixed @1.5 Crore per MGD)
Interim O& M Charge
O & M charges for theVasant Kunj Ph I & II STP and Associated Infrastructure.
Gaurantee Energy Consumption for STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Pappan Kalan STP(Note : - Bidder is required to quote the Gauranteed Energy Cosumption in kvah/MGD).The value shown is quantity is computed as :-(365*15 year X(Power Unit Rate)( 365*15*8.0)
Gaurantee Energy Consumption for STP associated Infrastructure(12*15*8)
Augumentation/Up-gradation of existing capacity of Sewage Treatment Plant at Ghitorni to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years. (Fixed @1.5 Crore per MGD)
Interim O& M Charges
O & M charges for the first month for STP and Associated Infrastructure.
Gaurantee Energy Consumption for STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Narela MGD STP(Note : - Bidder is required to quote the Gauranteed Energu Cosumption in kwh/MGD).The value shown is quantity is computed as :-(Flow (MGD) In the STP)X365*15X(Power Unit Rate)( 365*15*8.0)
Gaurantee Energy Consumption for STP associated Infrastructure
Augumentation/Up-gradation of existing capacity of Sewage Treatment Plant at Mehrauli to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years. (Fixed @1.5 Crore per MGD)
Interim O& M Charges
O & M charges for the first month for STP and Associated Infrastructure.
Gaurantee Energy Consumption for STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Narela MGD STP(Note : - Bidder is required to quote the Gauranteed Energu Cosumption in kwh/MGD).The value shown is quantity is computed as :-(Flow (MGD) In the STP)X365*15X(Power Unit Rate)( 365*15*8.0)
Gaurantee Energy Consumption for STP associated Infrastructure
Augumentation/Up-gradation of existing capacity of Sewage Treatment Plant at Okhla Phase-V to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years. (Fixed @1.5 Crore per MGD)
Interim O& M Charges
O & M charges for the first month for STP and Associated Infrastructure.
Gaurantee Energy Consumption for STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Narela MGD STP(Note : - Bidder is required to quote the Gauranteed Energu Cosumption in kwh/MGD).The value shown is quantity is computed as :-(Flow (MGD) In the STP)X365*15X(Power Unit Rate)( 365*15*8.0)
Gaurantee Energy Consumption for STP associated Infrastructure
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid