Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-AOC | ₹24.3 L | L1 | Accepted-AOC ok |
| 2 | L2₹25.1 LRejected-AOC | ₹25.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Arumugam S L1 | R Rajkumar L2 |
|---|---|---|---|---|---|
| 1.00Strengthening to the Road from Varagurcombai Road to pattu Valarpu Godown Road KM 0/0 - 0/660 H/O Unanthangal at Namagiripet Block of Namakkal District under Tribal Welfare Scheme 2025-2026 | |||||
| 2.00 | Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. | 1,188 | cum | 6.36 ₹7,555.68 | 7 ₹8,316 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 200 | sqm | 23.36 ₹4,672 | 25 ₹5,000 |
| 4.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 154.15 | cum | 2,796.5 ₹4.3 L | 2,900 ₹4.5 L |
| 5.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 198 | cum | 341.2 ₹67,557.60 | 355 ₹70,290 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 250.63 | cum | 2,870.4 ₹7.2 L | 2,950 ₹7.4 L |
| 7.00 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 2,005 | sqm | 87.54 ₹1.8 L | 95 ₹1.9 L |
| 8.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 2,005 | sqm | 20.6 ₹41,303 | 25 ₹50,125 |
| 9.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 50.22 | cum | 12,180 ₹6.1 L | 12,250 ₹6.2 L |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 3,70,579 ₹3.7 L | 3,82,643 ₹3.8 L |
Tender Value
Refer Docs
EMD Value
₹24,900
Closing Date
11 Feb 2026, 3:00 pmClosed
Block Development Officer (VP) Namagiripet Block
Block Development Officer (VP) Namagiripet Block
Strengthening to the Road from Varagurcombai Road to pattu Valarpu Godown Road KM 0/0 - 0/660 H/O Unanthangal at Namagiripet Block of Namakkal District under Tribal Welfare Scheme 2025-2026
2026_RDTN_650950_1
378/2026/T3
Open Tender
Civil Works
Block Development Officer (VP) Namagiripet Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,900
Yes
2 Mar 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
Strengthening to the Road from Varagurcombai Road to pattu Valarpu Godown Road KM 0/0 - 0/660 H/O Unanthangal at Namagiripet Block of Namakkal District under Tribal Welfare Scheme 2025-2026
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Pattugodown.pdf
Tender Documents • 0.76 MB
BOQ_780528.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid