| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-Finance | ₹12.7 L | L1 | Accepted-Finance Accept |
| 2 | L2₹13.0 LRejected-Finance | ₹13.0 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | HARI & CO L1 | srikamatchicontractors L2 |
|---|---|---|---|---|---|
| 1.00Construction of Vertical soakpit with drainage at Vadugampalayam Vadakkadu Perumal House to Pillaiyar kovil kadu at Minnakkal Panchayat | |||||
| 2.00 | Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation for Drain | 67.5 | Cum | 180 ₹12,150 | 320 ₹21,600 |
| 3.00 | Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation for Pipe line | 192.38 | Cum | 329.73 ₹63,433.46 | 329.73 ₹63,433.46 |
| 4.00 | Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete. | 13.5 | Cum | 5,416.43 ₹73,121.81 | 5,416.43 ₹73,121.81 |
| 5.00 | Supply and Erecting Centering for all R.C.C Works including cost and conveyance of materials and labour charges etc complete. | 248.37 | Cum | 547.5 ₹1.4 L | 620 ₹1.5 L |
| 6.00 | Cement concrete 1:3:6 Using 20mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete. | 30 | Cum | 6,168.67 ₹1.9 L | 6,168.67 ₹1.9 L |
| 7.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 0.08 | Cum | 91,880.58 ₹7,350.45 | 91,880.58 ₹7,350.45 |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all including cost and conveyance of all materials to site and all | 1.68 | Cum | 9,144.07 ₹15,362.03 | 9,144.07 ₹15,362.03 |
| 9.00 | Plastering with cement mortar 1:4 mix to 20 mm thick including including cost and conveyance of all materials to site and labour charges etc complete. | 45 | Cum | 587.89 ₹26,455.23 | 587.89 ₹26,455.23 |
| 10.00 | Supply of 300 mm RCC Non Presure Spun Pipe NP2 including cost and conveyance of materials and labour charges etc complete. | 285 | Cum | 955.8 ₹2.7 L | 955.8 ₹2.7 L |
Tender Value
₹12.8 L
EMD Value
₹12,850
Closing Date
21 Feb 2026, 9:00 amClosed
BDO VP
Block development Office Vennandur
Construction of Vertical soakpit with drainage at Vadugampalayam Vadakkadu Perumal House to Pillaiyar kovil kadu at Minnakkal Panchayat
2026_RDTN_658198_1
4303/2025/P3
Open Tender
Civil Works - Others
120 days
Vennandur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,850
Yes
19 May 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
Construction of Vertical soakpit with drainage at Vadugampalayam Vadakkadu Perumal House to Pillaiyar kovil kadu at Minnakkal Panchayat
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation for Drain
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation for Pipe line
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
Supply and Erecting Centering for all R.C.C Works including cost and conveyance of materials and labour charges etc complete.
Cement concrete 1:3:6 Using 20mm ISS H.G Metal including cost and conveyance of materials and labour charges etc complete.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all including cost and conveyance of all materials to site and all
Plastering with cement mortar 1:4 mix to 20 mm thick including including cost and conveyance of all materials to site and labour charges etc complete.
Supply of 300 mm RCC Non Presure Spun Pipe NP2 including cost and conveyance of materials and labour charges etc complete.
Towards labour charges for fixing of 300 mm RCC Non Presure Spun Pipe NP2 including cost and conveyance of materials and labour charges etc complete.
Refilling the excauted earth for pipe line trunch including cost and conveyance of materials and labour charges etc complete.
Provision for Chamber arrangements
Provision for Vertical Soakpit
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_789583.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
TechnicalBID.pdf
Tender Documents • 1.40 MB
BOQ_789583.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid