| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 CrAccepted-AOC YOGESHWARI NAGARI RING ROAD AMBAJOGAI | AMBAJOGAI | BEED | MAHARASHTRA | ₹36.2 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹36.7 CrRejected-AOC HARSH ANAND YEVALEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | ₹36.7 Cr | L2 | Rejected-AOC Accept |
| 3 | L3₹37.7 CrRejected-AOC THIRD FLOOR AMIT CRYSTAL SENAPATI BAPAT ROAD PUNE 411 016 | PUNE | PUNE | MAHARASHTRA | 411016 | ₹37.7 Cr | L3 | Rejected-AOC Accept |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
Tender Value
₹32.0 Cr
EMD Value
₹16.0 L
Closing Date
27 Sept 2021, 6:00 pmClosed
E.E. P.W. DIVN. NANDED
OFFICE OF THE E.E. P.W. DIVN. NANDED
Construction of Dr.Shankarrao Chavan Study Centre at Swami Ramanand Thirth Marathwada University premises, Nanded.
2021_PWR_719975_1
PWD/NED/40/2021-22
Open Tender
Civil Works
730 days
NANDED
AS PER TENDER DOCUMENT
4 documents required · 4 mandatory
₹3,000
₹16.0 L
OFFICE OF THE C.E. P.W. REGION, AURANGABAD
21 Feb 2022
13 Sept 2021
28 Sept 2021
13 Sept 2021
27 Sept 2021
13 Sept 2021
22 Sept 2021
Amount
Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts & lead and spreading for embankment or stacking as directed. Ground Floor
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all leads & lifts beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Ground Floor
Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material with all leads & lifts beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means Ground Floor
Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. Ground Floor
Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc.complete. Ground Floor
Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. Ground Floor -
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. Ground Floor -
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per square metre of vertical surface area covering 10 years guarantee on bond paper. Ground Floor -
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. Ground Floor -
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-I) to the soil along the external face of building by punching holes of 1.2 of 1.5 C.M. diametre about 30 -60 cm deep at 15 cm c/c as close to the wall as possible and to inject 0.5 percent of aldrin or clorophyrifos at the rate of 7.5 litres per hole and sealing the same with proper filling and covering 10 years guarantee on bond paper. Ground Floor -
Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor -
Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor -
Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for plain or molded sills, cornice, jambs, block in course, or architraves of required size and shapes including steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided,finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor -
Providing and laying Cast in situ/Ready Mix cement concrete in M15- First Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M15 Second Floor
Providing and laying Cast in situ/Ready Mix cement concrete M-15 of trap/ granite/quartzite/gneiss metal for coping to plinth or parapet, moulded or chamfered as per drawing or as directed including steel centering, plywood/ steel formwork compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.) With fine aggregate (Crushed sand VSI Grade) First Floor -
Providing and laying Cast in situ/Ready Mix cement concrete M-15 for coping to plinth Third Floor - 100 Students Boys & Girls Hostel
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite /quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. including bailing out water, Steel centering, formwork ,cover blocks, laying/pumping, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor -
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor -
Providing and laying Cast in situ/Ready Mix cement concrete M-25 for Coln First Floor -
Providing and laying Cast in situ/Ready Mix cement concrete M-25 for Coln Second Floor -
Providing and laying Cast in situ/Ready Mix cement concrete M-25 for Coln Third Floor -
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 for beam and lintel First Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 for beam and lintel Second Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 for beam and lintel Third Floor
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor
Providing and laying Cast in situ/Ready Mix cement concrete M-25 for slab and landing First Floor
Providing and laying Cast in situ/Ready Mix cement concrete M-25 for slab and landing Second Floor
Providing and laying Cast in situ/Ready Mix cement concrete M-25 for slab and landing Third Floor
Providing and laying Cast in situ/Ready Mixcement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. chajja as per detailed design and drawings including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor
Providing and laying Cast in situ/Ready Mixcement concrete M-25 for chajja First Floor
Providing and laying Cast in situ/Ready Mixcement concrete M-25 for chajja Second Floor
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite / quartzite / gneiss metal for R.C.C. canopy as per detailed designs and drawings including steel centering, formwork, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing etc. complete (excluding reinforcement). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor
Providing and laying Cast in situ/Ready Mixcement concrete M-25 for Pardi First Floor
Providing and laying Cast in situ/Ready Mixcement concrete M-25 for Pardi Second Floor
Providing and laying Cast in situ/Ready Mixcement concrete M-25 for Pardi Third Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap / quartzite /granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 for waist slab and steps First Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 for waist slab and steps Second Floor
Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. Ground Floor
Providing and fixing in position TMT - FE - 500 bar reinforcement First Floor
Providing and fixing in position TMT - FE - 500 bar reinforcement Second Floor
Providing and fixing in position TMT - FE - 500 bar reinforcement Third Floor
Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. Second Floor
Providing and fabricating structural steel work in rolled sections Third Floor
Providing expansion joints in R.C.C. framed structure (interior column) with plain premoulded filler 25 mm thick including fixing T.W. battens on both faces and finishing as directed etc. Complete. Ground Floor
Providing expansion joints in R.C.C. framed structure (interior column) First Floor
Providing expansion joints in R.C.C. framed structure (exterior Columns) with plain premoulded filler 25 mm thick and 3 mm thick alluminium plate, hold fast, fixing T.W. battens on internal face, finishing etc. complete as directed. Ground Floor
Providing expansion joints in R.C.C. framed structure (exterior Columns) First Floor
Providing expansion joints in R.C.C. framed structure (at floor level) with premoulded filler 25 mm thick and 3 mm thick aluminium plate as required, bitumen poured filler and fixing T.W. battens on rear faces etc. complete as directed. Ground Floor
Providing expansion joints in R.C.C. framed structure (at floor level) First Floor
Providing expansion joints in R.C.C. framed structure (at terrace level) with premoulded filler 25 mm thick and 3 mm thick aluminium plate as required, bituminous poured filler, fixing lead, flashing on upper side and T.W. battens on inner face finishing etc. Complete as directed. Second Floor
Providing fly ash brick masonry with conventional / I.S. type fly ash bricks in C.M. 1:6 in foundation and plinth including bailing out water manually striking joints, racking out joints watering and scaffolding etc. complete. Ground Floor
Providing Autoclaved Aerated Concrete Block masonary of Ecolite or equivalent make conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) Ground Floor
Providing Autoclaved Aerated Concrete Block masonary First Floor
Providing Autoclaved Aerated Concrete Block masonary Second Floor
Providing Autoclaved Aerated Concrete Block masonary Third Floor
Providing Autoclaved Aerated Concrete Block masonary of Ecolite or equivalent make conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in Half brick thick wall including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) Ground Floor
Providing Autoclaved Aerated Concrete Block masonary in half brick First Floor
Providing Autoclaved Aerated Concrete Block masonary in half brick Second Floor
Providing Second class fly ash brick masonry with conventional / I.S. type bricks in cement mortar 1:4 in half brick thick wall including mild steel longitudinal reinforcement of two bars of 6 mm diameter / two hoop iron strips 25 mm x 1.60 mm at every third course, properly bent and bounded at ends scaffolding raking out joints and watering etc. complete. Ground Floor
Providing Second class fly ash brick masonry in half brick First Floor
Providing Second class fly ash brick masonry in half brick Second Floor
Providing Brick Masonry with first Class Wire cut bricks of good quality of size 218 x 101 x 76 mm for superstructure in cement mortor 1:4 bricks of uniform size laid flush in mortor in a bond as per pattern illustrated on drawings and as directed by the Engineer - in - charge with joints not more than 9mm, including scafolding,racking out joints, watering, cleaning, curing. including all texes, lead, lift, labour etc. complete. Spec. As directed by Engineer in charge. Ground Floor -
Providing Brick Masonry with first Class Wire cut bricks First Floor
Providing Brick Masonry with first Class Wire cut bricks Second Floor
Providing & laying water proof treatment of terrace slab with B.B. Coba in all position with an average thickness of 150mm consisting specialised materials as per the manufactures specifications and covering 10 years guarantee on court fee stamp paper including all lead, lift, etc. complete. First Floor -
Providing & laying water proof treatment of terrace slab with B.B. Coba Third Floor -
Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. First Floor -
Providing water proof bedding for flooring of Bath and WC Second Floor
Providing and applying two coats of High Albedo paint having minimum Solar Reflective Index (SRI) 108 (with solar reflectance & thermal emittance tested as per ASTM) C 1549 and ASTM C 1371 respectively, VOC less than 10 cc/gm. The coating thickness and the methodology of application shall strctly as per manufacturer's specifitions and as approved by engineer in charge. Surface preparation includes cleaning with metal wire brush to remove all dust, fungus etc, washing with water all complete.The contractor shall give guarantee for the performance of SRI and also the durabitity of coating, all complete as per direction of Engineer - in- incharge. First Floor
Providing and applying two coats of High Albedo paint Third Floor
Providing internal cement plaster 20mm thick in Single coats in cement mortar 1:5 without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc. complete Ground Floor
Providing internal cement plaster 20mm thick First Floor
Providing internal cement plaster 20mm thick Second Floor
Providing internal cement plaster 20mm thick Third Floor
Providing and applying plaster / wall punning with plaster of paris ( with plaster of paris material of Ambuja / Mor Chap or equivalent make ) in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. Ground Floor
Providing and applying plaster / wall punning with plaster of paris First Floor
Providing and applying plaster / wall punning with plaster of paris Second Floor
Providing and applying plaster / wall punning with plaster of paris Third Floor
Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. Ground Floor
Providing sand faced plaster externally First Floor
Providing sand faced plaster externally Second Floor
Providing fine cement finish 1.5 mm thick over green plaster surface including scaffolding curing etc. complete. Ground Floor
Providing fine cement finish 1.5 mm thick over green plaster Second Floor
Providing fine cement finish 1.5 mm thick over green plaster Third Floor
Providing patti/ band 75mm wide on plastered surface 12 mm to 15 mm thick in C.M. 1:3 line and level including neat finishing scaffolding curing etc. complete. Ground Floor
Providing patti/ band 75mm wide on plastered surface First Floor
Providing patti/ band 75mm wide on plastered surface Second Floor
Providing patti/ band 100mm wide on plastered surface 12 mm to 15 mm thick in C.M. 1:3 line and level including neat finishing scaffolding curing etc. complete. Ground Floor
Providing patti/ band 100mm wide on plastered surface First Floor
Providing patti/ band 100mm wide on plastered surface Second Floor
Providing patti/ band 150mm wide on plastered surface 12 mm to 15 mm thick in C.M. 1:3 line and level including neat finishing scaffolding curing etc. complete. Ground Floor
Providing patti/ band 150mm wide on plastered surface First Floor
Providing patti/ band 150mm wide on plastered surface Second Floor
Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. Ground Floor
Providing and fixing chicken mesh of 22 gauge First Floor
Providing and fixing chicken mesh of 22 gauge Second Floor
Providing and applying plaster with plaster of paris in 6mm thickness to previously plaster surface in all position including preparing the surface scaffolding etc. complete. Ground Floor
Providing and applying plaster with plaster of paris First Floor
Providing and applying plaster with plaster of paris Second Floor
Providing and applying plaster with plaster of paris Third Floor
Providing and fixing false ceiling with eco-friendly light-weight calcium silicate tiles of spintone surface texture aerolite make or equivalent of size 595mm x 595mm having 15mm thick densified micro look edge and 100% humidity resistance incombustible as per BS 46part IV and thermal conductivity 0.043 w/m 0 KC and NRC 0.50 placed in true horizontal level suspended grid of size 600x600mm made from hot dipped G.I. steel sections ion silhouette profile, rotary stitched double webbed white with 6mm reveal profile (white/black), wherein, main T runner of size 42mmx14mm between main tee 600mm center-tocenter and secondary cross T of size 33x14x0.43mm thick of length 600mm long spaced inter-locked at middle of the first crossed T in each panel to form grid of 1200mmx600mm resting on periphery wall Profile wall section 19mm (7+7) x 19mmx0.40thicknesses and laying false ceiling for services like diffusers grills including cutting, making opening for light fittings, fixtures, , smoke detectors etc., wherever required. Main T runners suspended from ceiling with using G.I. soffit cleats of size 25x35x1.6 mm of required length fixed to the ceiling with 6mm dia and 50mm long dash fastener, 4mm dia G.I. adjustable rods with powder- Ground Floor
Providing and fixing false ceiling First Floor
Providing and fixing false ceiling Second Floor
Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. Ground Floor
Providing groove to required size First Floor
Providing groove to required size Second Floor
Providing and laying Vitrified MATT finish having decorative type of size 1000 millimeter x 1000 millimeter of 8 to 10 millimeter thickness (on a existing flooring) with bonding chemical and confirming to IS 15622-2006 (Group Bla) of approved make shade and pattern for flooring in required position laid on a bed of bonding chemical filling joints curing and cleaning etc .complete. Ground Floor
Providing and laying Vitrified MATT finish First Floor
Providing and laying Vitrified MATT finish Second Floor
Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete. Ground Floor
Providing and laying vitrified matt fininsh tiles First Floor
Providing and laying vitrified matt fininsh tiles Second Floor
Providing and laying vitrified stone effect finish tiles having size 590 to 605 mm x 590 to 605 mm of 8 to 10 mm thickness and confirming to IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including required position laid on a bed of 1:4 cement mortarincluding neat cement float, filling joints, curign and cleaning etc. complete. Ground Floor
Providing and laying vitrified stone effect finish tiles for dado First Floor
Providing and laying vitrified stone effect finish tiles for dado Second Floor
Providing and laying vitrified stone effect finish tiles for dado Third Floor
Providing and fixing heavy duty inter locking concrete Coloured paving blocks of 80 mm thickness of having a strength of 300 Kilogram/Sq.cm. of approved quality and shape on a bed of crushed sand of 25 to 30 mm thick including skirting joints and cleaning etc. complete Ground Floor
Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. Ground Floor
Providing Mirror polishing to Kota Stone including using all necessary stones and equipments cleaning, washing etc. complete. For Flooring Ground Floor
Providing and laying machine cut machine polished machine cut Kota stone slabs 20 to 25 mm thick for treads and risers of steps and staircases, with rounded nosing for the treads on a bed of 1:4 cement mortar including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. Ground Floor
Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. Ground Floor
Providing and laying in position flooring of telephone black First Floor
Providing and laying in position flooring of telephone black Second Floor
Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete. Ground Floor
Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black for treads and risers First Floor
Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black for treads and risers Second Floor
Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete. Ground Floor
Providing leather finished polishing to Granite Stone slab First Floor
Providing leather finished polishing to Granite Stone slab Second Floor
Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete. Ground Floor
Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing First Floor -
Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing Second Floor
Providing and applying priming coat on concrete/ masonary/ Asbestos Cement plastered surfaces including scaffolding if necessary, preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter and sand papering as required etc. complete. Ground Floor
Providing and applying priming coat First Floor
Providing and applying priming coat Second Floor
Providing and applying washable oil-bound distemper of approved colour and shade to old and new surfaces in two coats including scaffolding, preparing the surfaces. (excluding the primer coat.) etc. complete. Ground Floor
Providing and applying washable oil-bound distemper First Floor
Providing and applying washable oil-bound distemper Second Floor
Providing and applying 2 coats of 100% Pure acrylic low VOC and APEO & HCHO free water based paint of approved colour that belongs to class 1 flame spread resistance of approved make Paint should provide durable and long lasting silk finish with a high crack tolerance of upto 1mm. Paint should have an oustanding washability with high resistance to wide range of bacteria and fungus. Paint has to be applied on smooth and uniform surface prepared by an acrylic copolymer low VOC & Odour putty. This surface should be primed with water based low VOC Primer. The work activity should cover all aspects of applying paints from surface preparation as directed by Engineer in charge. Ground Floor
Providing and applying 2 coats of 100% Pure acrylic low VOC and APEO & HCHO free water based paint First Floor
Providing and applying 2 coats of 100% Pure acrylic low VOC and APEO & HCHO free water based paint Second Floor
Providing and applying 2 coats of 100% Pure acrylic low VOC and APEO & HCHO free water based paint Third Floor
Providing and applying 2 Coats of 100% Pure acrylic water based paint with special heat reflectance property to withstand the harsh climate for period of atleast 10 years of approved make. Paint system should provide durable and long lasting finish with DFT of min 90 microns and should protect against concrete carbonation with R value of minimum 600 and equivalent concrete layer thickness value of min 150 cm. Paint should have breathability property and should be able to cover hairline cracks in the surface upto 0.5mm The paint has to be applied on a coat of high quality acrylic copolymer based alkali resistant primer with excellent penetrating properties including cleaning, with all leads and lifts at all levels etc complete, as directed by Engineer in charge. Ground Floor
Providing and applying 2 Coats of 100% Pure acrylic water based paint First Floor
Providing and applying Dezzly texture paint of Hammer / Screetech on the external plastered surface of approved quality. As directed by Engineer in charge ( Approved by SE PWD Nanded ) Ground Floor
Providing and applying Dezzly texture paint First Floor
Providing and applying Dezzly texture paint Second Floor
Providing and applying Dezzly texture paint Third Floor
Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC‘s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. Ground Floor
Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint First Floor
Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint Second Floor
Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete Ground Floor
Providing and fixing frame with / without ventilator First Floor
Providing and fixing frame with / without ventilator Second Floor
Providing and fixing Country cut teak wood double or single leaf panelled shutters, 35 mm thick style top and freze rail 95 x 35 thick with lock and bottam rail 195 x 25 mm thick and panels without ventilator as per detailed drawing excluding the door frame, stainless steel fixtures and fastening and finishing the wood work with oil painting 3 coats complete Ground Floor
Providing and fixing Country cut teak wood double or single leaf panelled shutters First Floor
Providing and fixing Country cut teak wood double or single leaf panelled shutters Second Floor
Providing and fixing in position, Double shuttered aluminium extruded powder coated openable door of specified size with aluminium door frame of powder coated section 101.60 x 44.75mm , 3.18 mm thick and shutter comprising of powder coated section having bottom and lock rail of size 150 mm x 44.5 mm x 3.00 mm thick top rails 47.62 x 44.45 mm x 3.00 mm thick , vertical style 47.62 x 44.45 mm, 3.00 mm thick and for shutter plain glass panes 5 mm thick for top panels and 12mm thick both side laminated phenol bonded particle board panels for bottom panels etc. , I.S.I. mark , heavy duty, Hydraulic floor spring of 150Kilogramcapacity , having heavy duty concealed lock, necessary beading, glazing clips, PVC gaskets, 250mm length aluminium tower bolts, 150mm dia. pad handle, etc. as per detailed design and drawing or as directed by engineer in charge including all materials , labours, and equipment etc.complete Ground Floor
Providing & Fixing 6mm thick Toughened glass Panneling with ST Series green Reflective cool glass on a frame of alluminium section of size 70mm X 53mm for green building concept & additional frame work for fireing alluminium frame etc.Complete. Spec.No. Rate sanctioned by SE PWD Nanded Vide Ltr. No. 2020-21/tender/298 Date.15-01-2021. Ground Floor
Providing & Fixing 6mm thick Toughened glass Panneling First Floor
Providing & Fixing 6mm thick Toughened glass Panneling Second Floor - 100 Students Boys & Girls Hostel
Providing and fixing 34 mm thick moulded door shutter consisting of solid core single leaf flush door of 30 mm thickness lipped with 15 mm ( 5mm x 3) thick x 30 mm width on one style and top rail and 10 mm (5mm x 2) thick x 30 mm width on other style and bottom rails. The inner panels laminated with 2 mm thick termite proof, water proof and fire resistant moulded PVC sheet with 2,4,6 design in different plain and /or prelim colours on one side after routing the moulded design on flush doors and 2 mm plain and /or pre lam PVC on other side using rubber adhesive on flush door and solvent cement adhesive on the PVC lipping etc. as per direction of Engineer in charge and manufacturers specification and drawing etc.complete. Ground Floor
Providing and fixing 34 mm thick moulded door shutter First Floor -
Providing and fixing 34 mm thick moulded door shutter Second Floor
Providing and fixing 34 mm thick moulded door shutter Third Floor
Providing and fixing in position powder coated aluminium louvered windows / ventilator of various sizes with powder coating as per detailed drawing and specifications including aluminium frames 80 x 38 mm x 1.22 mm box type, 5 mm thick sheet glass louvers, of approved quality etc. complete. Ground Floor
Providing and fixing in position powder coated aluminium louvered windows / ventilator First Floor
Providing and fixing in position powder coated aluminium louvered windows / ventilator Second Floor
Providing and Fixing 30 MM thick BOTH SIDE PRELAMINATED SOLID PANEL PVC DOOR SHUTTER consisting of frame made out of M.S tubes of 19 guage thickness and, size 19 x 19 mm for styles and 15 x15 mm for the top and bottom rails, M.S frame shall have a coat of metel primer of approved make and manufacture. M.S frame shall be covered with heat mouled PVC 'C' channel made from 5 mm (+/0.25) thick prelaminated sheet of density 600 Kilogram/cbm ,of size 30mm thickness 70mm width out of which 50mm shall be flat and 20mm shall be tapered in 45? angle on either side forming stiles ; and 5 mm thick ,95 mm wide PVC sheet out of which 75 mm shall be falt and 20 mm shall be tapered in 45 on the inner side to form top and bottom rail and 115 mm wide PVC sheet out of which 75 mm shall be falt and 20 mm shall be tapered on both sides to form lock rail.Top,bottom and lock rail shall be provided either side of the panel. An additional 5 mm (+/0.25) thick PVC strip of 20 mm width is to be stuck on the bottom side of the ' c ' channel prelaminated paneling of 5 mm (+/0.25) thick PVC sheet to be fitted inside the M.S. frame welded/ sealed to the styles and rails with 5 mm (+/0.25) x 30 mm PVC sheet beading on either side and joined together with solvent cement adhesive etc ,10 mm thickness (5 mm (+/0.25) x 2 nos ) 20 mm wide cross Ground Floor
Providing and Fixing 30 MM thick BOTH SIDE PRELAMINATED SOLID PANEL PVC DOOR SHUTTER First Floor
Providing and Fixing 30 MM thick BOTH SIDE PRELAMINATED SOLID PANEL PVC DOOR SHUTTER Second Floor
Providing and fixing in position. (as per I.S.1868 / 1982) Aluminium sliding window of two tracks with rectangular pipe having overall dimension 63.50 x 38.10 x 1.02 mm at weight 0.547 Kilogram/Running metre. and window frame bottom track section 61.85 x 31.75 x 1.20 mm at weight 0.695 Kilogram/Running metre. Top and side track section 61.85 x 31.75 x 1.30 mm at weight 0.659 Kilogram/Running metre. The shutter should be of bearing bottom 40 x 18 x 1.25 mm at weight 0.417 Kilogram / Running metre. Inter locking section 40 x 18 x1.10 mm at weight 0.469 Kilogram/Running metre. And handle section 40 x 18 x 1.25 mm at weight 0.417 Kilogram / Running metre. and top section 40 x 18 x 1.25 mm at weight 0.417 Kilogram/Running metre. As per detailed drawings and as directed by Engineer in charge with all necessary Aluminium sections fixtures and fastenings such as roller bearing in nylon casting and self locking catch fitted in vertical section of shutter including 5 mm thick plain glass with all required screws and nuts etc, complete. With powder coating with box Ground Floor
Providing and fixing in position. (as per I.S.1868 / 1982) Aluminium sliding window of two tracks First Floor
Providing and fixing in position (as per 1868 / 1982) Aluminium sliding window of three tracks with rectangular pipe 95 x 38.10 x 0.90 mm at weight 0.637 Kilogram/Running metre. with window frame bottom track section 92 x 31.75 x 1.30 mm at weight 1.070 Kilogram/Running metre.. Top and side track section 92 x 31.75 x 1.30 mm at weight 0.933 Kilogram/Running metre. The shutter should be of bearing bottom 40 x 18 x 1.25 mm at weight 0.417 Kilogram/Running metre. Inter locking section 40 x 18 x 1.10 mm at weight 0.469 Kilogram/Running metre. and handle and top section 40 x 18 x 1.25 mm at weight o.417 Kilogram/Running metre. As per detailed drawings and as directed by Engineerincharge with all necessary Aluminium sections fixtures and fastenings such as roller bearing in nylon casting and self locking catch fitted in vertical section of shutter including 5 mm thick plain glass and aluminium mosquito net shutter with stainless steel jail with all required screws and nuts etc, complete. With powder coating with box Ground Floor
Providing and fixing in position (as per 1868 / 1982) Aluminium sliding window of three tracks First Floor
Providing and fixing in position (as per 1868 / 1982) Aluminium sliding window of three tracks Second Floor
a) Supplying and fixing in position Aluminium four track sliding windows with outer frame made from section of over all size 122 mm x 45 mm, bottom section with drain section track weighing 1.83Kilogramper metre and top and side section of size 122x 31.75 mm weighing 1.15Kilogramper running metre with shutter sections made of 18 mm x 40 mm size having average weight of 0.6Kilogramper running metre (or as required size) with change in proportionate weight, with 6 mm float glass in three equal panels and alluminium coated stainless steel mosquito net in one (2/3 of opening) panel fixed with new neoprene gasket, shutters to be provided with nylon encased stainless steel rollers, necessary locks and handles complete. Ground Floor
a) Supplying and fixing in position Aluminium four track sliding windows First Floor
Providing and fixing M40 grade thick vibrated pull cast or similar type concrete frame with chamfer conforming to I.S. 65241983 having 6 mm dia. bars 3 Nos. And stirrups @250 mm c/c and fixing in wall with 6 Nos of hold fast of 12 mm dia bars 500 mm long including primer and oil painting etc, complete) frame size 60 mm x 100 mm . Second Floor
Providing and fixing M40 grade thick vibrated pull cast or similar type concrete frame Third Floor
Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/Square Metre as per drawing including fixtures, necessary welding and painting with one coats of anticorrosive paint and two coats of oil painting complete. Ground Floor
Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/Square Metre First Floor
Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/Square Metre Second Floor
Providing and Fixing mat finish stainless steel (of 302 grade ) railing with top pipe of 50 mm dia. and vertical pipe of 38 mm dia at 0.60 m c/c or as required and horizontal pipes of 25 mm dia in three rows, all pipes of 2 mm thick including buffing,fabricating fixtures and fastening including pipe base of appropriate diameter and ball base of 75 mm dia above newel post of 75 mm diameter etc. complete (Prior approval of sample and brand by Ex.Engineer is necessary before use) Ground Floor
Providing and Fixing mat finish stainless steel (of 302 grade ) railing First Floor
Providing and Fixing mat finish stainless steel (of 302 grade ) railing Second Floor
Grab bars-Providing SS grab bars set for accessible toilets comprising of 4 nos. Grab bars as specified below.(1 nos. wing grab bar + 1 nos. L shaped grab bar + 2 nos. straight grab bars = 1 typical set) 27a) Swing grab bar (1 NOS) Providing a S.S. 304 SWING HANDICAP GRAB BAR - 700 mm and of DIA: 32MM and thickness 1.5mm of the roved brand and make. 27b) L Shaped grab bar (1 NOS) Providing S.S. 304 L SHAPED DISABLED GRAB BAR of IZE-600MM (H) X 600MM (D) and 32MM DIA. and thickness mm of the approved brand and make. 27c) Straight grab bar (2 NOS) Providing S.STEEL 304 GRAB RAIL (600 MM),32MM DIA. and thickness 1.5mm of the approved brand and make. Ground Floor
Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. Ground Floor
Providing and fixing C.P. 2 Way BIB cock First Floor
Providing and fixing C.P. 2 Way BIB cock Second Floor
Providing and fixing 25mm diameter water meter with non-return valve including strainer, sockets/ union nut and including water meter box making locking arrangement and lock. [Without chamber]. Ground Floor
Providing and fixing 15 mm dia. screw down bib/ stop tap of brass including necessary socket union nut complete. Ground Floor
Providing and fixing 15 mm dia. screw down bib/ stop tap First Floor
Providing and fixing 15 mm dia. screw down bib/ stop tap Second Floor
Providing and fixing 20 mm dia. screw down bib/ stop tap of brass including necessary socket union nut complete. Ground Floor
Providing and fixing 20 mm dia. screw down bib/ stop tap First Floor
Providing and fixing 20 mm dia. screw down bib/ stop tap Second Floor
Providing and fixing screw down 15 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete Ground Floor
Providing and fixing screw down 15 mm dia. wheeled stop tap First Floor
Providing and fixing screw down 15 mm dia. wheeled stop tap Second Floor
Providing and fixing push cock (Self closing tap) symet type of 15 mm dia. including necessary socket, testing etc. complete. Ground Floor
Providing and fixing push cock (Self closing tap) First Floor
Providing and fixing push cock (Self closing tap) Second Floor
Providing and fixing White glazed with bottle trap earthenware Wash Hand Basin of 63x45 cm size including cold water piller taps, brackets, rubber plugs and brass chain, stop tap, chromium plate bottle trap and necessary pipe connections including UPAC waste pipe and trap upto the outside face of the wall, making good the damaged surface, testing etc. complete. Ground Floor
Providing and fixing White glazed with bottle trap earthenware Wash Hand Basin First Floor
Providing and fixing White glazed with bottle trap earthenware Wash Hand Basin Second Floor
Providing and fixing Oval Type Under Counter Wash Hand Basin of 420 x 590 x 195mm size with pillar cock, C.P.Angular stop cock, long thread of approved make continental including SS bottle trap of necessary pipe connection up to the outside face of the wall, having Telephonic Black / Colour Granite of 180 mm thick fixed on Black Kadappa Framework, etc. Complete as directed by Engineer in charge. Ground Floor
Providing and fixing Oval Type Under Counter Wash Hand Basin First Floor
Providing and fixing Oval Type Under Counter Wash Hand Basin Second Floor
Providing and fixing 15cm x 10cm salt glazed stoneware gully trap in cement concrete 1:4:8 outside the building including cast iron grating in the sink, connecting glazed stoneware pipe, brick masonry chamber with cast iron lid and cast iron grating for the gully trap. Ground Floor
Providing and fixing 15cm x 10cm salt glazed stoneware gully trap First Floor -
Providing and fixing 15cm x 10cm salt glazed stoneware gully trap Second Floor
Providing and laying concrete pipes of I.S.NP. class of 150mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete. Ground Floor
Providing and laying concrete pipes of I.S.NP. class of 300mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete. Ground Floor
Providing , constructing and fixing 250 mm dia. Inspection chamber made up of UPVC material of thickness 3.5 mm and height of 259 mm with inlet and outlet of 110 mm dia. with 75 mm dia. U Trap, Ultra shaft pipe of Upvc material having height of 470 mm and fixing Ultra 250 mm dia. UPVC cover and frame in 150 mm thick in c.c.1:2:4, having crushed sand bed of 100 mm thick of size 550 mm dia. Including excavation and refilling the sides of chamber by crushed sand cushioning 150 mm thickness, connecting all required UPVC fittings with rubber lubricant etc. complete. Ground Floor
Providing , constructing and fixing 450 mm dia. Inspection chamber made up of Polypropylene / polyethylene material of thickness 3.5 mm and height of 388 mm with 160 or 200 mm main inlet (s) outlet and 110 and / or 160 mm branch inlets, with 450 mm dia. Ultra shaft pipe of HDPE material having height of 460 mm, having R.C.C. cover and frame fixing in 150 mm thick in c.c.1:2:4, having crushed sand bed of 150 mm thick of size 750 mm dia. Including excavation and refilling the sides of chamber by sand crushed cushioning 150 mm thickness, connecting all required UPVC fittings with rubber lubricant etc. complete. Ground Floor
Providing , constructing and fixing 600 mm dia. Inspection chamber made up of Polypropylene / polyethylene material Having 315 mm diameter inlet(s)/outlets and with eccentric reducers as per requirement to connect 160 mm and 200 mm pipes having thickness of 5 mm and 600 mm in height, with inbuilt shaft achieve the invert depth as per site condition of wall thickness of 5 mm having R.C.C. cover and frame fixing in 150 mm thick in c.c.1:2:4, having crushed sand bed of 150 mm thick of size 750 mm dia. Including excavation and refilling the sides of chamber by ?sand crushed cushioning 150 mm thickness, connecting all required UPVC fittings with rubber lubricant etc.complete. Ground Floor
Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. Ground Floor
Providing and fixing 450mm x 550mm size superior type Belgium mirror First Floor
Providing and fixing 450mm x 550mm size superior type Belgium mirror Second Floor
Providing and fixing chromium plated towel rod 16 mm dia and 75 cm. in length including all accessories complete. Ground Floor
Providing and fixing chromium plated towel rod First Floor
Providing and fixing chromium plated towel rod Second Floor
Providing and fixing stainless steel sink of size 600 x 510 x 200 mm incluidng coupling, outlet pipe, elbow and other necessary fitting, finishing etc. complete. Ground Floor
Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. Ground Floor
Providing and fixing C.P. Angular stop clock First Floor
Providing and fixing C.P. Angular stop clock Second Floor
Providing and fixing C.P. BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete. Ground Floor
Providing and fixing C.P. BIB cock with wall flange First Floor
Providing and fixing C.P. BIB cock with wall flange Second Floor
Providing and fixing C.P. sink cock with raised J" shaped swinging casted spout ofapproved make including necessary sockets/ union nut etc. complete." Ground Floor
Providing and fixing 40 mm. dia Ball cock medium type with PVC float including sockets and necessary fittings and tested as per municipal requirements etc. complete. Ground Floor
Providing and fixing 40 mm. dia Ball cock Second Floor
Providing and fixing 15 mm. dia Ball cock medium type with PVC float including sockets and necessary fittings and tested as per municipal requirement etc. complete. First Floor
Providing and fixing 15 mm. dia Ball cock Second Floor
Providing and fixing Shower Head, with shower arm of approved make mixer of including all necessary pipe fittings and connections etc. complete as directed by Engineer in charge. Ground Floor
Providing and fixing Shower Head, with shower arm First Floor
Providing and fixing Shower Head, with shower arm Second Floor
Providing and fixing C.P. wall mixer with provision for overhead shower with 115mm long bend pipe and wall flange of approved make including necessary sockets/union nut etc. complete. Ground Floor
Providing and fixing C.P. wall mixer with provision for overhead shower First Floor
Providing and fixing C.P. wall mixer with provision for overhead shower Second Floor
Providing and Fixing half turn 25 mm dia gun metal flushing cock including all accessories etc. complete. Ground Floor
Providing and Fixing half turn 25 mm dia gun metal flushing cock First Floor
Providing and Fixing half turn 25 mm dia gun metal flushing cock Second Floor
Providing and fixing Orissa Pan of size 580x445x260 mm with approved make flush valve including trap, C.I. soil and vent pipe upto outside face of wall including 100mm dia. C.I. plug, bend and necessary pipe connection, etc complete. As directed by Engineer in charge. Ground Floor
Providing and fixing Orissa Pan First Floor
Providing and fixing Orissa Pan Second Floor
Providing and fixing white Opal series European type wall-hung, of size 400mmx370mmx575mm with approved make flush valve including soil pipe, vent pipe upto outside face of wall, 100mm dia C.I. plug bend inlet pipe all fittings, cutting & making good walls, floors etc as directed by Engineer in charge. Ground Floor
Providing and fixing white Opal series European type wall-hung, First Floor
Providing and fixing white Opal series European type wall-hung, Second Floor
Providing and fixing white glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete. Ground Floor
Providing and fixing white glazed urinal First Floor
Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete Ground Floor
Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe First Floor
Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe Second Floor
Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. Ground Floor
Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe First Floor
Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe Second Floor
Providing and laying permanent piping technology anti-termite treatment peripheral work by installing LLDP (Low linear density polyethylene) tube of 8 mm O.D. & 6 mm I.D. with inbuilt pressure compensation chip at every 30 cm interval in the tube. The LLDP pipe shall be installed at the entire periphery of the building and at internal network of building at a depth of 20 to 200 mm under floor at every 2 to 3 mtr. distance (adjusted as per building layout) & shall provide a junction to every 200-250 Sqm of building & test every junction during injecting chemicals for termite control treatment. The Imidacloprid 30.5% SC or equivalent make mix as per 6313, (part III) shall be injected by the pressure pump diluted with water 10.5m1/5 Itr of water at 2 kg/sq.cm. 2Ltr/SMT at ground floor level and @1.25Ltr/SMT at other levels.A guarantee bond of 03 years shall be furnished by the contractor inclusive of all material, hire charges, machinery, junction box and labour for making hole, chipping, and clean the surface etc Ground Floor
Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. c) 10 Kg/Sq. cm : ix) 200 mm MJP SSR SECTION - I (IX) H.D.P.E. PIPES It.no.1 P.no. 114 Ground Floor
Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. c) 10 Kg/Sq. cm : xiii) 315 mm MJP SSR SECTION - I (IX) H.D.P.E. PIPES It.no.1 P.no. 114 Ground Floor
Providing and fixing H.D.P container Syntex or alike one piece moulded water tank made out of low density polythyler and built corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity above 1000 to 20,000 litres Second Floor
Providing and fixing H.D.P container Syntex or alike one piece moulded water tank Third Floor
Providing and fixing on walls/ ceiling/ floor 15 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and fixing on walls/ ceiling/ floor 15 mm dia. CPVC pipe First Floor - 100 Students Boys & Girls Hostel
Providing and fixing on walls/ ceiling/ floor 15 mm dia. CPVC pipe Second Floor
Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe First Floor
Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe Second Floor
Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe First Floor
Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe Second Floor
Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe First Floor
Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe Second Floor
Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe First Floor
Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe Second Floor
Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Ground Floor
Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe First Floor
Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe Second Floor
Providing and fixing 15 cm rigid PVC Nahani trap including PVC grating ,bend,connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use) Ground Floor
Providing and fixing 15 cm rigid PVC Nahani trap First Floor
Providing and fixing 15 cm rigid PVC Nahani trap Second Floor
Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. Ground Floor
Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter First Floor
Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter Second Floor
Providing and laying in trenches 15 mm dai. CPVC pipe including necessary excavation, fittings. Refilling trenches etc. complete Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and laying in trenches 15 mm dai. CPVC pipe First Floor
Providing and laying in trenches 15 mm dai. CPVC pipe Second Floor
Providing and laying in trenches 20 mm dai. CPVC pipe including necessary excavation, fittings. Refilling trenches etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and laying in trenches 20 mm dai. CPVC pipe First Floor
Providing and laying in trenches 20 mm dai. CPVC pipe Second Floor
Providing and laying in trenches 25 mm dai. CPVC pipe including necessary excavation, fittings. Refilling trenches etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and laying in trenches 25 mm dai. CPVC pipe First Floor
Providing and laying in trenches 25 mm dai. CPVC pipe Second Floor
Providing and laying in trenches 32 mm dai. CPVC pipe including necessary excavation, fittings. Refilling trenches etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and laying in trenches 32 mm dai. CPVC pipe First Floor
Providing and laying in trenches 32 mm dai. CPVC pipe Second Floor
Providing and laying in trenches 40mm dai. CPVC pipe including necessary excavation, fittings. Refilling trenches etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and laying in trenches 40mm dai. CPVC pipe First Floor
Providing and laying in trenches 40mm dai. CPVC pipe Second Floor
Providing and laying in trenches 50mm dai. CPVC pipe including necessary excavation, fittings. Refilling trenches etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor
Providing and laying in trenches 50mm dai. CPVC pipe First Floor
Providing and laying in trenches 50mm dai. CPVC pipe Second Floor
Providing and fixing in position UPVC ultra violet stabilized 110 mm outer diameter cowl dome confirming to I.S.-4985 including making joints with solvent cement etc. complete First Floor
Providing and fixing in position UPVC ultra violet stabilized 110 mm outer diameter cowl dome Second Floor
Providing and fixing Glass self 125 mm wide and 600 mm long with necessary chromium plated brackets providingT.W.gutties etc. complete Ground Floor
Providing and fixing Glass self 125 mm wide and 600 mm long First Floor
Providing and fixing Glass self 125 mm wide and 600 mm long Second Floor
Providing and installing 60 A automatic water softner having capacity 6000 Ltr / day , PPL 1200 Resins 350 , Vessel diameter 14 inches , vessel height 65 inches , Silex media non applicable , output per 1000 Itr on 200 PPM hardness 40 , Maximum flow 1000 Ltr / Hr) 6 , Activation media industrial salt , salt Qty for each recharge 24 kg , Multiport Value size & mounting / pressure guage 40 NB side mount / 0.7 kg / cm 2 max operating pressure 3.50 bar etc complete and as directed by Engineer in charge Ground Floor -
Providing and installing 140 A automatic water softner having capacity 10000 Ltr / day , PPL 1200 Resins 350 , Vessel diameter 24 inches , vessel height 72 inches , Silex media 25 kg , output per 1000 Itr on 200 PPM hardness 90 , Maximum flow ( 1000 Ltr / Hr ) 14 , Activation media industrial salt , salt Qty for each recharge 56 kg , Multiport Value size & mounting / pressure guage 50 NB side mount / 0.7 kg / cm 2 max operating pressure 3.50 bar etc complete and as directed by Engineer in charge Ground Floor -
Supplying and erecting Automatic Sanitizer Dispenser body size (450mmx300mmx220mm), Wall Mounted With 5Liters Capacity of Sanitization Liquid Container and Operation type (Automatic / Touchless), Sensor type motions senser, Voltage-220V,50Hz, for power consumtion(idel mode)-<3VA and (operation mode) -25A, (MOC-Acrylonitrile butadiene styrene (ABS), Polypropylene (PP), brass), with 6 months waranty against manufacturing defects. Ground Floor -
Supplying and erecting Automatic Sanitizer Dispenser First Floor -
Supplying and erecting Automatic Sanitizer Dispenser Second Floor - 100 Students Boys & Girls Hostel
Providing and fixing in position alluminium strips of size 50mm x 3mm for nosing the steps including fixing with screws and raval plugs, bending and cutting to the required shape and size, finishing with paint, necessary mortar bedding of 1:3 cement mortar to get exact line and level including watering and curing etc.complete Ground Floor -
Providing and fixing in position alluminium strips First Floor -
Providing and fixing lioghtening conductor system comprising of erecting Air-Termination consisting of tubular copper rod of 25mm dia. 1.2 mm thick with multiple points head 1.2 mt. long ( Heavy Duty) welded or clamped to G.I. pipe pole B grade 50 mm diaof requiired length with M.S. round bnase plate 25 Cm diam and 10mm thick at bottom embeded in cement concrete 1:3:6 dfoundation of size 45 cm diam x 45 cm Height and providing earthing with copper earth plate of size 60 x 60 x 0.3 cms with cadmium plated nut bolts to fix earthing strip burried in specially prepared earth pits 1.5 metre below ground level with 40Kilogramcharcoal and salt with altemate layers of charcoal and salt and G.I.pipe 40mm dia 2 meter length burried in earthe upto earthling plate remining portion above ground level for watering and refilling comcpete Note- Copper strip fropm lightening conductor is not considered in this item. Ground Floor -
Providing and fixing 90 cm x 60 cm Granite plate engraving 10 cm. height letter, figures including painting the lefters/figures with approved colour and shade complete Ground Floor -
Supply and Installation of Dpi Flux translucent roof with standing seam multicell polycarbonate panel system. The system with complete assembly of co extruded UV protected multicell panels incorporated into a complete system. Co-extruded UV protected polycarbonate panel system of min 22 mm thick of 1200mm (min.) width with angular daylighting concept. Panels shall have minimum seven layers in a truss bridge design for higher flexibility & strength. Panels with opaque and translucent clear combination as per required lux level and design requirements with all fixing accessories to ensure best performance for wind uplift, vibration, oil canning and visual appearance. Panels shall have an additional IR Blocking features for enhance thermal comfort. Panels shall be manufactured with vertical standing seam at both sides of the panel. Panels shall be fixed on Purlin with snap on connectors with double tooth grip lock locking mechanism and will be secured on MS structure (will be paid Separately) with a continuous aluminium I Beam holding the base of the standing seam along the length of the panel & fixed with purlin with self-drilling hex head screws offering best stability with a pull-out load of min. 21000N (21KN) tested as per ISO 6892:1998 and IS 1608: 2005., as per design requirement. Panels must satisfy Dart drop impact test as per IS 14443-97 shall show no sign of breakage on Polycarbonate sheets which have been exposed to UV for a min. of 500 Hours as per ASTM G 155. Panels shall not have Ground Floor -
Providing and installing bio digester unit based on DRDO technology made of fibre reinforced plastic (FRP) having composition and following technical specifications and including necessary pipe and accessories up to 3 meter length, excluding the necessary excavation for installing the bio digester. Percentage of fibre glass (glass content in fibre glass should be minimum 30%): -33.33% Percentage of polyester resin: - 66.67% Water absorption (as per ASTM):-0.30% Flammability as per ASTM Tensile strength:-115 MPA Specific Gravity at 25 degree centigrade 1.45 Izod impact strength:-65KJ/M2 Heat defection/distort temperature:-65deg C Corrosion resistance (Non Corrosive) fitted with Inlet pipe size rigid PVC: -100mm Outlet pipe size rigid PVC:-80mm Gas outlet rigid PVC with Valve: 20mm Bacteria immobilization PVC mattes (on all partition) With DRDO TOT licensee and latest batch certificate(month & year of supply) and capacity as below c) Up to 25 user size (1.5mx1.0mx1.0m), Capacity of biodgester:-1500 liters, Area of top, bottom and side walls:- 8 sq.m, Area of partition walls: 2 sq.m, Total weight of frp: - 82.80 Kilogram, Bacteria inoculums quantity: - 600 liters, Minimum thickness of side walls / top and bottom: 5mm, Number of inside partitions: - 3, Minimum thickness of partition wall: 3mm Spec. No. As directed by Engineer in Charge. Ground Floor -
d) Up to 40 user size (2.0mx1.0mx1.0m), Capacity of biodgester:-2000 liters, Area of top, bottom and side walls: - 10 sq.m, Area of partition walls: 3 sq.m, Total weight of frp: - 106.20 Kilogram, Bacteria inoculums quantity: - 600 liters, Minimum thickness of side walls / top and bottom: 5mm, Number of inside partitions: - 3, Minimum thickness of partition wall: 3mm Spec. No. As directed by Engineer in Charge.
Design, supply, fabrication and fixing acrylic multilingual Braille (raised dots) signboards of size 6"x 9" for room titles, designed as per the drawings issued and having 4mm thick blue acrylic base plate with Upper Case San Serif words made of white acrylic non glare cut out letters of height 15mm raised not less than 0.8mm above base plate and the equivalent word/s written in Hindi with Devnagri non glare acrylic letters of height 15mm raised not less than 0.8mm above base plate. Grade 2/ Grade 1 Braille to be integral with the sign face and be raised 0.5mm above base plate.Each signboard to be fixed as per manufacturers specifications on the wall adjoining the respective room door at a height of 1200mm from FFL and as per the directions by the engineer in charge. Ground Floor -
Design, supply, fabrication and fixing acrylic multilingual Braille (raised dots) signboards First Floor -
Design, supply, fabrication and fixing acrylic multilingual Braille (raised dots) signboards Second Floor - 100 Students Boys & Girls Hostel
Providing soak pit of size 120cm x 120cm x 120cm including excavating and filling with brick-bats. Ground Floor -
RWH - Recharge Pit Providing and constructing recharge pit of 2.0m deep and 1.0m dia of pre-cast RCC rings with 6.5" dia x 25m deep borewell at the floor of recharge pit including installation of combination of solid/perforated PVC casing pipe wrapped around with netlon mesh including 300mm thick sidefilling around outside of RCC rings (annular space) with 40mm size boulders including filling of recharge pit up to 0.5m depth with 25-75mm clean washed gravels from bottom up followed by 0.5m depth of 10-25mm of clean washed stones followed by 0.5m of washed river fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) including netlon mesh between each gravel/fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) media layer including covering with RCC slab, manhole frame & cover, PVC rungs, PVC end-caps, fittings etc. including arrangement for inlet & outlet pipe excavation & backfilling as shown in the drawing.The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, taxes, including all leads, lifts at all levels. All material should be of approved make. All works complete as per the drawing, technical Ground Floor -
Boring work (including transport.) 200/215 mm diameter in the soil / gravel surface Bore diameter of 150 mm in solid rock. This includes diameter drilling work. (Wet drilling) MJP Bore Well SSR Shedule 'B' A (item no 1) Ground Floor - विंधण काम (वाहतुकीसह.) माती / मुरुमाच्या भूप्रस्तरात २०० / २१५ मी.मी. व्यासाचे विंधणकाम व पक्क्या पाषाणात १५० मी.मी. व्यासाच्या विंधण कामाचा यात समावेश आहे. (वेट ड्रिलिंग) Ground Floor -
After completion of drilling bore well, capacity test by flushing (air lift method) is measured with 90 degree "V" notch. MJP Bore Well SSR Shedule 'B' A (item no 2) विंधण विहीर पूर्ण केल्या नंतर फ्लूशिंगद्व्यारे (air lift method) क्षमता चाचणी ९० अंशाच्या "व्ही" नॉचने मोजणे Ground Floor -
180 mm diameter PVC Casing pipe (8 kg / cm2) (IS 4985-1988) In exceptional circumstances / Casing pipes with a rock surface and if more than 40 feet of casing pipe is required, the casing should be used with the technical approval of the Deputy Engineer and Geologist. १८० मी.मी. व्यासाचा पी.व्ही.सी. केसिंग पाईप (८ कि.ग्रॅ. / से.मी.) (IS ४९८५-१९८८) अपवादात्मक परिस्थितीमध्ये/दगड गोट्यांचा भूस्तर असलेल्या ठिकाणी व ४० फुटापेक्षा केसिंग पाईप अत्यावश्यक असल्यास उपअभियंता व भुवैज्ञानिक यांच्या तांत्रिक मान्यतेने सदर केसिंग वापरण्यात यावा. Ground Floor -
180 mm diameter PVC Casing pipe (8 kg / cm2) (IS 4985-1988) Casing lowering, grounding १८० मी.मी. व्यासाचा पी.व्ही.सी. केसिंग पाईप (८ कि.ग्रॅ. / से.मी.) (IS ४९८५-१९८८) केसिंग लोअरिंग, ग्राऊंटिंग करणे. Ground Floor -
180 mm diameter cap for PVC pipe. १८० मी.मी. व्यासाचा पी.व्ही.सी. पाईप साठी कॅप.
Providing the consultancy services for GRIHA certification of the building, including all related expenses in achieving Green certification, including all lead, lift and taxes; excluding GST, including conducting all awareness program during inception till the receipt of GRIHA certification and even during 2 years of defect liability period; including the fees for training programme, excluding the fee for statutory requirements and GRIHA certification which will be paid by P.W. Dept. & Site visit piad by the contractor , including all related to the achivement of the GRIHA certification etc. complete and as directed by engineer-in-charge. (For total built up aera of project ) Ground Floor -
Engaged Computer Opreter for project work (SSR 2020-21 P No 475 Sr No. 81 Supply Item)
Engaged Assistant for project work (SSR 2020-21 P No 474 Sr No. 78 Supply Item)
Providing and Fixing Vertical Blinds of approved Make and shade of 100mm regular fabric with powder coated aluminium channel with telting PVC chain & bottom weight plate with all necessary fixtures and fitting etc. complete. (Sample to be final by Engineer In-charge prior execution of work) Ground floor
Providing and Fixing Vertical Blinds First floor
Providing and Fixing Vertical Blinds Second floor
Low Height Openable Storage @ 900Lx450x750HT Providing and fixing Openable Steel Storage of 900 x 450 x 750Ht, with 2 adjustable shelves, Complete body & shutter made in 0.8 mm thick & Top in 2 mm thick CRCA, 2 Shutter to be mounted with the help of cup hinges, and 4 adjustable levelers, enitre storage in powder coated finish with 60 to 80 microns. with 25 mm. thk additional Top on top of storage as as per drawing Ground floor
Low Height Openable Storage @ 900Lx450x750HT Providing and fixing Openable Steel Storage First Floor
Full Height Steel Storage @ 750Lx450Dx2100HT Providing and fixing Openable Steel Storage of 750 x 450 x 2100Ht, with 4 adjustable shelves, Complete body & shutter made in 0.8 mm thick & Top in 2 mm thick CRCA, 4 Shutter to be mounted with the help of cup hinges, and 4 adjustable levelers, enitre storage in powder coated finish with 60 to 80 microns as as per drawing. Ground floor
Full Height Steel Storage @ 750Lx450Dx2100HT Providing and fixing Openable Steel Storage First Floor
Full Height Steel Storage @ 750Lx450Dx2100HT Providing and fixing Openable Steel Storage Second Floor
Book Case with Glass Shutter @ 825Lx300Dx1650HT Providing & Fixing of Book Case with Glass Shutter @ 825Lx300Dx1650HT:- To be made out of complete body & in 0.7mm thick CRCA & Shutter in 1.2mm thick CRCA with glass pannel in Powder coating finish as per drawing. Ground Floor
Book Case with Glass Shutter First floor
Book Case with Glass Shutter Second floor
Double Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 900mmD Providing and fixing Double Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 900mmD - BASE FRAME : Base Frame shall be fabricated in channel Type from minimum 2.5 mm thick MS Sheet Size of Channel 25mm x 100mm x 45mm. GUIDE RAILS : The guide rails shall be made out of 28mm Bright bar placed on 1.2 mm thick M.S. Plate which will be above the floor and are as per the international standard of safety. SUPER STRUCTURE : Super structure of the Mobile storage system will consist of knock down type panels. All the components such as shelves, front panel, end panel, vertical rear panel, central partition etc. Will act as an integral member of the Unit. SHELVES : Shelves made of 22SWG thick Prime Quality C.R.C.A. having 10 folds each will be provided each designed to carry a U.D.L. of 70 Kilograms. VERTICAL PANEL : Vertical panel consists of the front, Centre & rear panel shall be made out of 20SWG thick C.R.C.A. Prime quality Mild Steel & designed to take the load of shelves. Ground floor
Double Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 900mmD First floor
Providing & Arrangemnt of MId Back, Normal Syncro Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong/Nylon Base with Leather Upholstery Ground floor
Providing & Arrangemnt of Mid Back, ECO CTS Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Fabric Upholstery Ground floor
Providing & Arrangemnt of Mid Back, First floor
Providing & Arrangemnt of Mid Back, Second floor
Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. Ground floor
Public Seating Chair. - 3 Seater Second floor
Sofa Set 3+1+1 Providing & fixing Sofa Set 3+1+1 Brown and Cream leather DIMENSION Length: 182.5 (cms) Breadth (cms): 100 (cms)Height (cms): 100 (cms) Weight (Kilograms): 66 (Kilogram) Seating Capacity: Five Seat Ground floor
Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. Ground floor
Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. First floor
Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. Second floor
Free Standing Table @ 1200Lx600Dx750HT Providing and fixing Table of Size 1200 x 600 x 750 mm. Top: made from 25 mm Prelaminated Particle board. All edges are covered by 2 mm. Thk. PVC edge bands glued by hot melt glue applied by auto edge banding machine. Legs : C Shape made from CRCA Sheet with Powder Coat finish. Modesty panel : Made from 18mm both side prelaminated particle boards.All edges are covered by 0.8mm PVC edge bands glued by hot melt glue applied by auto edge banding machine.KEYBOARD TRAY ( WITHOUT MOUSE TRAY ) :- Metal Powder Coated - Black Color, CPU TROLLEY :- Metal Powder Coated - Black Color, 3 DRAWER PEDESTAL UNIT having overall size 392L x 450D x 680Ht. mm. with central lock and key. Drawers and body are complete metal with powder coat finish, facia in 18 mm prelaminated particle board, Ground floor
Free Standing Table First floor
Free Standing Table Second floor
Library Area Table @ 1350Lx750Dx750HT Providing & Fixing of FREE STANDING TABLE @ 1350Lx750Dx 750HT:- TOP to be made of 25 mm thick Prelaminated particle board with PVC edge band, BENT LEG to be CHROME FINISH as per drawing. Ground floor
Library Area Table First floor
12 Seater Reading Table for Library @ 3600Lx1200Dx750HT Providing and Fixing 12 Seater Reading Table for Liberary @ 3600Lx1200Dx750HT Top: made from 25 mm Prelaminated Particle board. All edges are covered by 2 mm. Thk. PVC edge bands glued by hot melt glue applied by auto edge banding machine. Gable Ends : made from 25 mm Prelaminated Particle board. All edges are covered by 2 mm. Thk. PVC edge bands glued by hot melt glue applied by auto edge banding machine. Modesty panel : Made from 18mm both side prelaminated particle boards.All edges are covered by 0.8mm PVC edge bands glued by hot melt glue applied by auto edge banding machine. Ground floor
12 Seater Reading Table for Library First floor
Single Bed @ 2025LX 1000DX 650H Providing and fixing Single Bed of Size 2025Lx1000Dx650H with matress and pillow. Understructure: - The legs are made of Square tube of size 25 x 25mm made out of MS with a thickness of 1.2 mm. The legs should have corner brackets welded to it at two levels. The corner brackets are made of 2mm thick CRCA having a L shaped structure to join the side panels and headboard to the leg. Three nos. of Horizontal stiffeners are provided at equal intervals. The stiffeners are made of Square tube of size 25 x 25mm made out of MS with a thickness of 1.2mm. The middle Horizontal Stiffener has a leg attached to it to transfer the load to the ground and add to the strength and stability of the complete structure. This leg is also made of Square tube of size 25 x 25mm made out of MS with a thickness of 1.2mm. All Metal components to undergo 7 tank treatment process and should be powder coated to the thickness of minimum 50 Microns DFT.
Single Bed @ 2025LX 1000DX 650H First floor
Single Bed @ 2025LX 1000DX 650H Second floor
Providing Lown (30 cm.depth) :- Excavating the ground to a requied dept pf 30 cms, removing & conveying unwanted stuff to a requied distance as directed, Filling fresh garden soil /silt and manure in excavated area in 3:1 proportion to a ht. of 30 cm .Mixing garden soil and manure thrughly well leveling watering the same., planting ready plants of edging /border at distance of 25 cm a^art by watering,sterring of casualitys ,etc complete.
Preparing Edging or border : Excavating the ground to a required depth of 20 cms in the required area removing and conveying unwanted stuff, rubbish to the required distance as directed. Filling the excavated part with fresh soil and maure in 3:1 proportion to a required height to 20 cms.Mixing, levelling, watering the same.Planting rooted edging/border plants at distance of 20cms apart watering,weeding,stirring of soil, replacing casualties, pruing if necesaary etc.complete
Preparing clipped Hedge:- Excavating the ground to a required depth of 30 ems'. Removing & conveying unwanted stuff to a required distance as directed. Filling fresh garden soil & manure in excavated area in 3:1 proportion to a height of 30 cms. Mixing garden soil & manure thoroughly, well leveling, watering on previous night. Planting Hedge plants of required species in two rows. Distance between two rows & between two plants will be 25 cms. Maintaining till well established by watering, weeding, strring the soi! and clipping if necessary etc. complete
Preparing Flower Bed:- Excavating the ground to a required depth of 30 cms. Removing & conveying unwanted stuff to a required distance as directed. Filling fresh garden soil & manure in excavated area in 3:1 proportion to a required height of 30 cms. Mixing garden soil & manure thoroughly, well leveling watering on previous night. Planting seedling of required annuals 25 cms. apart Maintaining till wel established by watering, weeding, strring replacing of casualties etc.complete.
Preparing Canna Bed:- Excavating the ground to a required depth of 30 cms. Removing rubbish & conveying unwanted stuff to a required distance as directed. Filling fresh garden soil & manure in excavated area in 2:1 proportion to a required height of 30 cms. Mixing garden soil & manure thoroughly well leveling, watering on previous night. Planting well leveling, watering on previous night. Planting wel developed Canna rhizomes 40 cms apart. Maintaining till well established by watering, weeding, Strrin replacing, casualatie etc. complete
reparing Shrubbery : Excavating the ground to required depth of 30 cms, removing and conveyini unwanted stuff to a required distance as directd. Filling fresh garden soil & Manure in excavated area proportion to a height of 30 cms. Mixing garden soil and manure thoroughly well levelling, waterin °n previous night, planting well developed shrubs plant 0.5 Mtrs apart as directed and maintaining til by watering,weeding,stirring, replacing casualtie^tc. complete
Planting small and medium size ornamental/Flowering plant:- Diggin pit with size 0.6m x 0.6m x 0.6m, removing and conveying unwanted stuff to a required distance as directed. Filling the pit with fresh garden soil & Farm Yard maure upto a height of 0.60m in 3:1 proportion. Mixing sol and manure thoroughly well, levelling, watering the same previous night. Planting suitable ground covers as directed in staggering pattern, distance between two rows 25cms. watering and maintaining till well established.
Rose plant :- Excavating pit with size 0.3 x 0.3 x 0.3 m removing and "conveying unwanted stuff to a required distance as directed. Filling fresh garden soil and manure in excavated area in 3:1 proportion to a required height to 0.3 m.Mixing garden soil & manure thoroughly well,,levelling, watering on previous night.Planting 10 to 50 cms height healthy plant of required rose varietyh.Mainta^ng till well established by watering, weeding, stirring.replacing of casualties etc complete.
PART (B) Qc & Royalty Charges Royalty charges as per SSR for - sand
Royalty charges as per SSR fo - All other Minerals
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Cement - Standard Consistancy , Fineness , specific gravity , setting time ( Initial & Final ) Compressive Strength soundness
Providing test Report from PWD VQC Lab / Govt Lab for - Fine Aggregate - Fineness Moudulus , Silt & Clay content
Providing test Report from PWD VQC Lab / Govt Lab for - Sand -Carrying out basic tests on Aggeregates for Water absorption,specific gravity.Impact value,crushing value.
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Aggeregates for sieve analysis
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Concrete - concrete cube for compressive strength
Providing test Report from PWD VQC Lab / Govt Lab for - Concrete mix design
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Brick - water absoption Efflorescence , compressive strength
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Ceramic tiles / Vitrified tiles
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Steel bar - above 16 mm
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of steel bar - upto 16 mm
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of paving Block
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Mortar
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Stone / Rubble -Abrasion Value , Flakiness index & elongation indes
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Soil / Murum-for field moisture
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of soil / Murum for liquid limit and plastic limit
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Wood
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Flush door
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of Aluminium Section
Providing test Report from PWD VQC Lab / Govt Lab for - Basic Test of G.I. pipes
Electrical Work Supplying & erecting HMS P.V.C. conduit 25 mm. dia. with necessary accessories in wall/floor with chiselling appropriately as per specification No: WG-MA/CC.
Supplying & laying HMS PVC conduit 25 mm dia with necessary accessories in RCC work/false ceiling/false flooring as per specification No. WG-MA/CC.
Supplying & erecting HMS P.V.C. conduit 32 mm. dia. with necessary accessories in wall/floor with chiselling appropriately as per specification No: WG-MA/CC.
Supplying & laying HMS PVC conduit 32 mm dia. with necessary accessories in RCC work/false ceiling/false flooring as per specification No. WG-MA/CC.
Supplying and erecting UPVC reinforced flexible conduit 20 mm in dia. conforming to I.S. with required number of couplings, PVC bushes, check nuts etc. complete.
Supplying and erecting PVC trunking (PVC casing-n-capping) of size 25 mm with accessories on wall/ceiling as per specification No: WG-MA/CON.
Supplying and erecting PVC trunking (PVC casing-n-capping) of size 32 mm with accessories on wall/ceiling as per specification No: WG-MA/CON.
Supplying & erecting mains with 2x1.5 sq.mm F.R copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW
Supplying & erecting mains with 1x1.5 sq.mm F.R copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW
Supplying & erecting mains with 2x2.5 sq.mm F.R copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places. as per specification No: WG-MA/BW
Supplying & erecting mains with 2x6 sq.mm F.R copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW
Supplying & erecting mains with 1x2.5 sq.mm F.R copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places. as per specification No: WG-MA/BW
Supplying & erecting mains 2x1.5 sq.mm. and earth wire 1.5 sq.mm FR PVC copper wire, ISI mark HMS PVC conduit min. 20mm dia, as per specification No: WG-MA/PC.
Supplying & erecting mains with 2x2.5 sq.mm. and earth wire 1.5 sq.mm FR PVC copper wire, in HMS PVC conduit min. 20mm dia, as per specification No: WG-MA/PC.
Supplying and erecting ISI mark modular type switch 6A / 10A duly erected on provided plate and box with wiring connections complete.
Supplying and erecting ISI mark modular type switch 16A duly erected on provided plate and box with wiring connections complete.
Supplying and erecting ISI mark modular type 3 pin 6A multi sockets with safety shutter, duly erected on provided plate and box with wiring connections complete.
Supplying and erecting ISI mark modular type 3 pin 6 / 16A multi socket with safety shutter, duly erected on provided plate and box with wiring connections complete.
Supplying and erecting ISI mark modular type T.V. socket single outlet, duly erected on provided plate and box with wiring connections complete.
Supplying and erecting ISI mark modular type telephone socket two gang with safety shutter, duly erected on provided plate and box with wiring connections complete.
Supplying and erecting ISI mark modular type (two module) electronic step regulator for fan, duly erected on provided plate and box with wiring connections complete. Note: Add Rs 57/- for additional two module box with double mounting plate if required.
Supplying and erecting PVC Surface modular switch box with double mounting plate for 3 modules duly erected.
Supplying and erecting PVC Surface modular switch box with double mounting plate for 6 modules duly erected.
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 6 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.
Wiring for plug on board with Modular Switch socket, copper wiring and earthing as per specification No: WG-PW/SW
Wiring for plug on board with Switch socket concealed type, copper wiring and earthing and with modular accessories as per specification No: WG-PW/CW
Point wiring for light/fan/bell in 20 mm ISI marked HMS PVC conduit with 1.5 sq.mm (2+1E) FR grade copper wire, flush type switch, earthing and required accessories as per specification No: WG-PW/SW (Light Point)
Point wiring for light/fan/bell concealed type in min 20 mm ISI marked HMS PVC conduit with 1.5 sq.mm. (2+1E) FR grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/CW
Point wiring for light/fan/bell hybrid type (Surface type under false ceiling and concealed type for drops & switch boards on walls) in min 20 mm PVC conduit / casing n capping with 1.5 sq.mm. (2+1E) FR grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/HW
Point wiring in PVC trunking (casing-capping) with 1.5 sq.mm (2+1E) FR grade copper wire, modular type switch, earthing and required accessories as per specification No: WG-PW/SW
Point wiring in PVC trunking (casing-capping) with 1.5 sq.mm (2+1E) FR grade copper wire, modular type switch, earthing and required accessories as per specification No: WG-PW/SW (Fan Point)
Staircase Point wiring in PVC trunking (casing-capping) with 1.5 sq.mm (2+1E) FR grade copper wire, modular type switch, earthing and required accessories as per specification No: WG-PW/SW
Supplying and erecting LED square / circular 16 to 20W down lighter having pressure die-cast aluminium housing, opal translucent cover, mounting arrangement with board for surface type or spring loaded mounting clips for flush type complete.
Supplying and erecting square shaped CRCA /die-cast aluminium powder coated housing LED panel light (slim edge-lit) 600x600mm suitable for 36 W-40W with provision for plane front frame with translucent cover fixed to the housing complete.
Making suitable size of recess in any type of false ceiling for erection of flush type LED panel light 600mm x 600mm and finishing the background to match the original ceiling surface.
Supplying & erecting LED 18W tube light fitting (4 feet) with polycarbonate housing, heat sink, integrated HF electronic driver complete.
Supplying and erecting bulkhead fitting suitable for upto LED upto 12W fixed on wall. As per specification no. FG-IDF/BHF
Supplying and erecting LED Mirror Light with integrated driver including 14W to 18W lamp with polycarbonate housing and opal diffuser to be fixed above mirror or as required on clamps complete.
Supplying and erecting ding dong / electronic musical type call bell with heavy duty coil suitable to operate on 230V A.C. supply erected on polished double wooden block/sunmica block of suitable size
Supplying and erecting LED Street light fitting suitable for above 40W to 48W lamp, including lamp, with PF > 0.95 class IP 65 and above housing of pressure die cast aluminium alloy and heat sink extruded aluminium complete per specification No . FG-ODF/FLS2.
Supplying and erecting Street light bracket for erection of side entry fitting on pole with 40 mm. dia. ‘B’ grade G.I. pipe of required length complete as per specification no. FG-BKT/SLB
Supplying & erecting 5W-7W, 230V integral type LED Lamp suitable for B-22/E-27 base.
Supplying and erecting fresh air cum exhaust fan of light duty250 V A.C. 50 cycles 225mm. 1400 RPM rust proof body & blades, wire mesh, duly erected in an approved manner.
Supplying and erecting five star rated energy saving Ceiling fan 230 V A.C. 50 cycles 1200 mm complete erected in position as per specification no. FG-FN/CF
Supplying and erecting fan hook box of 10 mm M.S. round bar bounded to the R.C.C. bars upto 50 mm length each side and pierced through a 16 S.W.G. thick aluminium/M.S. Bowl 100 mm dia.or equivalent square size and having depth upto 75 mm complete erected with duly painted by one coat of red oxide paint and two coats of paint erected in position and without any leakage of slurry of cement concrete on either side of the box and positioned to the bottom level of the slab.
Supplying and erecting ‘B’ grade G.I. pipe / M.S. pipe down rod duly painted for fan complete erected with PVC three core flexible cable 1 sq. mm copper PVC wire.
Supplying, erecting & marking SPMCB 6A to 32A, C-series (for motor/power) in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking SPMCB 6A to 32A, B- series (for lighting) in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking TPMCB 40A to 63A in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking FPMCB 40A to 63A in provided distribution board as per specification no. SW-SWR/MCB
Supplying & erecting CRCA sheet metal one way enclosures suitable for DP MCB /TP MCB /FP MCB erected on angle iron/GI frame complete.
Supplying & erecting triple pole and neutral distribution board (TPNDB) with door surface/ flush mounted suitable for 3 pole MCCB as incomer & outgoing SP MCB (12 poles) or TP MCB of 4 ways (12 poles) on iron/ GI frame. (vertical busbar type) as per specification no. SW-SWR/MCBDB1
Supplying & erecting triple pole and neutral distribution board (TPNDB) with door surface/ flush mounted suitable for 3 pole MCCB as incomer & outgoing SP MCB (24 poles) or TP MCB of 8 ways (24 poles) , on iron/ GI frame. (vertical busbar type) as per specification no. SW-SWR/MCBDB1
Supplying & erecting triple pole and neutral distribution board (TPNDB) with door surface/ flush mounted SP / TP MCBs of 12 ways, on iron/ GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB
Providing & erecting 3 Pole MCCB upto 100A, 415V, with short circuit rating 25 kA (Ics=100% of Icu ),adjustable thermal (overload) setting and fixed magnetic setting with provided leads, provision for installation of shunt/ UV/ trip alarm contact and MCCB should have phase barriers both sides, in provided enclosure on iron /GI frame as per specification no. SW-SWR/MCCB
Providing & erecting 3 Pole MCCB of 250A,415V capacity with short circuit rating 36 kA (Ics=100% of Icu) adjustable thermal (overload) setting and fixed magnetic setting with provided leads, provision for installation of shunt/ UV/ trip alarm contact and MCCB should have phase barriers both sides, in provided enclosure on iron /GI frame as per specification no. SW-SWR/MCCB
Providing & erecting 3 Pole MCCB upto 100A, 415V, with short circuit rating 25 kA (Ics=100% of Icu ),adjustable thermal (overload) setting and fixed magnetic setting with provided leads, provision for installation of shunt/ UV/ trip alarm contact and MCCB should have phase barriers both sides, in provided enclosure on iron /GI frame as per specification no. SW-SWR/MCCB
Providing, erecting and commissioning 4 pole RCCB only of electromagnetic type with 30/100/300 mA sensitivity and having capacity of 40A complete as per specification no. SW-RCCB/RCCB
Providing & erecting floor / wall mounting, MCCB panel board with door suitable for four pole incoming 250A, 4 ways four pole outgoing upto 100 A MCCB's on iron frame, as per specification no SW-SWR/MCCBPB. (Excluding MCCB'S)
Providing & erecting incoming and outgoing cable alleys suitable for MCCB panel board with door of 250A incoming and 4 way outgoing or 400A incoming and 2 way outgoing made from CRCA sheet 1.6 mm thick duly powder coated and having vertical insulated partition for shielding between the shared face of cableway and DB complete.
Supplying, erecting & terminating XLPE armoured cable 3½ core 70 sq. mm. aluminium conductor with continuous 8.35 sq. mm. (10 SWG) G.I. earth wire complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating XPLE armoured cable 4 core 16 sq. mm. aluminium conductor with continuous 5.48 sq. mm. (12 SWG) G.I. earth wire complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating XLPE armoured cable 3½ core 120 sq. mm. aluminium conductor with continuous 12.97 sq. mm. (8 SWG) G.I. earth wire complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying & erecting G.I. pipe ‘A’ class 40 mm dia. erected for enclosing XLPE armoured cable on wall/pole as per specification no. CB-CE
Supplying & laying (including excavation) 25 cm dia RCC Hume pipe of standard thickness at required depth up to 90 cms. below road / ground surface, for covering provided cable & necessary back filling with light ramming to make the road/ground surface as it was (Except bitumen carpet).
Supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, to required depth complete.
Supplying and laying (including excavation of suitable width & depth up to 90 cm) 75 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, to required depth complete.
Providing & erecting Hot dipped galvanized perforated type cable tray manufactured from 16 swg (1.6 mm thick) GI sheet of 150 mm width & 75 mm height complete with necessary coupler plates & hardware in approved manner.
Providing & erecting Hot dipped galvanized cover suitable for perforated type cable tray manufactured from 18 swg (1.2 mm thick) GI sheet of 150 mm width & 20 mm height complete with necessary hardware in approved manner.
Providing earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP
Supplying & erecting G.I. pipe ‘A’ class 50 mm dia. erected for enclosing XLPE armoured cable on wall/pole as per specification no. CB-CE
Supplying and erecting GI earth wire of high purity of different sizes used for earthing or any other purposes on wall with necessary G. I. Clamps fixed on wall/cable/ conduit with screws in an approved manner.
Supplying and erecting storage type horizontal / vertical water heater 25 litres capacity with BEE 5 star rating high impact resistance engineering plastic body on wall / loft complete duly tested and marking sr. no. and date of erection. specification no.AP-WH/STWH
Supplying and erecting LED Mirror Light with integrated driver including 14W to 18W lamp with polycarbonate housing and opal diffuser to be fixed above mirror or as required on clamps complete.
Supplying and erecting exhaust fan heavy duty 230 V, A.C. 50 cycles 375/380 mm. 900 RPM complete erected in position as per specification no. FG-FN/EXF
Providing recess in brick wall suitable for erection of exhaust fan up to 450mm. sweep complete with grouting of nut, bolts, plastering and colour washing to match the colour of the wall for the wall thickness of 225 mm.
Supplying & erecting 22 SWG G.I sheet metal cawl sector shaped with 25 x 25 x 3 (mm) angle iron frame, metal mesh to avoid birds entry with necessary material, suitable for exhaust fan of 400 mm as per specification no FG-FAS/MSC
Fire Fighting Works Supplying, erecting & terminating XPLE armoured cable 4 core 16 sq. mm. aluminium conductor with continuous 5.48 sq. mm. (12 SWG) G.I. earth wire complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying & erecting G.I. pipe ‘A’ class 25 mm dia. erected for enclosing XLPE armoured cable on wall/pole as per specification no. CB-CE
Supplying, installing, testing and commissioning with perfect aligning, proper levelling of booster pump of 450 LPM at 35 m head 7.5 HP (5.5 KW), 3 phase, 415 volt, 50Hz or of suitable HP with suitable stages as per specification no. FF-MFP/BP
Supplying & erecting automatic control panel for 3 Ph, 415 volt, A.c. Submersible/centrifugal pump set upto 7.5 HP consisting of DOL starter having relay range 9-14 AMP,S.P.P., Combined ammeter/voltmeter, phase indicating lamp enclosed in CRCA powder coated Vibration proof enclosure with IP 54 protection. Control Panel should offer single phasing, phase reversal, phase imbalance etc
Supplying and erecting G.I. pipe above ground of ‘C’ class ERW of size 25 mm dia with necessary fittings complete as per specification no. FF-PP
Supplying and erecting G.I. pipe above ground of ‘C’ class ERW of size 100 mm dia with necessary fittings complete as per specification no. FF-PP
Supplying and erecting G.I. pipe above ground of ‘C’ class ERW of size 150 mm dia with necessary fittings complete as per specification no. FF-PP
Providing coating of bitumen paint & 4mm thick wrapping for underground 100 mm ring main of fire fighting system.
Supplying and erecting 100 mm dia end line strainer for positive suction complete as per specification no. FF-VL/ELS
Supplying & erecting cast iron double flange butterfly valve of size 100 mm dia. complete as per specification no. FF-VL/BFV
Supplying and installing wall mounting swinging Hose reel drum fitted with 19 mm dia. 30m long high pressure polypropylene (Polyhose) fitted with necessary accessories complete as per specification no. FF-FFA/HV
Supplying fire fighting reinforced rubber lined (R.R.L.) hose pipe, 63mm dia, 15m in length, fitted with necessary accessories complete as per specification no. FF-FFA/RRL
Supplying and erecting M.S./CRCA cabinet for housing single hydrant valve (size 400 x 400 x 400mm.) made from 16 SWG sheet and angle iron 25 mm. x 25 mm. x 4 mm. having front doors with viewing glass (8"x6") and locking arrangement with necessary fixing material such as rubber bidding etc. duly painted in post box red colour.
Providing earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP
fire Bucket (10.2.24) Providing Round bottom fire bucket of 9 Litres capacity as per IS : 2546 made out of 24 gauge G.I. sheet with extra handle at bottom duly painted white inside and red outside with FIRE Mark, on provided stand/ wall hook complete.
fire Bucket (10.2.25) Providing Floor mounting stand for keeping 4 Nos. of FIRE buckets 1500mm in length, 900mm in height frame made out of 30x30x4 mm angle iron with cross supports for legs, welded with 4 hooks and duly painted with one coat of red lead and two coats of silver paint complete.
Supplying & erecting Carbon Dioxide (CO2) fire extinguisher of 4.5 kg. capacity cartridge type conform to IS 2878 /15683 complete erected with necessary clamp made from 50 x 6 mm. M. S. flat with nut & bolts grouted in wall complete.
Supplying and erecting ABC powder type fire extinguisher as per IS : 13849 /15683 of 6 kg capacity with necessary clamp for erection on wall.
Supplying & installing one piece moulded HDPE / fibre water tank for negative suction only, having capacity 1000 litres fitted with necessary accessories complete as per specification no. FF-FFA/PT
Supplying, installing, testing and commissioning manual call point (Pill box) with break glass push button in metal enclosure complete as per specification no. FF-FAAS/MCP
Supplying, installing, testing and commissioning hooters with CRCA enclosure complete as per specification no. FF-FAAS/HTR
Supplying, installing, testing and commissioning FR, XLPE armoured cable 2 core 1.5 sq.mm. copper conductor complete erected on wall/ ceiling complete as per specification no. CB-LT/CU
Supplying, installing, testing and commissioning of 2 Zones Microprocessor based conventional fire alarm control panel (FACP) with standard accessories complete as per specification no. FF-FAAS/FACP