Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.7 LAccepted-Finance | 1 | Accepted-Finance L-1 | |
| 2 | 2₹28.8 L+₹1.1 L (4.04%)Accepted-Finance | 2 | Accepted-Finance L-2 | |
| 3 | 3₹35.0 L+₹7.3 L (26.3%)Accepted-Finance | 3 | Accepted-Finance L-3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹33.5 L
EMD Value
₹34,000
Closing Date
4 Mar 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2022_UPTCL_674464_2
SHORT TERM E-TENDER NO. ETC-II/L/75/2021-22
Open Tender
Electrical Works
Item Rate
365 days
ETD, RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE, ETC-II, UPPTCL, LUCKNOW
₹34,000
24 Mar 2022
22 Feb 2022
5 Mar 2022
22 Feb 2022
4 Mar 2022
22 Feb 2022
180 days
Amount
Following Works are to be Carried out on 132 KV Transmission Lines under Raebareli with all Cost of Men, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work as per Technical Specifications & Direction of the Supervising Engineer:
PART-A: Genernal Patrolling / Lopping Chopping works.
Periodic Quarterly Routine Tower to Tower Patrolling from one end to other end of Following Transmission Lines and Submission of Patrolling Report in Triplicate in Prescribed Proforma Mentioning the Stolen / Missing Tower Parts & Tower Accessories; Trees Falling in the Range of Line Corridor; Damage to Earthwire, Conductor, Jumper, Insulator & other Line Accessories; damaged Foundation, Coping, Chimney, Earthing etc. The Patrolling shall be done Every 03 Months with all due Care of Safety & Precautions :
132 KV Bachhrawan-Bachhrawan Line (14.92kmx04 times=59.68km)
132 KV Harchandpur TSS Line (16.522kmx04 times=66.088km)
132 KV Amawan-Bachhrawan Line (28.03kmx04 times=112.12km)
132 KV Bighapur-Sareni Line (38.399 kmx04 times=153.596km)
132 KV Amawan-Salon Line (39.08kmx04 times=156.32km)
132 KV Bachhrawan-Sareni Line (65.41kmx04 times=261.64km)
132 KV Dalmau-Sareni Line (23.089 kmx04 times=92.356km)
Emergency Patrolling of the above Transmission Lines in the event of Tripping / Break Down of the Line (to Commence within 2 hrs. of Intimation for the same, if Tripping / Breakdown in Day Time and by 07:00 A.M., if Tripping / Breakdown in Night Hours) as per Instructions of Supervising Engineer as per Details given below :
Emergency patrolling of line upto 20 km distance (01 Job for each emergency patrolling)
Emergency patrolling of line more than 20 km upto 50 km distance (01 Job for each emergency patrolling)
Emergency patrolling of line more than 50 km distance (01 Job for each emergency patrolling)
Periodic Cutting of different types of Trees like Babool Mango, Neem, Sheesham, Peepal, Semal, Eucalyptus, Popular etc. having Girth 0.5 Meter to 1.0 Meter and Falling in the Range of Corridor of above Transmission Lines to Provide Minimum Clearance of about 8 Meter between the Tree & Conductors on both side of the Towers / Line with all due Care of Safety & Precautions to Avoid any damage to nearby Buildings, Power & Telephone Lines passing nearby, Crops, other nearby Trees etc. The Work also includes Removing, Eliminating & Cleaning the Line Sites after Cutting of the Trees during the Period of 1 Year (200 Nos. Trees x 4 Times in a Year = 800 Nos. Trees) (As per site requirement Periodic Cutting of different types of Trees will be increased or decreased)
Periodic Lopping & Chopping of Branches of different types of Trees like Mango, Neem, Sheesham, Peepal, Semal, Eucalyptus, Popular etc., Falling in the Range of Corridor of the above Transmission Lines to Provide the Minimum Clearance of about 8 Meter between the Tree & Conductors on both side of the Towers / Conductors of above said Transmission Line with all due Care of Safety & Precautions to Avoid any Damage to nearby Buildings, Power & Telephone Lines Passing nearby, Crops, other nearby Trees etc. The Work also includes Removing, Eliminating & Cleaning the Line Sites after Lopping & Chopping of the Trees (2250 Nos. Trees x 4 Times in a Year = 9000 Nos. Trees) (As per site requirement Periodic Cutting of different types of Trees may be increased or decreased)
Hot Spot Scaning at all towers, mid span joints, repair sleeves & jumpers of following transmission lines. Thermal image of thermoscan of suspension clamps, jumpers, mid span joints & repair sleeves comparising all details of all tower location no. (span between) with GPS Co-ordinates, temperature must be provided in A4 photosheet and soft copy as well. One A4 sheet should not contain more than 06 photograph.
132 KV Bachhrawan-Bachhrawan Line (14.92km)
132 KV Harchandpur TSS Line (16.522km)
132 KV Amawan-Bachhrawan Line (28.03km)
132 KV Bighapur-Sareni Line (38.399 km)
132 KV Amawan-Salon Line (39.08km)
132 KV Bachhrawan-Sareni Line (65.41km)
132 KV Dalmau-Sareni Line (23.089 km)
PART-B: Routine normal and breakdown maintenance works
General/Routine/Normal Preventive Maintenance Works on above 132 KV Transmission Lines (Work without Shut Down)
Removal of nut and bolts of damaged/cut tower pieces of above 132 KV transmission lines by miscreants by due cutting of tack welding with help of grinder/cutting tool (numbers per bolt)
Replenishment of tower parts in place of missing ones after due fabrication of tower parts as per sample from "off sizes" GI angles to be provided by department as per requirement by due cutting, drilling etc. And then fixing the same at required places at different tower locations at above 132 KV transmission lines with proper tightening an chamfering etc. including cost of transportation of GI angles to site.
Tack welding of nut and bolts for newly replenished tower parts with 3 tacks of 10mm thikness and finally applying Zinc with Aluminium paint on affected surfaces on above 132 KV transmission lines (numbers per bolt).
Providing and fixing number plates as per sample in place of missing ones at different tower location of above 132 KV Transmission lines with proper tightening including cost of number plate.
Providing and fixing danger plates as per sample in place of missing ones at different tower location of above 132 KV Transmission lines with proper tightening including cost of danger plate.
Providing and fixing of phase plates sets as per sample in place of missing ones at different tower location of above 132 KV Transmission lines with proper tightening including cost of phase plates sets.
Earthing work on above 132 KV transmission lines (at location where earthing is damaged) by providing of pipe type earthing equipement set consisting of 32mm dia, 3050mm long heavy duty perforated "C" class GI pipe, 50mmX6mm size and 4750mm long galvanized steel flat, 02 nos. 12mmX40mm size GI nuts and bolts, spring washers etc. as per sample including earth work and cost of coke, salt etc. (01 Job per earthing).
Repairing of damaged coping of above 132 KV transmission lines including breaking damaged portion, if any, including cost of cement, mortar,sand etc. (01 Job per chimney).
Repairing of damaged chimney of above 132 KV transmission lines including breaking damaged portion, if any, including cost of cement, mortar,sand etc. (01 Job per chimney).
Back filling of tower legs of above 132 KV Lines with earth upto ground level including cost of earth etc.
Routine preventive maintenance works and tripping/breakdown based emergency maintenance work of above 132 KV Transmission lines (work during shutdown)
Diversion/ mobilization of gang for attending breakdown due to damage of jumper/ suspension and tension disc insulators/suspension and tension disc insulator string/ dislocated vibration dampers of conductor / earthwire / earthwire suspension clamps and replacement of damaged earhtwire copper bond etc. of above 132 KV transmission lines to complete the work in Bare Minimum Time and Return Back of the Gang after Completion of the Work. (1 Job per Planned Shut Down/breakdown)
Tightening of Jumpers alongwith Replacement of Fasteners, as per hotpoint found in thermography as per requirement on Section Towers of above 132 KV Transmission Lines, jumpers and fasteners shall be Provided by the Department.
Replacement of damaged jumper along with replacement of fasteners with new ones by making jumper with compression joint method / replacement of jumper with help of PG clamp on above 132 KV transmission lines.
Replacement of Damaged / De-Capped Tension Disc Insulator / Tension Disc Insulator String / Damaged Tension Polymer Insulator String on Section Towers of above 132KV Transmission Lines.
Re-Fixing & Tightening of Dislocated / Shifted conductor Vibration Damper to its Place including Replacement of Fasteners, if Required, to be Provided by the Department as per Requirement on above 132KV Transmission Lines.
Re-Fixing & Tightening of Dislocated / Shifted Earth Wire Vibration Damper to its Place including Replacement of Fasteners, if Required, to be Provided by the Department as per Requirement on above 132KV Transmission Lines.
Tightening of earthwire suspension clamp on "A" type towers of above 132KV Transmission Lines.
Replacement of damaged earthwire copper bond by new ones to be provided by department on section towers of above 132KV Transmission Lines.
Major Routine Preventive Maintenance Work on above Transmission Lines (Work during planned Shut Down) :
Immediate Diversion / Mobilization of Gang for Attending Break Down due to Damage of Tension Disc Insulator String / Tension Polymer Insulator String / Conductor / Earth Wire of above 132KV Transmission Lines Required to Complete the Work in Bare Minimum Time and Return Back of the Gang after Completion of the Work. (1 Job per planned shutdown)
Replacement of Damaged / De-Capped Tension Disc Insulator / Tension Disc Insulator String / Damaged Tension Polymer Insulator String on Section Towers of above 132KV Transmission Lines (01 job per string).
Replacement / Repairing of Damaged Portion of Conductor/ replacement of PG clamps from conductor of above 132KV Transmission Lines by Way of Releasing the Respective Phase Conductor from Suspension Fitting of the Towers, if Required between the Section Towers, Cutting of Damaged Portion of the Conductor, Jointing new Conductor with the help of Mid Span Joint / Dead End Fitting / Repair Sleeve by Making Compression Joint. Finally, Re-Stringing and Sagging of the Conductor as per Sag Chart with Clamping the Conductor at Suspension Towers as Required, as per Details below :
1 Conductor of 1 Span Section
1 Conductor of more than 1 Span Section and Length upto 1 Km
1 Conductor of more than 1 Span Section and Length between 1 to 2 Km
Replacement / Repairing of Damaged Portion of earthwire / replacement of missing earthwire of above 132KV Transmission Lines by Way of Releasing the Respective Phase Conductor from Suspension Fitting of the Towers, if Required between the Section Towers, Cutting of Damaged Portion of the Conductor, Jointing new Conductor with the help of Mid Span Joint / Dead End Fitting / Repair Sleeve by Making Compression Joint. Finally, Re-Stringing and Sagging of the earthwire as per Sag Chart with Clamping at Suspension Towers as Required, as per Details below :
Earthwire of 1 Span Section
Earthwire of more than 1 Span Section and Length upto 1 Km
Earthwire of more than 1 Span Section and Length between 1 to 2 Km
Tripping / Breakdown Based Emergency Major Maintenance Work on above Transmission Lines (Work during Break Down / Emergency Shut Down) :
Immediate Diversion / Mobilization of Gang for Attending Break Down due to Damage of Tension Disc Insulator String / Tension Polymer Insulator String / Conductor / Earth Wire of above 132KV Transmission Lines Required to Complete the Work in Bare Minimum Time and Return Back of the Gang after Completion of the Work. (1 Job per Break Down)
Replacement of Damaged / De-Capped Tension Disc Insulator / Tension Disc Insulator String / Damaged Tension Polymer Insulator String on Section Towers of above 132KV Transmission Lines
Attending Break Down of Conductor by Replacement / Repairing of Damaged Portion of Conductor of above 132KV Transmission Lines by Way of Releasing the Respective Phase Conductor from Suspension Fitting of the Towers, if Required between the Section Towers, Cutting of Damaged Portion of the Conductor, Jointing new Conductor with the help of Mid Span Joint / Dead End Fitting / Repair Sleeve by Making Compression Joint. Finally, Re-Stringing and Sagging of the Conductor as per Sag Chart with Clamping the Conductor at Suspension Towers as Required, as per Details below :
1 Conductor of 1 Span Section
1 Conductor of more than 1 Span Section and Length upto 1 Km
1 Conductor of more than 1 Span Section and Length between 1 to 2 Km
Shaurya Shakti Enterprises
M/s Janta Charan
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .