| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 251 A KARAKATHIKOTTAI MANAMELKUDI TALUK PUDUKKOTTAI 614 619 | PUDUKKOTTAI | TAMIL NADU | 614619 | Admitted-Finance |
Tender Value
₹87.9 L
EMD Value
₹88,000
Closing Date
29 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director,
DRDA, Pudukkottai
Deepening and Improvements to the Ooranies_7 nos. in AGAMT-II-2021-22 Village panchayats of Manamelkudi Block in Pudukkottai District in Package no.42
2022_RDTN_243556_1
PUDUKKOTTAI DISTRICT - AGAMT II - 2021-2022
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹88,000
23 Aug 2022
23 Jul 2022
29 Jul 2022
23 Jul 2022
29 Jul 2022
23 Jul 2022
Amount
Deepening to Kalikoil Oorani and Construction of Bathing Ghaut,Lining Wall and Inlet @ Vettivayal Panchayat
Clearing the Light Jungle without uprooting and clearing away carefully and burning as directed by the Engineer in charge of the works and as per technical Specification
Earth work excavation in all soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of buns,breaking clods sectioning etc.,complete.
Sectioning during farming bunds earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:2:4mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Leading Channel and Lining Wall in Baby Pond
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Inlet
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Supplying,hoisting,laying and fixing in position of RCC hume Pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Deepening to Sambu Oorani and Construction of Bathing Ghaut,Lining Wall , Inlet and Retaining Wall-5m @ Jegathapattinam in Keelamanjakkudi Panchayat
Clearing the Light Jungle without uprooting and clearing away carefully and burning as directed by the Engineer in charge of the works and as per technical Specification
Earth work excavation in all soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of buns,breaking clods sectioning etc.,complete.
Sectioning during farming bunds earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:2:4mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Leading Channel and Lining Wall in Baby Pond
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Inlet
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Supplying,hoisting,laying and fixing in position of RCC hume Pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Retaining Wall
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Deepening to Enthal Kulam and Construction of Bathing Ghat, Lining Wall & Inlet at Eralivayal in Kottaipattinam Panchayat
Clearing the Light Jungle without uprooting and clearing away carefully and burning as directed by the Engineer in charge of the works and as per technical Specification
Earth work excavation in all soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of buns,breaking clods sectioning etc.,complete.
Sectioning during farming bunds earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:2:4mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Leading Channel and Lining Wall in Baby Pond
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Deepening to PudukKulam and Construction of Bathing Ghat, Lining Wall and Inlet at Kodikulam in Kottaipattinam Panchayat
Clearing the Light Jungle without uprooting and clearing away carefully and burning as directed by the Engineer in charge of the works and as per technical Specification
Earth work excavation in all soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of buns,breaking clods sectioning etc.,complete.
Sectioning during farming bunds earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:2:4mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Leading Channel and Lining Wall in Baby Pond
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Deepening to Sambankoil Oorani and Construction of Bathing Ghaut,Lining Wall , Inlet and Retaining Wall @ Karakottai in Karakottai Panchayat
Clearing the Light Jungle without uprooting and clearing away carefully and burning as directed by the Engineer in charge of the works and as per technical Specification
Earth work excavation in all soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of buns,breaking clods sectioning etc.,complete.
Sectioning during farming bunds earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:2:4mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Leading Channel and Lining Wall in Baby Pond
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Inlet
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Supplying,hoisting,laying and fixing in position of RCC hume Pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Retaining Wall
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Deepening to Adaikkalam Kathan Oorani and Construction of Bathing Ghat,Lining Wall and inlet at Erdaiyathimangalam in Edaiyathimangalam Panchayat
Clearing the Light Jungle without uprooting and clearing away carefully and burning as directed by the Engineer in charge of the works and as per technical Specification
Earth work excavation in all soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of buns,breaking clods sectioning etc.,complete.
Sectioning during farming bunds earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:2:4mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Leading Channel and Lining Wall in Baby Pond
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Deepening to Saliyam Adaippu Oorani and Construction of Bathing Ghat, Lining Wall & Inlet at Saliyam in Minnamozhi Panchayat
Clearing the Light Jungle without uprooting and clearing away carefully and burning as directed by the Engineer in charge of the works and as per technical Specification
Earth work excavation in all soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of buns,breaking clods sectioning etc.,complete.
Sectioning during farming bunds earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:2:4mix using 20mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Leading Channel and Lining Wall in Baby Pond
Earthwork excavation for Foundation in all soils and depositing on bank inclusive of shoring,strutting and bailing out water wherever necessary,well rammed,consolidated and depositing the surplus earht in places as shown by the departmental officers with the standard specification.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
Providing Steel Centering for RCC slabs,beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joints of size 10cm 6.50cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing,laying and curing etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PL R AND CO
Bidder Name
RRK AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .