| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC 304 MAGIZHAMPOO STREET GOMATHIPURAM 6TH MAIN ROAD MADURAI 21 | MADURAI | TAMIL NADU | 625001 | ₹5.3 Cr | L1 | Accepted-AOC L1 contractor |
| 2 | L2₹5.6 Cr+₹26.3 L (4.97%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹5.6 Cr+₹26.3 L (4.97%) | L2 | Rejected-Finance L2 Contractor |
| Sl No | Description | Qty | Unit | M/s. LUCKY ASSOCIATES L1 | Suganya Constructions L2 |
|---|---|---|---|---|---|
| 1.00NAME OF WORK : - Strengthening and Black Topping Road of Vialipatti Semminipati Road KM 0/0 - 0/850 ( R 99 ) VPR | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,224 | Sqm | 6.25 ₹7,650 Lowest | 7 ₹8,568 |
| 3.00 | Picking the BT Surface including Cost and Conveyance | 1,057.44 | Sqm | 23.25 ₹24,585.48 Lowest | 24 ₹25,378.56 |
| 4.00 | Earth work excavating and deposting on bank with borrow bits in hard stiff clay,stiff black cotton,hard red earth,shales,murrum,gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layer of 250mm loose thick each, sectioning,watering and compacting etc, complete as per MOST 301-305 | 1,224 | Cum | 140.5 ₹1,71,972 Lowest | 148 ₹1,81,152 |
| 5.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction watering and compacting by Power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., completeSide berms | 102 | Cum | 611.1 ₹62,332.2 Lowest | 642 ₹65,484 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 480.66 | Cum | 2,490 ₹11,96,843.4 Lowest | 2,615 ₹12,56,925.9 |
| 7.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,204.38 | Sqm | 87.1 ₹2,79,101.5 Lowest | 91 ₹2,91,598.58 |
| 8.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,204.38 | Sqm | 20.4 ₹65,369.35 Lowest | 21 ₹67,291.98 |
| 9.00 | BITUMINOUS MACADAM 50 MM Thick including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete | 160.22 | Sqm | 9,312 ₹14,91,968.64 Lowest | 9,778 ₹15,66,631.16 |
| 10.00 | BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 80.11 | Cum | 11,917 ₹9,54,670.87 Lowest | 12,513 ₹10,02,416.43 |
Tender Value
₹5.4 Cr
EMD Value
₹5.4 L
Closing Date
27 Feb 2026, 3:00 pmClosed
Joint Director/Project Director DRDA Madurai
o/o Joint Director DRDA Collectorate Campus Madur
Strengthening of 3 nos of Roads in Vadipatti and Alanganallur Block Madurai District under MGSMT Additional (2025-26) Package no 02
2026_RDTN_663644_2
DIPR/1245/Tender/2026
Open Tender
Civil Works
Item Rate
180 days
Alanganallur vadipatti
Refer Tender document
3 documents required · 3 mandatory
₹0
₹5.4 L
o/o Joint Director DRDA Collectorate Madurai
13 Mar 2026
22 Feb 2026
27 Feb 2026
22 Feb 2026
27 Feb 2026
23 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | NAME OF WORK : - Strengthening and Black Topping Road of Vialipatti Semminipati Road KM 0/0 - 0/850 ( R 99 ) VPR | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,224 | Sqm | - | - |
| 3 | Picking the BT Surface including Cost and Conveyance | 1,057.44 | Sqm | - | - |
| 4 | Earth work excavating and deposting on bank with borrow bits in hard stiff clay,stiff black cotton,hard red earth,shales,murrum,gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layer of 250mm loose thick each, sectioning,watering and compacting etc, complete as per MOST 301-305 | 1,224 | Cum | - | - |
| 5 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction watering and compacting by Power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., completeSide berms | 102 | Cum | - | - |
| 6 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 480.66 | Cum | - | - |
| 7 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,204.38 | Sqm | - | - |
| 8 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,204.38 | Sqm | - | - |
| 9 | BITUMINOUS MACADAM 50 MM Thick including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete | 160.22 | Sqm | - | - |
| 10 | BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 80.11 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
MGSMTAddl02.pdf
Tender Documents • 3.97 MB
BOQ_797251.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .