| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.4 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹13.6 L+₹17,556.88 (1.31%)Rejected-AOC | 2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | BALAN S L2 | B. Vinothkumar L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 36.55 | m2 | 251 ₹9,174.05 | 246 ₹8,991.3 Lowest |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 9.79 | m3 | 5,419 ₹53,052.01 | 5,410 ₹52,963.9 Lowest |
| 1.03 | Supply and Filling with Red gravel including all labour charges for filling including watering ramming, consolidation and other incidental charges etc., complete | 17.41 | m3 | 662 ₹11,525.42 | 655 ₹11,403.55 Lowest |
| 1.04 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 28.93 | m3 | 6,119 ₹1,77,022.67 | 6,110 ₹1,76,762.3 Lowest |
| 1.05 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 22.12 | m3 | 9,217 ₹2,03,880.04 | 9,210 ₹2,03,725.2 Lowest |
| 1.06 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1,500 | kg | 95 ₹1,42,500 | 90 ₹1,35,000 Lowest |
| 1.07 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,(for column ,E.beam,plinth,beam) | 78.42 | m2 | 521 ₹40,856.82 | 515 ₹40,386.3 Lowest |
| 1.08 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam,sunshade etc complete., | 85.65 | m2 | 1,038 ₹88,904.7 | 1,030 ₹88,219.5 Lowest |
| 1.09 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 286.25 | m2 | 276 ₹79,005 | 271 ₹77,573.75 Lowest |
| 1.10 | Provision for Cupboard Cuddapah slab 40 mm tk inclding supply and fixing etc | 8.1 | m2 | 1,297 ₹10,505.7 | 1,290 ₹10,449 Lowest |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
24 Dec 2024, 3:20 pmClosed
BDO
Panchayat union Office
Construction of New Anganwadi building in Uppudurai (AWC) at Muthalamparai Panchayat
2024_RDTN_512282_1
73/2023/A1
Open Tender
Civil Works
Item Rate
90 days
k.myladumparai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,000
1 Dec 2025
19 Dec 2024
24 Dec 2024
19 Dec 2024
24 Dec 2024
19 Dec 2024
Amount
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Supply and Filling with Red gravel including all labour charges for filling including watering ramming, consolidation and other incidental charges etc., complete
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,(for column ,E.beam,plinth,beam)
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam,sunshade etc complete.,
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Cupboard Cuddapah slab 40 mm tk inclding supply and fixing etc
Weathering course concrete using best quality broken brick jelly of size 20 mm. uniform gauge in pure slaked lime ( no sand to be used ) over the RCC roof slab in the proportion of brick jelly to lime being 32 : 12 1/2 by volume and laid over in a single
Finishing the top of roof with one course of machine pressed tiles of size 20 cm x 20 cm x 2 cm of approved quality laid in cement mortar 1 : 3 ( one cement and three sand ) 12 mm. thick mixed with water proofing compound confirming to ISS by 2% weight
Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Door1.00 x 2.10 m
Door 1.10 x 2.10 m
Door 0.75 x 1.20 m
Fabrication and supply of mild steel window of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
window 1.20 x 1.30 m
ventilator 0.90 x 0.45 m
Labour charge for fixing Doors and windows
Window
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Plastic Emulsion painting two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall )
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Supply and fixing of Water closet with "P" trap, PVC Pipes, Jolly 0.60 x 0.45m, Precast slab for Manhole cover & Lock and key etc. complete.
Supplying and fixing in position white / colour glazed European Water Closet of best quality and approved make with 100 mm "P" or "S" trap connecting with CI pipe of 100mm dia / PVC pipe
Provision for HDPE tank of 1000 litres Capacity
pipe line works
Earth work excavation in all classes of soil for pipe line trench
supply and delivery of 20mm pvc pipe
Laying and jointing the pvc pipe line
Re-filling with excavated earth as per standard spesification
supply and delivery of 20mm GI pipe-pwd
provition for Internal pipe connection
20mm pvcelbow
20mm pvc tee
20mm pvc Tap
20mm pvc gate valve
110mm pvc pipe-4ksc for the sanitory works
110mm pvc Tee-4ksc for the sanitory works
110mm pvc elbow-4ksc for the sanitory works
Light point SD 25
Fan point SD 25
Fan SOR SD 107
Plug point SD 38
CFL lamp-BH fitting SD 80
LED light fittings
G I Pipe (20mm)
Service Wire SD 64
Exhaust fan SD 114
Bulk head fitting SD 83
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
BALAN S (BID ID -1218078)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .