| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-2₹38.1 L+₹1.4 L (3.14%)Accepted-AOC CONTRACTOR SC 133 A B TYPE COLONY SARNI DISTT BETUL M P 460 447 | BETUL | MADHYA PRADESH | 460447 | L-2 | Accepted-AOC As evaluated by committee Accepted | |
| 2 | L-1₹43.6 LRejected-Finance | L-1 | Rejected-Finance The offered rate of M/s Shri Sai Rail Services for item No. 1 is not complying minimum workable rate condition of tender ,hence not considered for award of contract | |
| 3 | L-3₹45.1 L+₹1.5 L (3.33%)Rejected-Finance | L-3 | Rejected-Finance As evaluated by committee |
Tender Value
₹48.7 L
EMD Value
₹1.2 L
Closing Date
13 Apr 2020, 3:30 pmClosed
SE PURCHASE AND WORK SSTPP DONGALIA
FLOOR 3RD ADMIN BUILDING SE PURCHASE AND WORK SSTPP DONGALIA
Annual work of maintenance of MPPGCLs private railway siding from Surgaon Banjari railway station to Bir railway station at SSTPP, MPPGCL, Dongalia Ditt. Khandwa.
2020_MPPGC_81729_1
WT-1055
Open Tender
Miscellaneous Works
Item Rate
365 days
SE PURCHASE AND WORK SSTPP DONGALIA
As per NIT
10 documents required · 10 mandatory
₹1,000
Payable To
₹1.2 L
Yes
2 Sept 2020
16 Mar 2020
18 Apr 2020
16 Mar 2020
13 Apr 2020
16 Mar 2020
Amount
Maintenance of Permanent way including bridges as per Indian Railway Specifications and as directed by the Engineer-In-Charge. (22.511 ETKM Per Month for-12 month =270.132 ETKM) Note:- The rate for the maintenance per equated KM of track is for complete maintenance of track throughout the month.
Removing and taking out old worn out or damaged rails from existing track including returning the same to Plant’s store, taking delivery, fixing in position new or usable rails supplied by the Department Free of cost including all operations such as alignment, levelling, gauge maintenance etc. from and with all type of sleepers etc. complete and as per the direction of Engineer-In-Charge.
Removing and taking out old worn out or damaged sleepers (any type of sleepers) from existing track including returning the same to Plant’s store and taking delivery fixing in position new or usable sleepers including pre-stressed cement concrete sleeper with fittings supplied by the department free of cost including all operations such as levelling, packing of sleepers etc. all complete and as per the direction of Engineer-In-Charge
Drilling 12mm to 32mm dia holes in rails Supplied by the department with contractor’s own tools plants, lapour, all handling, leads, lifts, consumables etc. all complete as per the direction of Engineer-In-Charge.
Running out of fresh ballast in B.G. tack of Surgaon Banjari to Bir railway siding at different locations designated by Enginer-In-Charge from the stacks at site including all lifts and screening of ballast, removing the dust etc.
Alumino Thermic Welding with short preheating process of rail joint of 60 Kg/90UTS T-12(1st Quality) rail on cess or in situ as per requirement and locations as directed by Engineer in Charge of the work i/c cost of the all labours and materials, tools, fuel, prefabricated moulds i/c handiling of rails, cropping of rail ends, providing specified gap at rail joints, finishing of welded joints as per specifications i/c USFD testing and all other testing of welded joints as per specifications i/c USFD testing and all other testing of as laid as laid down in RDSO manual of fusion welding of Rails by alumino, thermite process Sept. 1998 with corrections slips as issued as a complete job as per RDSO specifications no. T-19/1984. The contractor has to arrange all the testing as laid down in the aforesaid manual at his cost.
Earth work for repairing of cess & embankment with hard soil including excavation transporting to site with all leads and lifts compaction at OMC to dry density not below 90% with cost of watering and other miscellaneous works i.e. benching, dressing etc. complete job as per direction of Engineer-In-Charge.
Disposal of slide earth from reaches of cutting portion of track from side drains and track with all leads and lifts ensuring proper drainage slopes etc. complete as per direction of Engineer-In-Charge.
annapurna traders
KRISHNA ENGINEERING CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .