Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.7 L
Closing Date
26 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Executive Engineer (O&M) Dn. Rajim
Tender for Installation of additional 25KVA Transformer at new bus stand Fingeshwar under Fingeshwar Dc.
108647
EE/(O&M)/NRJM/WK/2025-26/T-1971
Chhattisgarh
5 Oct 2026
5 Oct 2026
26 Oct 2026
CHHATTISGARH STATE POWER DISTRIBUTION COMPANY LIMITED
(Government of Chhattisgarh Undertaking)
(A Successor Company of CSEB)
No. /AE/Fing./WORK/ Fing. Dt -
The Executive Engineer
CSPDCL N.Rajim (C.G)
Subject:- Submission of proposal for inviting tender.
Please find enclosed here with the proposal for inviting tender
1 Estimate for Installation of additional 25KVA Transformer at new bus stand Fingeshwar under Fingeshwar Dc.
Sl no. ESTIMATE WORK ORDER Tender AMT
No. Date No. Date
Encl;- as above
ASSISTANT ENGINEER
(O&M) Sub Dn.CSPDCL, FINGESHWAR
LIST OF ESTIMATES
S. No. Name of Work Village Name of DC Estimate Details Work order No.&Date K No. Provision of work Estimate Amount / Provision CSPDCL Board Material Material Amount Service Amount Tender Amount
X'mer 11 KV LINE LT LINE OTHER
No. Date No. Date
1 Estimate for Installation of additional 25KVA Transformer at new bus stand Fingeshwar under Fingeshwar Dc. New bus stand Fingeshwar Fingeshwar 78 032 5349 26 K49032260354 K49032260355 1×25 0.00 0.15 0.00 313,398.00 59,421.06 131,352.54 39,717.76 171,070.30
ASSISTANT ENGINEER
(O&M) Sub Dn.CSPDCL, FINGESHWAR
BOQ FOR MATERIAL TO BE PROVIDED BY THE CONTRACTOR
(Adnl. 25 KVA X-mer New Bus-Stand FNG.)
Village New Bus stand Fing.
Esternal Order No. K49032260354
S No. Bin Code Name of Material Unit Price GST Rate Materail Rate Qty Material Amount
4 7130820010 11KV 45KN DISC INSULATOR T&C TYPE (POLYM NO 111.39 16.99 94.40 6.00 566.39 668.34
5 7130820241 11 KV Strain hardware fittings. NO 160.75 24.52 136.23 6.00 817.37 964.5
8 7130600026 MS Angle 50x50x6 mm X-mer Clamping set KG 43.00 6.56 36.44 20.00 728.81 860
9 7130860032 STAY SET WITHOUT STAY WIRE16mm Paint11KV NO 592.97 90.45 502.52 2.00 1,005.03 1185.94
20 7130840029 LIGHTNING ARRESTORS11 KV gapless type. NO 327.80 50.00 277.80 3.00 833.39 983.4
26 7130311009 ALUMINIUM 1C 50 SQ MM UNARMOURED LT PVC M 70.49 10.75 59.74 30.00 1,792.12 2114.7
30 Total Material Amount (A) 42,757.48
31 Labour charges as per Sch. No CL-3 Labour charges as per Sch. No CL-3 M3 9,303.30 1.00 9,303.30
32 Service in lieu of Earthing, Coal & Sand Service in lieu of Earthing, Coal & Sand M3 3,361.28 1.00 3,361.28
33 Labour charges for Concreting Labour charges for Concreting M3 740.31 1.10 814.34
34 Transportation Charge @ 2% of (A/1.18) Transportation Charge @ 2% of (A/1.18) NO 1,897.47 94873.30*2/100=1897.47 0.90 1,707.72
35 Total Service Amount (B) 15,186.64
36 GRAND TOTAL (A+B+C) 57,944.12
ASSISTANT ENGINEER
(O&M) Sub Dn.CSPDCL, FINGESHWAR
BOQ FOR MATERIAL TO BE PROVIDED BY CSPDCL
(Adnl. 25 KVA X-mer New Bus-Stand FNG.)
Village New Bus stand Fing.
Esternal Order No. K49032260354
S No. Bin Code Name of Material Unit Price GST Rate Materail Rate Qty Material Amount
2 Material Amount 55,098.90 65,016.70
4 Total Material Amount (A) 59,231.32
5 Labour charges as per Sch. No CL-3 Labour charges as per Sch. No CL-3 M3 9,303.30 0.00 0.00
6 Service in lieu of Earthing, Coal & Sand Service in lieu of Earthing, Coal & Sand M3 3,361.28 0.00 0.00
7 Labour charges for Concreting Labour charges for Concreting M3 740.31 0.00 0.00
8 Transportation Charge @ 2% of (A/1.18) Transportation Charge @ 2% of (A/1.18) NO 1,897.47 94873.30*2/100=1897.47 0.10 189.75
9 Total Service Amount (B) 189.75
10 GRAND TOTAL (A+B+C) 59,421.06
ASSISTANT ENGINEER
(O&M) Sub Dn.CSPDCL, FINGESHWAR
BOQ FOR MATERIAL TO BE PROVIDED BY THE CONTRACTOR
(LT line for Adnl. X-mer New Bustand FNG.)
Village New Bus Stand Fing.
Esternal Order No. K49032260355
S No. Bin Code Name of Material Unit Price GST Rate Materail Rate Qty Material Amount
4 7130820216 HARDWARE FOR 75X90MM LTSHACKLE INSULATOR NO 54.62 8.33 46.29 21.00 972.05 1147.02
7 7130860032 STAY SET WITHOUT STAY WIRE16mm Paint11KV NO 592.97 90.45 502.52 6.00 3,015.10 3557.82
13 7130300055 Round shape RCC Plte with 6mm MS Bar NO 173.00 26.39 146.61 18.00 2,638.98 3114
17 7130870013 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M NO 143.69 21.92 121.77 4.00 487.08 574.76
21 Material Amount 82,414.02 97,248.54
23 Total Material Amount (A) 88,595.07
24 3000137 Labour charges as per Sch. No DL-1 M3 71,170.52 0.30 21,351.16
25 3000137 Back filling of pole pit with boulder @ M3 255.28 6.00 1,531.68
26 3000137 Transportation Charge @ 2% of (A/1.18) M3 82,414.02 0.02 1,648.28
27 Total Service Amount (B) 24,531.12
ASSISTANT ENGINEER
(O&M) Sub Dn.CSPDCL, FINGESHWAR
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
source.json
RAW_JSON • 0.00 MB
260824-NIT_TD108647.pdf
pdf • 0.48 MB
260825-BOQ_TD108647.xlsx
xlsx • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .