Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
1 Apr 2022, 12:30 pmClosed
Chief Engineer, Jal Shakti (PHE) Department Jammu
Chief Engineer, Jal Shakti (PHE) Department Jammu
Construction of 200 mm Dia. Production Bore Wells by ODEX Method for 11 Water Supply Schemes of District Ramban of JAMMU Province under
2022_PHE_163597_1
e-NIT No. PHEJ/JJM/94 of 2021-22
Open Tender
Drilling Works
Item Rate
30 days
Construction of 200 mm Dia. Production Bore Wells
As per SBD
6 documents required · 6 mandatory
₹1,000
Chief Account Officer Jal Shakti (PHE) Department
₹35,000
Chief Engineer, Jal Shakti (PHE) Department Jammu
6 May 2022
8 Mar 2022
1 Apr 2022
8 Mar 2022
1 Apr 2022
19 Mar 2022
18 Mar 2022
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at 1) Kralchihal, 33’23’41”N, 75’11’52”E ; 2). Zanchous, 33’23’27”N, 75’13’50”E ; 3).Livera and Chamalwas 33’22’16”N, 75’12’08”E and 4). Chamalwas 33’23’03”N, 75’12’30”E) WSS Chamalwas in Ramban District under JJM.
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 110 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 04 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 04 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at Partmulla (33’15’30”N, 75’00’34”E) WSS Porthmulla in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at /near Kandoli (33’16’24”N, 75’11’45’E WSS Suligam in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 02 Nos. 200 mm dia. Bore Well by ODEX Method at /near 1) Gund 33’25’35”N, 75’12’05”E and Shabanbass ( 33’25’02”N, 75’12’16”E WSS Gund Adalkote in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 110 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 02 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 02 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at /near Heighwagan (33’23’42”N, 75’11’36”E) WSS Amkote Thachi in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 110 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at /near Chareel Darshipura (33’45’81”N, 75’19’14”E) WSS Chareel Darshipura in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 110 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at Gujjar Gali (33’15’05”N, 75’02’38”E) WSS Dalwah Upper in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at Dharam-A (33’16’39”N, 75’01’48”E) WSS Dharam in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at /near Gund Tethar (33’48’87N, 75’17’34”E) WSS Gund Tethar in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 110 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at /near HS Chanderkote (33’11’57”N, 75’17’57”E) WSS Kunfer in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 110 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200 mm dia. Bore Well by ODEX Method at Zanihal (33’45’47”N, 75’19’04”E) WSS Kaskoot Zanihal in Ramban District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 110 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
Hyper Techno Drillers Private LTD
R D Singh and Co
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .