Tender Value
₹8.5 L
EMD Value
₹25,500
Closing Date
25 Jan 2022, 6:00 pmClosed
Divisional Forest Officer, Batote
Divisional Forest Office Batote
BOQ
2022_FD_157494_1
95 of 2021-22(Re-Tender
Open Tender
Civil Works
Item Rate
60 days
Over Nallah Co 35-43 Marmat of Marmat Range
SBD
2 documents required · 2 mandatory
₹500
Divisional Forest Officer Batote
₹25,500
Yes
27 Jan 2022
18 Jan 2022
27 Jan 2022
18 Jan 2022
25 Jan 2022
18 Jan 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. and for shafts, wells, cesspits and the like (exceeding 30cm and upto 1.5m in depth as well as 10sqm on plan) upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in any kind of soil 80%, ordinary rock =20% 1x1.30x2.20=2.86 cum, 1x6.38x2.20=14.04 cum Total= 16.90 cum
Providing and laying in position cement concrete 1:5:10 of specified grade excluding the cost of centering and shuttering- All work upto plinth level. BED= 1x3.20x2.20x0.10 = 0.70 cum
Providing and laying in position RCC 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)specified grade of reinforced cement concrete excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level . RAFT = 2x3.20x2.20x0.20 = 2.82 Cum
Cement concrete 1:2:4 (20mm Agg.) work in walls (any thickness), including attached pilasters, buttresses,plinth and string courses, fillets, columns, pillars,piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement. Step-1 = 3.00x2.20x1.50 = 9.90 cum, Step-2= 1x2.00x1/2x2.80+1.50x4.00= 17.20 cum & 1x2.00x1/2x1.50+1.50x1=3.00 cum,Deductions 30% = 9.03 Net= 21.07 cum
Providing ad laying in position Reinforced cement concrete 1:1.5:3(20mm Agg Crushed ) as in Abutment. Cap etc , CAP{ 2x1.50x2.00x0.20 = 1.20 Cum
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. RAFT: @ /Kg/Cum & CAP: @ Kg/Cum
RR stone masonary with hard stone in foundation and plinth using nallah stone in Cement Mortar 1:6. Approach Wall: 2x5.00x1/2x(0.60+0.90)x1.50= 11.25 /cum
Centering and shuttering including strutting~ propping etc and removal of form work for.-Foundations footings. bases of columns. RAFT: 4x(3.20+2.20)x0.20 = 4.32 Sqm , 1st Step: 4x(3.00+2.20)x1.50= 31.20 Sqm, 2nd Step: 4x(2.00+2.15)x1.00= 16.60 Sqm, Total : 52.12 Sqm
Edges of slab &breaks in floor below 20cm wideCentering and shuttering including strutting~ propping etc. CAP: 4x(1.50+2.00) = 14.00 RM
Cement concrete 1:2:4 (20mm Agg.) work in works upto plinth level excluding cost of centring, shuttering, finishing and reinforcement. PATH= 2x5.00x1.80x0.075= 1.35 Cum
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length of Second class deodar wood Labour rate only (excluding cost of wood) including priming and painting Complete. BEAM = 3x20.00x0.30x0.40 = 7.20 cum, PLANKS = 0.00x1.50 x 0.05 = 1.50 cum, RAILING = 200x0.90x0.075x0.125= 1.69 cum Total: = 10.39 cum
Bilal Ahmed Wani
Irshad Hussain Wani
CONTRACTOR SULAMON
M/s Mohd Ishtiaq
JAVED IQBAL
IMRAN MAJID
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .