| Sl No | Description | Qty | Unit | V V STRUCTURES L1 | GSPandiyan L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in all classes of soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. except hard rock requiring blasting as per SS 20-B (HGS SS.20.B.) and depositing the same to the low lying area as directed by SIPCOT Officers with initial lead of 10m and lift of 2m. etc. complete with standard specification and as directed by the SIPCOT Officers. | 322 | Cum | 103.38 ₹33,288.36 | 105 ₹33,810 |
| 1.02 | Providing and laying Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken granite stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated, curing and cost and conveyance of all materials to site etc. complete complying with standard specification and as directed by SIPCOT Officers. | 44 | Cum | 5,612.72 ₹2.5 L | 5,620 ₹2.5 L |
| 1.03Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half M-sand and Three hard broken granite stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, complete complying with standard specification and as directed by SIPCOT Officers. | |||||
| 1.04 | In Foundation & Basement | 76 | Cum | 9,800 ₹7.4 L | 10,500 ₹8.0 L |
| 1.05 | In Ground Floor | 34 | Cum | 9,800 ₹3.3 L | 10,500 ₹3.6 L |
| 1.06Providing form work for centering and struttering for all RCC work etc. complete complying with standard specification and as directed by SIPCOT Officers. | |||||
| 1.07 | Below Plinth
For Columm footing, Grade beem, Pinth beem | 424 | sqm | 986.4 ₹4.2 L | 990 ₹4.2 L |
| 1.08 | Below Plinth
For Square and rectangular column | 33 | sqm | 1,183.68 ₹39,061.44 | 1,185 ₹39,105 |
| 1.09 | Above Plinth
For plain surfaces such as roof slab, lintel & beam | 132 | sqm | 1,094 ₹1.4 L | 1,099 ₹1.5 L |
| 1.10 | Above Plinth
For Square and rectangular column | 321 | sqm | 1,312.8 ₹4.2 L | 1,320 ₹4.2 L |
Tender Value
₹63.5 L
EMD Value
₹42,000
Closing Date
17 Sept 2025, 3:30 pmClosed
SUPERINTENDING ENGINEER
SIPCOT Head office Egmore chennai
Providing Compound wall around OHT Sump and Pump house in Furniture Park at SIPCOT Industrial Park, Thoothukudi
2025_SIPCT_598369_1
NIT.No.19/CD/T.No.19/2025-26
Open Tender
Civil Works
SIPCOT Industrial Park, Thoothukudi
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹42,000
24 Mar 2026
30 Aug 2025
18 Sept 2025
30 Aug 2025
17 Sept 2025
10 Sept 2025
Amount
Earth work excavation for foundation in all classes of soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. except hard rock requiring blasting as per SS 20-B (HGS SS.20.B.) and depositing the same to the low lying area as directed by SIPCOT Officers with initial lead of 10m and lift of 2m. etc. complete with standard specification and as directed by the SIPCOT Officers.
Providing and laying Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken granite stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated, curing and cost and conveyance of all materials to site etc. complete complying with standard specification and as directed by SIPCOT Officers.
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half M-sand and Three hard broken granite stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, complete complying with standard specification and as directed by SIPCOT Officers.
In Foundation & Basement
In Ground Floor
Providing form work for centering and struttering for all RCC work etc. complete complying with standard specification and as directed by SIPCOT Officers.
Below Plinth For Columm footing, Grade beem, Pinth beem
Below Plinth For Square and rectangular column
Above Plinth For plain surfaces such as roof slab, lintel & beam
Above Plinth For Square and rectangular column
Supplying, fabricating and placing in position of Mild Steel / Ribbed Tor Steel bars high strength deformed bars like RTS bars etc.., conforming to FE 415 Grade for all RCC works including cost and conveyance of steel, binding wire to work site cost of fabrication ,labour charges for cleaning the rods , straightening , cutting, bending, tying grills, hoisting and placing the reinforcement in position before concreting , cost of binding wire , provision of space bars, cover blocks and all other incidental charges etc., complete complying with standard specification and as directed by SIPCOT officers.
Brick work in Cement Mortar 1:5 (One cement and five m.sand) using best quality of fly ash bricks of size 230 x 110x 70 mm for foundation and basement including finishing, curing, etc., complete complying with standard specifiction and as directed by SIPCOT Officers.
Plastering in cement mortar 1:5 (One cement and five m.sand) 12mm thick including finishing curing etc., complete complying standard specification and as directed by SIPCOT Officers.
Supply and fixing M.S. Grills of pattern / design using M.S Angles/ 12mm square rods/ 25mm M.S. flat tubes etc., approved by SIPCOT officials for windows, gates, including cost and conveyance of all required materials with one coat of primer and all labour charges for fabrication, fixing in position in Concrete/ Masonry/ Wooden frames etc., complete and as directed by SIPCOT Officers.
Color washing two Coat for Gate Pillar with one coat of white washing etc., complete complying as per standard specification and as directed by SIPCOT Officer.
Painting two coat in New iron work over one coat of Red oxide priming coat etc., complete complying as per standard specification and as directed by SIPCOT Officer.
Sub Total of Total Amount in Column BA (ie. Qty x Unit Rate)
Added GST of 18%
GSPandiyan (BID ID -1462706)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid