Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC DSS 110 GROUND FLOOR SHOPPING COMPLEX SECTOR 15 125001 | HISAR | HARYANA | 125001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.1 L+₹60,500 (17.3%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.6 L+₹1.1 L (30.2%)Rejected-Finance 482 GALI NO 4 TULSI VIHAR AZAD NAGAR HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹4.8 L+₹1.4 L (38.7%)Rejected-Finance 790 STREET NO 1 PATEL NAGAR HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | L4 | Rejected-Finance L4 | |
| 5 | L5₹4.9 L+₹1.4 L (39.5%)Rejected-Finance H NO 861 12 SALARA MOHALLA ROHTAK 124001 HARYANA INDIA | ROHTAK | HARYANA | 124001 | L5 | Rejected-Finance L5 |
Tender Value
₹5.0 L
EMD Value
₹9,936
Closing Date
1 Aug 2023, 5:00 pmClosed
NAVIN KUMAR
ED - Hisar
Repairing of 200 KVA Transformer installed at Damkora Stadium (Tohana) in Distt. Fatehabad. (RECALL)
2023_HRY_299551_1
2023BC62EF79 D753 49E6 AE89 C06E7DD4A61F666BAR
Open Tender
Electrical Works
Works
30 days
DAMKORA
2 documents required · 2 mandatory
₹500
₹9,936
Yes
25 Aug 2023
25 Jul 2023
2 Aug 2023
25 Jul 2023
1 Aug 2023
25 Jul 2023
Amount
S/I/T/C of Winding (Each of Limb HV plus LV Set including the cost of loading unloading freight charges and all Taxes complete in all respect upto the entire satisfaction of the Engineer -in- Charge of the work.
S/I/T/C of Insulation material- Pressboard/ Paper/ Glue crepe and kraft Tapes/ Spacers/ Separators including the cost of loading unloading freight charges and all Taxes complete in all respect upto the entire satisfaction of the Engineer -in- Charge of the work.
S/I/T/C of Transformer oil conforming to IS-335 including the cost of loading unloading frieght charges and all Taxes complete in all respect upto the entire satisfaction of the Engineer -in- Charge of the work.
S/I/T/C of Gasket RC 70 C with Dismantling / assembly gasket replacement including the cost of loading unloading freight charges and all Taxes complete in all respect upto the entire satisfaction of the Engineer -in- Charge of the work.
S/I/T/C of Silver Brazing with Dismantling / assembly / brazing Material including the cost of loading unloading freight charges and all Taxes complete in all respect upto the entire satisfaction of the Engineer -in- Charge of the work.
S/I/T/C of Dry out in Vacuum oven including the cost of loading unloading freight charges and all Taxes complete in all respect upto the entire satisfaction of the Engineer -in- Charge of the work.
Testing of IR / PI value, Ratio by TTR, DC winding resistance, No load loss, Load loss, HV test, DVDF test, Vector group, Oil test, Pressure test and all Taxes complete in all respect upto the entire satisfaction of the Engineer -in- Charge of the work.
S.S. Enterprises
Virender Singh prop. Balaji electric company
Dhamija Power Constructions
Vijender Kumar Contractor
M/S SIYARAM ELECTRICALS HISAR
LOHAN ELECTRICAL WORKS
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .