| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
19 Mar 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Mathura
132 KV S/S Aurangabad Mathura
Replacement of gasket of 40MVA Transformer-Ist BHEL Make at 220KV Substation, Meetai under ETD Hathras
2021_UPTCL_554464_2
ET-76/ETC(M)/20-21
Open Tender
Electrical Works
Lump-sum
45 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE ETD Mathura
₹6,000
26 Mar 2021
9 Mar 2021
20 Mar 2021
9 Mar 2021
19 Mar 2021
9 Mar 2021
120 days
Carriage of oil tank of capacity 20KL from available S/S to 220 KV S/S Meetai (Approx distance 70km) and same from 220 KV S/S Meetai to available S/S, including loading and unloading (as per instructions of supervising engineer).
Drain out of complete oil from 40MVA T/F into empty oil tank (capacity 20 KL) and 209 Ltr oil drum.
Dismantling of all parts of 40MVA T/F HV/LV Neutral bushing from T/F main tank, radiators, conservator tank, PRV, Buchholz and OSR relays, oil pipe line, opening of electrical connection and proper blanking of open space for replacement of new gaskets between conservator to main tank and OLTC etc.
Attending leakage of 01 No, 40MVA T/F (132/33KV) BHEL make by replacement of old & damage gasket.
HV side bushing (top & bottom portion) of R, Y, and B phase.
LV/ Neutral bushing (top & bottom portion)
PRV gasket of T/F
Radiator pipe flange gasket
Radiator valve gasket
Radiator header plug gasket
Inspection cover HV/LV side gasket
Main tank top cover gasket involving the work of opening nut & bolts of the top cover plate (lifting the cover plate and winding by 20Cm) from its present level, cleaning the top surface, fabrication of top cover gasket as per top surface made from cork sheet joining and punching holes fifting on top surface, fitting the top cover plate and tighting the nut & bolts for proper completion of work.
Conservator tank gasket
Equaliser/Header joint gasket
Oil temperature and winding tamperature instruments
OLTC top bottom gasket
OLTC gear mechanism gasket
OLTC indicator glass
Conservator drain valve gasket
Buchholz and OSR relays gasket
Sampling valve gasket
Drain valve gasket
Gasket for oil indication glass gauge
Gasket for Magnetic oil level gauge
Air release teflon washers of radiator cap & bushing
Opening & fixing of all HV & LV side jumpers and HV & LV side neutral bushing connection.
Dismantling & fitting of radiators cooling fans.
Complete erection of 40MVA T/F, HV/LV bushing, turret, pipe lines of T/F & conservator tank, PRV, OLTC, radiator, oil cooling system tighting of all nut & bolts to complete the erection with all required T&P.
Flushing of main tank core and winding by hot centrifuged T/F oil.
Complete evacuation of 40 MVA Transformer main tank and filling of dry Nitrogen/dry air of dew point 50C better in vaccum up to pressure of 0.25Kg./Cm2 and again evacuating the transformer tank after required time interval (approx 24 Hrs.) using centrifuging machine. The work including connection of pipe of machine as required for measuring the dew point value of Nitrogen/dry air after every cycle till the required value is achieved. Dry air plant will be provided by the contractor at his own cost.
Creating of vaccum in 40 MVA T/F for 24 Hrs. at 760mm Hg.
Filling of centrifused T/F oil into T/F main tank from 20 KL oil tank and 209Ltr oil drum.
Centrifuging of complete transformer oil in transformer main tank by connecting centrifuging machine, to be arranged by the contractor alongwith operator at his own cost and taking the B.D.V values of the oil periodically till the required value is achieved PPM upto less than 5 PPM as per direction of supervising engineer.
Versha and Brothers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .