| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Fee/PreQual/Technical/Finance NO 1 1 ANNA STREET ETHIRAJ NAGAR WEST MAMBALAM METTUPALAYAM CHENNAI 600 033 | CHENNAI | TAMIL NADU | 600033 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹17.2 L+₹1.1 L (6.94%)Admitted-Fee/PreQual/Technical/Finance 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹17.4 L+₹1.3 L (7.85%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | ABBI ASSOCIATES L2 | SRK CONSTRUCTIONS L1 | NMS ENGINEERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 129 | m3 | 100 ₹12,900 | 100 ₹12,900 | 1 ₹129 Lowest |
| 2.00 | Engaging porcelin complete direction as per the departmental officers | 24 | m3 | 1,000 ₹24,000 Lowest | 1,500 ₹36,000 | 2,000 ₹48,000 |
| 3.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 129 | m3 | 50 ₹6,450 | 50 ₹6,450 | 1 ₹129 Lowest |
| 4.00 | Flooring with bed of cement concrete 1:4:8 (One part of cement, four parts of sand and eight parts of stone jelly by volume) using 40 mm thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 52 | m3 | 5,000 ₹2,60,000 Lowest | 5,000 ₹2,60,000 Lowest | 5,000 ₹2,60,000 Lowest |
| 5.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as Plain cement concrete walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 296 | m2 | 300 ₹88,800 | 250 ₹74,000 Lowest | 330 ₹97,680 |
| 6.00 | Flooring with bed of cement concrete 1:2:4 (One part of cement, two parts of sand and four parts of stone jelly by volume) using 20 mm thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 110 | m3 | 6,500 ₹7,15,000 | 5,500 ₹6,05,000 Lowest | 6,000 ₹6,60,000 |
| 7.00 | Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC Slabs, Rectangular beams, TEE or ELL beams, Lintels, Bed blocks, Staircase waist, Landing slab, Landing beam and Canopy etc., in all floors to centre etc., complete and as directed. | 62 | m2 | 800 ₹49,600 | 800 ₹49,600 | 750 ₹46,500 Lowest |
| 8.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for all RCC items of work excluding centering, shuttering and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete | 32 | m3 | 8,200 ₹2,62,400 | 8,000 ₹2,56,000 Lowest | 9,000 ₹2,88,000 |
| 9.00 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 32 | qtl | 8,200 ₹2,62,400 Lowest | 8,500 ₹2,72,000 | 9,000 ₹2,88,000 |
| 10.00 | Supplying and fixing of MS angles and grills complete diection as per the departmental officers | 350 | kg | 100 ₹35,000 | 90 ₹31,500 Lowest | 110 ₹38,500 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
13 Oct 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Widening of bridge at shanthi nagar channel at ward no27,North zone
2026_MAWS_707960_14
e70/2026-NZ
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹25,000
14 Oct 2026
25 Sept 2026
14 Oct 2026
25 Sept 2026
13 Oct 2026
25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 129 | m3 | - | - |
| 2 | Engaging porcelin complete direction as per the departmental officers | 24 | m3 | - | - |
| 3 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 129 | m3 | - | - |
| 4 | Flooring with bed of cement concrete 1:4:8 (One part of cement, four parts of sand and eight parts of stone jelly by volume) using 40 mm thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 52 | m3 | - | - |
| 5 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as Plain cement concrete walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 296 | m2 | - | - |
| 6 | Flooring with bed of cement concrete 1:2:4 (One part of cement, two parts of sand and four parts of stone jelly by volume) using 20 mm thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 110 | m3 | - | - |
| 7 | Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC Slabs, Rectangular beams, TEE or ELL beams, Lintels, Bed blocks, Staircase waist, Landing slab, Landing beam and Canopy etc., in all floors to centre etc., complete and as directed. | 62 | m2 | - | - |
| 8 | Reinforced Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for all RCC items of work excluding centering, shuttering and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete | 32 | m3 | - | - |
| 9 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 32 | qtl | - | - |
| 10 | Supplying and fixing of MS angles and grills complete diection as per the departmental officers | 350 | kg | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
SingleDocument.pdf
Tender Documents • 0.95 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_850957.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .