Loading…
Loading…
Tender Value
₹13.8 L
EMD Value
₹1.4 L
Closing Date
20 Jun 2026, 12:00 pm
eo shikarpur
NPP SHIKARPUR
WARD 23 INTER LOKING TAILES AND L TIPE NALI NIRMAN
2026_DOLBU_1157223_14
112 npp skp 27.05.2026
Open Tender
Civil Works
30 days
nppshikarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,312
eo npp shikarpur
₹1.4 L
5 Jun 2026
5 Jun 2026
20 Jun 2026
5 Jun 2026
20 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Excavating, supplying and filling of local earth (including royalty) bym mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | 1 | - | BI01010001010000000000000515BI0100001117 |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Supply and laying 80mm thick cement inter locking tiles with 4cm. Cushin fine sand layer all material, labour and T&P etc. comp. work. A.R | - | Sqm | - | - | - |
| 8 | Providing and Fixing of Inorgation sign Board. | - | Job | - | - | - |
| 9 | 18%GST | - | Nos | 0.29 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
BOQ_2168483.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid