| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.5 LAccepted-AOC | ₹31.5 L | L-1 | Accepted-AOC Work awarded to Dubey and Sons |
| 2 | L-2₹32.6 L+₹1.1 L (3.55%)Rejected-Finance | ₹32.6 L+₹1.1 L (3.55%) | L-2 | Rejected-Finance Due to L-2 |
| 3 | L-3₹43.1 L+₹11.6 L (37.0%)Rejected-Finance | ₹43.1 L+₹11.6 L (37.0%) | L-3 | Rejected-Finance Due to L-3 |
| Sl No | Description | Qty | Unit | M/s Sunil Yadav L3 | M/s DUBEY AND SONS L1 | singh consstruction L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation over area (exceeding 30cm. In depth 1.50m in width as well as 10SQM on plan) including disposal of the excavated earth lead up to 50m left up to 1.5 m disposed soil to be levelled and nearly dressed etc. all completed as per the instruction of Engineer in charge. | 108.61 | Cum | 2,036 ₹2,21,129.96 | 1,748 ₹1,89,850.28 | 1,500 ₹1,62,915 Lowest |
| 2.00 | Laying cement concrete (PCC) 1:2:4 (1cement: 2sand 4 graded aggregate 20 mm nominal size) excluding cost of centring shuttering etc, in foundation, footing etc, all completed as per the instruction of Engineer in charge. | 13.12 | Cum | 7,471 ₹98,019.52 | 6,050 ₹79,376 Lowest | 7,000 ₹91,840 |
| 3.00 | Laying reinforced cement concrete 1:2:4 (1cement: 2sand 4 graded aggregate 20mm nominal size) excluding cost of centring shuttering and reinforcement in foundation footing etc. all completed as per the instruction of Engineer in charge. | 9.79 | Cum | 8,160 ₹79,886.4 | 6,148 ₹60,188.92 Lowest | 6,500 ₹63,635 |
| 4.00 | Laying reinforced cement concrete 1:2:4 (1cement: 2sand 4 graded aggregate 20mm nominal size) excluding cost of centring, shuttering and reinforcement in suspended floors, roof, landing, shelves, and their supports balconies, lintels, beams, girders, breassumers and cantilevers up to floor two level etc. all completed as per the instruction of Engineer in charge. | 161.57 | Cum | 8,440 ₹13,63,650.8 | 6,348 ₹10,25,646.36 Lowest | 6,500 ₹10,50,205 |
| 5.00 | Centring and shuttering including strutting propring etc. and removal of from work etc. all complete as per the instructions of the Engineer in charge. columns, pillars and piers | 734.72 | sqm | 978 ₹7,18,556.16 | 648 ₹4,76,098.56 Lowest | 750 ₹5,51,040 |
| 6.00 | 12mm thick cement plastering with cement mortar 1:3 (1cement, 3sand) or any mix including curing etc. as complete as per the instruction of Engineer in charge. | 1,617.92 | sqm | 410 ₹6,63,347.2 | 250 ₹4,04,480 Lowest | 285 ₹4,61,107.2 |
| 7.00 | Mild or cold twisted or Tor steel reinforcement for RCC work including bending binding and placing in poison etc. all complete as per the instruction of engineer in charge. | 2,944 | kg | 110 ₹3,23,840 | 95 ₹2,79,680 | 75 ₹2,20,800 Lowest |
| 8.00 | Carriage of cement from colliery stores to underground through Coal tub including loading at pit top from colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to a distance of 50m in underground. | 1,269.17 | Bag | 13 ₹16,499.21 | 7.75 ₹9,836.07 Lowest | 10 ₹12,691.7 |
| 9.00 | Carriage of cement from colliery stores to underground through Coal tub including loading at pit top from colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to a distance of 50mtr. in underground. extra lead of every 50m ,
EXTRA LEAD 2 = (1.75X2)=3.50 | 1,269.17 | Bag | 4 ₹5,076.68 | 2.7 ₹3,426.76 Lowest | 3 ₹3,807.51 |
| 10.00 | Carriage of sand/ ballast/boulder etc. from stock yard to underground through Coal tub including loading at pit top from stock yard, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to distance of 50m in underground. | 95.96 | cum | 437 ₹41,934.52 | 385 ₹36,944.6 Lowest | 400 ₹38,384 |
Tender Value
₹40.7 L
EMD Value
₹50,900
Closing Date
25 Aug 2025, 5:00 pmClosed
Staff Officer (Mining), Nagpur Area
WCL, Office of Area General Manager, Nagpur Area, Jaripatka, Nagpur 440014
Construction of 32 Nos. of RCC Sectionalisation stopping at Seam IV (M) and Seam IV (B) and Seam V of Saoner Mine No. 3, Saoner Sub Area of Nagpur Area
2025_WCL_341169_1
min-e-tenderNIC-007/2025-26
Open Tender
Civil Works - Others
Item Rate
365 days
Saoner Mine No.3 of Nagpur Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,900
17 Oct 2025
9 Aug 2025
27 Aug 2025
10 Aug 2025
25 Aug 2025
10 Aug 2025
9 Aug 2025 - 18 Aug 2025
Amount
Excavation over area (exceeding 30cm. In depth 1.50m in width as well as 10SQM on plan) including disposal of the excavated earth lead up to 50m left up to 1.5 m disposed soil to be levelled and nearly dressed etc. all completed as per the instruction of Engineer in charge.
Laying cement concrete (PCC) 1:2:4 (1cement: 2sand 4 graded aggregate 20 mm nominal size) excluding cost of centring shuttering etc, in foundation, footing etc, all completed as per the instruction of Engineer in charge.
Laying reinforced cement concrete 1:2:4 (1cement: 2sand 4 graded aggregate 20mm nominal size) excluding cost of centring shuttering and reinforcement in foundation footing etc. all completed as per the instruction of Engineer in charge.
Laying reinforced cement concrete 1:2:4 (1cement: 2sand 4 graded aggregate 20mm nominal size) excluding cost of centring, shuttering and reinforcement in suspended floors, roof, landing, shelves, and their supports balconies, lintels, beams, girders, breassumers and cantilevers up to floor two level etc. all completed as per the instruction of Engineer in charge.
Centring and shuttering including strutting propring etc. and removal of from work etc. all complete as per the instructions of the Engineer in charge. columns, pillars and piers
12mm thick cement plastering with cement mortar 1:3 (1cement, 3sand) or any mix including curing etc. as complete as per the instruction of Engineer in charge.
Mild or cold twisted or Tor steel reinforcement for RCC work including bending binding and placing in poison etc. all complete as per the instruction of engineer in charge.
Carriage of cement from colliery stores to underground through Coal tub including loading at pit top from colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to a distance of 50m in underground.
Carriage of cement from colliery stores to underground through Coal tub including loading at pit top from colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to a distance of 50mtr. in underground. extra lead of every 50m , EXTRA LEAD 2 = (1.75X2)=3.50
Carriage of sand/ ballast/boulder etc. from stock yard to underground through Coal tub including loading at pit top from stock yard, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to distance of 50m in underground.
Carriage of sand/ ballast/boulder etc. from stock yard to underground through Coal tub including loading at pit top from stock yard, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer in charge and carriage of unloaded material to distance of 50m in underground. extra lead of every 50m Extra lead 2=(89.72x2 Lead) =179.44]
Carriage of steel from colliery stores to underground through Coal tub including loading at pit top from colliery stores, shutting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by engineer in charge and carriage of unloading material up to distance 50mtr. in underground.
Carriage of steel from collier stores to underground through Coal tub including loading at pit top from colliery stores, shutting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by engineer in charge and carriage of unloading material up to distance 50 m in underground. extra lead of every 50m EXTRA LEAD 2=(75.22 X 2) = 150.44
Carriage of stones chips from colliery stores to underground through Coal tub including loading at pit top from colliery stores, shutting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by engineer in charge and carriage of unloading material up to distance 50mtr. in underground.
Carriage of stones chips from collier stores to underground through Coal tub including loading at pit top from colliery stores, shutting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by engineer in charge and carriage of unloading material up to distance 50 m in underground. extra lead of every 50m EXTRA LEAD 2=(89.72 X 2) = 179.44
Total impact of GST for the purpose of CTC
singh consstruction (BID ID -1177292)
M/s Sunil Yadav (BID ID -1177919)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_353682.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .