| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.3 Cr+₹21.3 L (6.93%)Rejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹3.3 Cr+₹21.3 L (6.93%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹3.4 Cr+₹31.6 L (10.3%)Rejected-Finance | ₹3.4 Cr+₹31.6 L (10.3%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹3.4 Cr+₹35.2 L (11.5%)Rejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.4 Cr+₹35.2 L (11.5%) | L-4 | Rejected-Finance L-4 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L4 | M/S J.V. CONSTRUCTION L3 | Durga Engineers and Earth Movers L2 | rupendra kumar bhardwaj L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work in cement mortar or cement concrete including all labours,T&P and machine etc. Also including disposal of refuse as directed by Engineer-in-charge. | 189.5 | cum | 450 ₹85,275 | 450 ₹85,275 | 200 ₹37,900 Lowest | 200 ₹37,900 Lowest |
| 2.00 | Hiring of diesel pumps 5 HP including operator, POL, and maintenance for dewatering including cost of all materials, labours, T&P etc for proper completion of work. | 720 | hour | 120 ₹86,400 | 145 ₹1,04,400 | 75 ₹54,000 Lowest | 100 ₹72,000 |
| 3.00 | Earthwork in excavation of foundation in all type of soil with all lead and lift i/c all cost of labour T & P- and machine etc. for proper completion of work. | 5,742 | cum | 76 ₹4,36,392 | 70 ₹4,01,940 | 65 ₹3,73,230 Lowest | 100 ₹5,74,200 |
| 4.00 | Providing and Laying in Position C.C. 1:3:6 in cement, coarse sand and stone grit for foundation footing including all cost of labours, materials, T&P, etc. for proper completion of work. | 725.5 | cum | 5,500 ₹39,90,250 | 4,000 ₹29,02,000 | 5,100 ₹37,00,050 | 3,000 ₹21,76,500 Lowest |
| 5.00 | Ist class brick work (M 150) in 1:4 cement mortar i/c all cost of materials, labours and T & P for proper completion of work. | 2,002.1 | cum | 5,100 ₹1,02,10,710 Lowest | 5,500 ₹1,10,11,550 | 5,500 ₹1,10,11,550 | 5,500 ₹1,10,11,550 |
| 6.00 | Providing and Laying in position C.C. 1:2:4 (M-15) with stone grit in C.C work including all cost of labours, materials and T & P, etc. for proper completion of work. | 460.7 | cum | 5,800 ₹26,72,060 | 6,000 ₹27,64,200 | 6,000 ₹27,64,200 | 4,500 ₹20,73,150 Lowest |
| 7.00 | Providing and Laying in position C.C. 1:1.5:3 (M-20) with stone grit in C.C work including all cost of labours, materials, and T & P, etc. for proper completion of work. | 219 | cum | 6,200 ₹13,57,800 Lowest | 7,000 ₹15,33,000 | 7,200 ₹15,76,800 | 6,500 ₹14,23,500 |
| 8.00 | Providing and Laying in position C.C 1:1:2 (M-25) with stone grit in R.C.C. work including all cost of labours, materials and T & P, etc. for proper completion of work. | 368.5 | cum | 7,200 ₹26,53,200 | 8,000 ₹29,48,000 | 7,800 ₹28,74,300 | 6,500 ₹23,95,250 Lowest |
| 9.00 | Centering and shuttering for special type of RCC work including all cost of labours and T & P, etc for proper completion of work. | 1,254 | sqm | 700 ₹8,77,800 | 550 ₹6,89,700 | 500 ₹6,27,000 Lowest | 500 ₹6,27,000 Lowest |
| 10.00 | Centering and shuttering of Cement concrete work in foundaton with proper line, level, leak proof including cost of all materials, labours and T&P etc complete required for proper completion of work. | 2,486 | sqm | 400 ₹9,94,400 | 325 ₹8,07,950 | 300 ₹7,45,800 Lowest | 500 ₹12,43,000 |
Tender Value
₹4.0 Cr
EMD Value
₹8.1 L
Closing Date
23 Feb 2026, 3:00 pmClosed
S.E. Drainage Circle, Aligarh
Office Of S.E.Drainage Circle. Aligarh
Strengthening of Banks, Brick Pitching works and Re-Construction of Damaged Culverts, Syphons and outlets at Various Chainages of Suhawali Dy.
2026_UPIDC_1107352_2
21/SE/DCA/2025-26
Open Tender
Civil Works - Canal
Item Wise
365 days
FIROZABAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,993
₹8.1 L
28 Mar 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in cement mortar or cement concrete including all labours,T&P and machine etc. Also including disposal of refuse as directed by Engineer-in-charge. | - | cum | - | - |
| 2 | Hiring of diesel pumps 5 HP including operator, POL, and maintenance for dewatering including cost of all materials, labours, T&P etc for proper completion of work. | - | hour | - | - |
| 3 | Earthwork in excavation of foundation in all type of soil with all lead and lift i/c all cost of labour T & P- and machine etc. for proper completion of work. | - | cum | - | - |
| 4 | Providing and Laying in Position C.C. 1:3:6 in cement, coarse sand and stone grit for foundation footing including all cost of labours, materials, T&P, etc. for proper completion of work. | - | cum | - | - |
| 5 | Ist class brick work (M 150) in 1:4 cement mortar i/c all cost of materials, labours and T & P for proper completion of work. | 1 | cum | - | - |
| 6 | Providing and Laying in position C.C. 1:2:4 (M-15) with stone grit in C.C work including all cost of labours, materials and T & P, etc. for proper completion of work. | 1 | cum | - | - |
| 7 | Providing and Laying in position C.C. 1:1.5:3 (M-20) with stone grit in C.C work including all cost of labours, materials, and T & P, etc. for proper completion of work. | - | cum | - | - |
| 8 | Providing and Laying in position C.C 1:1:2 (M-25) with stone grit in R.C.C. work including all cost of labours, materials and T & P, etc. for proper completion of work. | - | cum | - | - |
| 9 | Centering and shuttering for special type of RCC work including all cost of labours and T & P, etc for proper completion of work. | - | sqm | - | - |
| 10 | Centering and shuttering of Cement concrete work in foundaton with proper line, level, leak proof including cost of all materials, labours and T&P etc complete required for proper completion of work. | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tendernotice_2.pdf
PDF • 1.61 MB
BOQ_2074605.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .