Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -1.10% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance | +1.10% | ₹2.9 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance | +2.00% | ₹3.0 L | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
11 May 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction Of Tractor road and earth filling with Rbm from land of sham lal to onwards at village Pindi Camp w.no.4 Pyt. Pindi Charkan Block Arnia Year 2026-27 under CDF 1st call
2026_RDPR_308739_13
e-NIT No. 10 REWJ of 2026-27 dated 27-04-2026
Open Tender
Civil Works
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,800
Yes
14 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 3.39 | cum | 479.3 | ₹1,624.83 |
| 2 | Providing and laying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 40mm size excluding the cost of centring and shuttering- all works upto plinth level. | 0.42 | cum | 4,846.3 | ₹2,035.45 |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 3.26 | cum | 5,733.6 | ₹18,691.54 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.13 | cum | 7,788.4 | ₹8,800.89 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 112.83 | kg | 123.2 | ₹13,900.66 |
| 6 | Centring and shuttering including strutting, propping etc and removal of the formwork. Footing | 8.92 | sqm | 286.35 | ₹2,554.24 |
| 7 | Slab | 2.23 | sqm | 718.2 | ₹1,601.59 |
| 8 | Edges of slab | 9.76 | sqm | 262.2 | ₹2,559.07 |
| 9 | RBM,supplying and filling (including royality) by mechanical transport also including ramming and watering etc. complete | 540 | cum | 425 | ₹2,29,500 |
| 10 | (b) Sand 30 km by MT | 2.6 | cum | 520.34 | ₹1,352.88 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_1000190.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid