| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC l1 |
| 2 | L2₹1.2 CrRejected-Finance N A | ₹1.2 Cr | L2 | Rejected-Finance L2rejected |
| Sl No | Description | Qty | Unit | RATHAKRISHNAN R L1 | Rajagopal L2 |
|---|---|---|---|---|---|
| 1.00Upgradation of Madathupatti to Srirengapuram road 0/0-2/5 in Sennampatti Panchayat in Pudur Block (R-272) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., Km 0/0 - 2/500 | 4,192.61 | Squre Meter | 6.36 ₹26,665 | 6.68 ₹28,006.63 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out Km 0/0 - 2/500 | 2,021.44 | Cubic Meter | 140.38 ₹2.8 L | 147.47 ₹3.0 L |
| 4.00Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | |||||
| 5.00 | Km 0/0 - 1/000 | 337.5 | Cubic Meter | 932.67 ₹3.1 L | 979.8 ₹3.3 L |
| 6.00 | Km 1/000 - 2/000 | 337.5 | Cubic Meter | 942.1 ₹3.2 L | 989.7 ₹3.3 L |
| 7.00 | Km 2/000 - 3/000 | 167.26 | Cubic Meter | 942.1 ₹1.6 L | 989.7 ₹1.7 L |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 Km 0/0 - 2/500 | 1,403.77 | Cubic Meter | 2,577.05 ₹36.2 L | 2,707.26 ₹38.0 L |
| 9.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0 - 2/500 | 9,358.5 | Squre Meter | 86.82 ₹8.1 L | 91.2 ₹8.5 L |
| 10.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all Km 0/0 - 2/500 | 9,375 | Squre Meter | 20.35 ₹1.9 L | 21.38 ₹2.0 L |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Additional Collector(D)/Project Director
Additional Collector(D)/Project Director
PKG20 Strengthening / Upgradation of Maduthupatti to Srirengapuram road 0/0-2/5 in Thoothukudi Block of Thoothukudi District under NABARD RIDF 2026-27
2026_RDTN_657589_7
DRDA A4/165/2026 Dt.12.02.2026
Open Tender
Civil Works - Roads
180 days
DRDA THOOTHUKUDI
As per tender Schedule
4 documents required · 4 mandatory
₹0
₹1.3 L
DRDA, Thoothukudi
14 May 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
16 Feb 2026
Upgradation of Madathupatti to Srirengapuram road 0/0-2/5 in Sennampatti Panchayat in Pudur Block (R-272)
Clearing the Scrub jungle including all labour charges for burrying and burning etc., Km 0/0 - 2/500
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out Km 0/0 - 2/500
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 Km 0/0 - 2/500
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0 - 2/500
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all Km 0/0 - 2/500
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Km 0/0 - 2/500
Supply and fixing of Kilometre stone of standard design and drawing as per IRC:8-1980 (second revision),including painting and numbering etc., and all other incidental charges etc., complete.
Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc., complete
Sub Estimate for 3.00m Span Culvert at CH 2465
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc
Supply of sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc.
Below Sill level
Above sill level
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_788847.xls
BOQ • 0.32 MB
20Pudur.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid