Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.5 LAdmitted-Finance | ₹68.5 L | L1 | Admitted-Finance |
| 2 | L2₹75.6 L+₹7.1 L (10.4%)Admitted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹75.6 L+₹7.1 L (10.4%) | L2 | Admitted-Finance |
| 3 | L3₹78.0 L+₹9.4 L (13.8%)Admitted-Finance | ₹78.0 L+₹9.4 L (13.8%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹36.5 L (53.3%)Admitted-Finance 4 91C BYPASS ROAD PUDUKOTTAI THOOTHUKUDI THOOTHUKUDI TUTICORIN THOOTHUKUDI TAMIL NADU 628103 | TUTICORIN | TAMIL NADU | 628103 | ₹1.1 Cr+₹36.5 L (53.3%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IMMANUEL AND CO L4 | Ramesh Enterprises L2 | KUMAR PLANTATIONS L3 | JK LANDSCAPING L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Engaging of tractor trolley for shifting the cut grass to burning yard and transportation of local earth for area development or other works as on when required basis, including hiring charges, mobilization charges, driver, fuel, tools & tackles etc., all in complete as directed by EIC. | 2,000 | Hrs. | 650 ₹13,00,000 | 800 ₹16,00,000 | 400 ₹8,00,000 Lowest | 450 ₹9,00,000 |
| 2.00 | Engaging of Earth excavator-wheeled backhoe loader (JCB) for carrying out the removal of Wild vegetation , Wild Grass & bushes, Uprooting of Odai trees, Area development, Land leveling & etc., by mechanical means as on when required basis including the hiring charges, mobilization charges, driver, fuel, tools and tackles all in complete as directed by the Engineer in charge. | 3,000 | Hrs. | 1,200 ₹36,00,000 | 1,150 ₹34,50,000 Lowest | 1,165 ₹34,95,000 | 1,200 ₹36,00,000 |
| 3.00 | Engaging of water tanker for supplying water to lawn and trees, and other asscciated works as on when required basis including hiring charges, Mobilization charges, fuel, driver, delivery hose pipe of sufficient length, Tools & tackles etc., all in complete as directed by EIC.
Note: The water tanker is to be filled within ZC. The water will be supplied free of cost. | 2,000 | Hrs. | 1,300 ₹26,00,000 | 220 ₹4,40,000 Lowest | 400 ₹8,00,000 | 500 ₹10,00,000 |
| 4.00 | Engaging of tractor rotavator for carrying out the removal of wild vegetation , wild grass & bushes, area development, land leveling & etc., by mechanical means in as on when required basis including hiring charges, mobilization charges, driver, fuel, tools and tackles etc., all in complete as directed by the Engineer in charge. | 3,000 | Hrs. | 1,000 ₹30,00,000 | 690 ₹20,70,000 | 900 ₹27,00,000 | 450 ₹13,50,000 Lowest |
Tender Value
₹71.0 L
EMD Value
₹1.4 L
Closing Date
13 Aug 2026, 2:00 pmClosed
Chief Engineer and DCE (CED, PD and EP)
Nuclear Fuel Complex, Chief Engineer and DCE (CED, PD and EP), Sarathi building IInd floor
Biennial contract for Engaging of Backhoe Loader JCB, Tractor Rotovator, Tractor Trolley and Water tanker at Zirconium Complex, Pazhayakayal, Tuticorin 628152.
2026_NFC_918072_1
C/1446/2026
Open Tender
Civil Works
Item Rate
730 days
NFC, Pazhayakayal
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.4 L
9 Sept 2026
20 Jul 2026
14 Aug 2026
20 Jul 2026
13 Aug 2026
23 Jul 2026
20 Jul 2026 - 22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging of tractor trolley for shifting the cut grass to burning yard and transportation of local earth for area development or other works as on when required basis, including hiring charges, mobilization charges, driver, fuel, tools & tackles etc., all in complete as directed by EIC. | 2,000 | Hrs. | - | - |
| 2 | Engaging of Earth excavator-wheeled backhoe loader (JCB) for carrying out the removal of Wild vegetation , Wild Grass & bushes, Uprooting of Odai trees, Area development, Land leveling & etc., by mechanical means as on when required basis including the hiring charges, mobilization charges, driver, fuel, tools and tackles all in complete as directed by the Engineer in charge. | 3,000 | Hrs. | - | - |
| 3 | Engaging of water tanker for supplying water to lawn and trees, and other asscciated works as on when required basis including hiring charges, Mobilization charges, fuel, driver, delivery hose pipe of sufficient length, Tools & tackles etc., all in complete as directed by EIC.
Note: The water tanker is to be filled within ZC. The water will be supplied free of cost. | 2,000 | Hrs. | - | - |
| 4 | Engaging of tractor rotavator for carrying out the removal of wild vegetation , wild grass & bushes, area development, land leveling & etc., by mechanical means in as on when required basis including hiring charges, mobilization charges, driver, fuel, tools and tackles etc., all in complete as directed by the Engineer in charge. | 3,000 | Hrs. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Biddocument5TECHFORMSATOH.xls
Tender Documents • 0.08 MB
FinancialBidDocument.pdf
Tender Documents • 0.69 MB
Bidderdeclaration.pdf
Tender Documents • 0.40 MB
GCCSCC.pdf
Tender Documents • 1.20 MB
Biddocument7_AERBControlofWorks.pdf
Tender Documents • 0.27 MB
BOQ_964807.xls
BOQ • 0.40 MB
Corrigendum_1.pdf
PDF • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .