| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.7 Laccepted-aoc | ₹7.7 L | accepted-aoc |
Tender Value
₹8.4 L
EMD Value
₹10,545
Closing Date
20 Aug 2026, 11:00 pmClosed
Rural Development and Panchayat Raj Department
EE PRED BAGALKOTE
CONSTRUCTION OF BHEERALINGESHWARA TEMPLE SAMUDAYA BHAVAN AT TALAGIHAL VILLAGE OF BAGALKOT TALUK
RDPR/2026-27/BD/WORK_INDENT27572
RDPR/2026-27/BD/WORK_INDENT27572
Reserved
Buildings
Electronic Documents, First(One Cover)
RDPR Division Office Bagalakote
₹500
₹10,545
20 Aug 2026
5 Aug 2026
19 Aug 2026
CONSTRUCTION OF BHEERALINGESHWARA TEMPLE SAMUDAYA BHAVAN AT TALAGIHAL VILLAGE OF BAGALKOT TALUK
Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels , key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and ...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Providing and laying in position Cement Concrete for all Foundation works. The granite / trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with su...
Centering and shuttering for RCC Columns / Shaft (Slip Centering) according to the Table For Finished rate of Concrete Column footing 8 %
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m eight. The granite/trap...
Centering and shuttering for RCC Columns / Shaft (Slip Centering) according to the Table For Finished rate of Concrete For Column 70%
Centering and shuttering for Plinth Beams of Buildings according to the Table For Finished rate of Concrete For Plinth beam 50%
Centering and shuttering for RCC Beams, Lintels of Buildings according to the Table For Finished rate of Concrete For beam&Lintle 60%
Centering and shuttering for RCC Beams, Lintels of Buildings according to the Table For Finished rate of Concrete For slab50%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) inc...
Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, includi...
Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of m...
Providing and laying Cement concrete pavement with 1:2:4 for commercial & residential building floors, hardpaths, footpaths using 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size...
Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all col...
Fixing of window frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size gra...
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel...
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in cluding water thinnable priming coat with cement primer after t...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW-1 27572 SC.docx
Tender Document • 1.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .