| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 LAccepted-AOC B 56 LANE NO 4A SECTOR 7 VASHNAVI ENCLAVE CHANNI HIMAT JAMMU 180015 | JAMMU | JAMMU AND KASHMIR | 180015 | L1 | Accepted-AOC AOC | |
| 2 | L2₹27.8 L+₹2.3 L (9.03%)Rejected-Finance R O WARD NO 08 H NO 108 DHAR ROAD UDHAMPUR TEHSIL DISTT UDHAMPUR 182101 | UDHAMPUR | UDHAMPUR | JAMMU KASHMIR | 182101 | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹27.8 L+₹2.4 L (9.23%)Rejected-Finance WARD NO 1 HOUSE NO 04 SUBASH NAGAR UDHAMPUR 182101 J K | UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L3 | Rejected-Finance BEING L3 | |
| 4 | L4₹28.9 L+₹3.4 L (13.4%)Rejected-Finance | L4 | Rejected-Finance BEING L4 | |
| 5 | L5₹32.9 L+₹7.4 L (29.2%)Rejected-Finance | L5 | Rejected-Finance BEING L5 |
| Sl No | Description | Qty | Unit | MOHAN LAL AND SONS L7 | slathia construction works L2 | DAVINDER SINGH L3 | ASIA BUILDER L8 | KARAN TRADERS L4 | ANIKET TRADERS L1 | PAWAN KUMAR GOVT. CONTRACTORS L5 | PROACH ASSOCIATES BUILDERS & ENGINEERS L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in any type of soft / hard soil, not exceeding 1.5m wide and not exceeding 1.5m in depth for foundation / laying of pipes and getting out. | 426 | Cum | 70 ₹29,820 | 75 ₹31,950 | 90 ₹38,340 | 50 ₹21,300 Lowest | 90 ₹38,340 | 180 ₹76,680 | 80 ₹34,080 | 110 ₹46,860 |
| 2.00 | Returning, filling in any type of soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm. | 227 | Cum | 10 ₹2,270 Lowest | 10 ₹2,270 Lowest | 10 ₹2,270 Lowest | 30 ₹6,810 | 10 ₹2,270 Lowest | 55 ₹12,485 | 20 ₹4,540 | 20 ₹4,540 |
| 3.00 | Removing excavated material (soils) not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point. | 199 | Cum | 10 ₹1,990 Lowest | 10 ₹1,990 Lowest | 10 ₹1,990 Lowest | 10 ₹1,990 Lowest | 10 ₹1,990 Lowest | 55 ₹10,945 | 20 ₹3,980 | 20 ₹3,980 |
| 4.00 | M & L for Sand cushioning for appropiate level before and after laying the cable of trenches for protection of cables including punning down complete all as specified.
Note :- Thickness of sand cushioning shall be the thickness after punning down. | 165 | Cum | 300 ₹49,500 | 275 ₹45,375 | 400 ₹66,000 | 400 ₹66,000 | 220 ₹36,300 | 100 ₹16,500 Lowest | 300 ₹49,500 | 450 ₹74,250 |
| 5.00 | Supply and fixing of Brick tiles; common burnt clay building /ducts bricks’ sub-class `B’ Designation 75 (230mmx115mmx75mm) | 12 | Per 1000 Nos | 5,000 ₹60,000 | 4,000 ₹48,000 | 4,000 ₹48,000 | 8,000 ₹96,000 | 4,000 ₹48,000 | 1,000 ₹12,000 Lowest | 6,200 ₹74,400 | 5,500 ₹66,000 |
| 6.00 | S&F in repairs 80 mm dia GI tubing,light grade,for protection of cable passing across the road,under floor etc,complete all as specified and directed by Engr-in-Charge. | 40 | RM | 200 ₹8,000 Lowest | 300 ₹12,000 | 400 ₹16,000 | 200 ₹8,000 Lowest | 350 ₹14,000 | 400 ₹16,000 | 450 ₹18,000 | 490 ₹19,600 |
| 7.00 | S&F in repairs 50 mm dia GI tubing,light grade,for protection of cable passing across the road,under floor etc,complete all as specified and directed by Engr-in-Charge. | 40 | RM | 120 ₹4,800 Lowest | 250 ₹10,000 | 250 ₹10,000 | 200 ₹8,000 | 300 ₹12,000 | 300 ₹12,000 | 375 ₹15,000 | 290 ₹11,600 |
| 8.00 | M & L for road cutting incl necessary excavation 30 cm wide and 30 cm in depth as in trenches in any type of soils/rock for laying LT UG cable through pipe after laying /through the cable trenches will be filling top with M&L PCC 1:3:6 type C-1 using 20 mm grdaeds stone aggregates from top over 15 cm thick hard good of broken boulders , 63 mm gauge over 15 cm bolders 100 mm dia over filled and rammed earth to make good the disburbed surface etc complete all as specified and directed. | 80 | RM | 80 ₹6,400 | 10 ₹800 Lowest | 120 ₹9,600 | 100 ₹8,000 | 100 ₹8,000 | 100 ₹8,000 | 300 ₹24,000 | 550 ₹44,000 |
| 9.00Supply and Laying in repair/replacement Cable XLPE insulated screened PVC bedded galvanized steel strips or wire armoured, cables (heavy duty) ISI marked with stranded aluminium conductor, 1100 volts grade and connecting and testing in trenches, under floors/ roads or on walls complete including taking down old complete all as specified and directed by Engr-in-Charge of following sizes :- Note Earth work, excavation shall be measured & paid separately under respective item of Schedule and wherever cable laying on walls and uses of thimbles, Clamps, fastner,nut,bolt and washers etc rates shall deemed to be included in the quoted rates). Make- KEI/ Havells/ Plycab | |||||||||||
| 9.01 | Cable size 10 sqmm 4 core | 650 | RM | 120 ₹78,000 | 140 ₹91,000 | 100 ₹65,000 | 250 ₹1,62,500 | 100 ₹65,000 | 80 ₹52,000 Lowest | 112 ₹72,800 | 145 ₹94,250 |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
24 Oct 2025, 6:00 pmClosed
GE AF UDHAMPUR
AF STATION UDHAMPUR
REPAIR / MAINT OF UNSV LT CABLE, RE-ROUTING, RE-FIXING OF CABLE, DWC PIPE, STRAIGHT THROUGH JOINT, CABLE JOINT KIT ALONGWITH MISC E/M WORK AT 39 WING AIR FORCE STATION UDHAMPUR
2025_MES_732780_1
GEAFU-52/2025-26
Open Tender
Civil Works
Works
180 days
AF STATION UDHAMPUR
REPAIR / MAINT OF UNSV LT CABLE, RE-ROUTING, RE-FIXING OF CABLE, DWC PIPE, STRAIGHT THROUGH JOINT, CABLE JOINT KIT ALONGWITH MISC E/M WORK AT 39 WING AIR FORCE STATION UDHAMPUR
8 documents required · 8 mandatory
₹500
GE AF UDHAMPUR
₹80,000
17 Nov 2025
26 Sept 2025
27 Oct 2025
26 Sept 2025
24 Oct 2025
10 Oct 2025
26 Sept 2025 - 3 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TENDER52.pdf
Tender Documents • 1.48 MB
BOQ_820450.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .