Loading…
Loading…
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
8 Nov 2023, 3:00 pmClosed
Block Development officer
Thirumangalam
Madurai District Construction of 100000 Litre capacity 12m Stagging Height To Checkkanoorani Village And A.Kokkulam PanchayatVillage and Panchayat Thirumangalam Block MVS 2022-2023
2023_RDTN_386068_1
12/TMM/JJM MVS/22-23
Open Tender
Civil Construction Goods
Works
120 days
Thirumangalam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,000
Yes
8 Nov 2023
6 Nov 2023
8 Nov 2023
6 Nov 2023
8 Nov 2023
6 Nov 2023
Amount
Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with sma
Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with sma
Supplying and filling with good river sand from approved quarry layers not more than 15 cm including cost and conveyance of all materials and all labour charges for filling, watering & consolidation etc., complete as per standard specification 24 &25 NBC
Plain Cement Concrete 1:4:8 mix, (one part of cement, four part of sand and eight part of aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting an
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supply and erection of steel centering, shuttering for soffits and sides including necessary support strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3mm for boarding laid over Silver Oak joists o
Steel centering for 0 to 3.30 m (Plane surface)
Steel centering plane surface 3.30 m to 4.30m
Steel centering plane surface 6.30 m to 7.30m
Steel centering plane surface 11.30 m to 12.30m
Steel centering square column 0 m to 3.30m
Steel centering square column 3.30 m to 4.30m
Steel centering square column 4.30 m to 5.30m
Steel centering square column 5.30 m to 6.30m
Steel centering square column 6.30 m to 7.30m
Steel centering square column 7.30 m to 8.30m
Steel centering square column 8.30 m to 9.30m
Steel centering square column 9.30 m to 10.30m
Steel centering square column 10.30 m to 11.30m
Steel centering square column 11.30 m to 12.30m
Steel centering square column 12.30 m to 13.30m
Steel centering square column 13.30 m to 14.30m
Steel centering square column 14.30 m to 15.30m
Steel centering up to I LL Curved surface 0 m to 3.30m
Steel centering Round column 0 m to 3.30m
Steel centering Round column 3.30 m to 4.30m
Steel centering Round column 4.30 m to 5.30m
Steel centering Round column 5.30 m to 6.30m
Steel centering Round column 6.30 m to 7.30m
Steel centering Round column 7.30 m to 8.30m
Steel centering Round column 8.30 m to 9.30m
Steel centering Round column 9.30 m to 10.30m
Steel centering Round column 10.30 m to 11.30m
Steel centering Round column 11.30 m to 12.30m
Steel centering Round column 12.30 m to 13.30m
Steel centering Round column 13.30 m to 14.30m
Steel centering Round column 14.30 m to 15.30m
Steel centering Round column 15.30 m to 16.30m
Steel centering Round column 16.30 m to 17.30m
Steel centering Round column 17.30 m to 18.30m
Supply and fabrication of steel using TMT rods for all Reinforced cement concrete works including cost and conveyance of all materials and all labour charges for cutting, bending and placing the rod in position and tying up the rods with binding wire an
Painting two coats with Emulsion paint of approved colour and quality including cost and conveyance of all materials and labour charges and other incidental charges to site etc., complete. as per standard specification
Refilling the foundation with excavated soil (other than sand) including cost and conveyance of all materials and labour charges to siteand other incidental charges etc., complete as per standard specification
Providing and fixing of RCC Hand rails in position of approved design for one metre height including cost and conveyance of all materials and labour charges to site etc., complete
Supply of following Heavy duty G.I. Pipe and specials conforming to IS 1239/Part I/90 of approved make including cost and conveyance of all materials and labour charges and other incidental charges to site etc., complete. as per standard specificatio
1) 80mm GI Pipe (Heavy duty)
2) 80mm GI Coupling (Heavy duty)
3) 80 mm GI Elbow (Heavy duty)
4) 80 mm GM Gate Valve (Heavy duty)
5) 80 mm GI Union (Heavy duty)
6) 80 mm GI H Nipple (Heavy duty)
7) 100 mm GI Pipe (Heavy duty)
8) 100 mm GI Coupling (Heavy duty)
9) 100 mm GI Elbow (Heavy duty)
10) 100 mm GM Gate Valve (Heavy duty)
11) 100 mm GI Union (Heavy duty)
12) 100 mm GI H Nipple (Heavy duty)
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear widemade out of 50 mm x 50mm x 6mm MS angle for both sides and for steps at 30cm C/C welded jointed etc ., for I staging from GL to 1st level brace (weight4.5kg/m) IInd and IIIrd staging upto floor slab and IVth staging from floor slabto roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand railsfrom I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. atGround Level- 1No. and above Ground Level - 4Nos. Supply and fixing of 32mmGI pipe medium for hand rails for the Landing slab. Supplying and fixing of MSBase plate of 100mm X 100mm X 6mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing slab and MS Ladder providing lockingarrangements with two coats of approved enamel paint over one coat of redoxide paint as per approved Type Design and as directed by TWAD board officers.
Supply and delivery of the following PVC / GI pipes and specials
50 mm GI Pipe
50mm GI Coupling
50mm GI Elbow
50mm GI Bend
50mm GI Union
50 mm GM Gate valve
50mm GI Hex Nipple
20mm GI Pipe
20mm GI Coupling
20mm GI Elbow
63mm dia PVC Pipe
63mm dia PVC Tee
63mm dia PVC Elbow
63mm dia PVC MTA
Supply of following Heavy duty G.I. Pipe and specials conforming to IS 1239/Part I/90 of approved make including cost and conveyance of all materials and labour charges and other incidental charges to site etc., complete. as per standard specificatio
50 mm GI Pipe
20 mm GI Pipe
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 A for Surface Dressing etc complete (For PVC Pipe line)
Refilling excavated earth including all labour charges etc.,
Labourcharges for laying of GI Pipe in all labour charges etc,.
Labourcharges for laying of PVC Pipe in all labour charges etc,.
Provision for Name bord Chages & Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MAYANDI M
stage.html
html • 0.02 MB
finance_460111.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .