| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹225.0 CrAccepted-Finance PLOT NO 452 UDYOG VIHAR PHASE V NEAR GPO GURUGRAM BEHIND ENKAY TOWER GURUGRAM HARYANA 122016 | GURUGRAM | GURUGRAM | HARYANA | 122016 | ₹225.0 Cr | L1 | Accepted-Finance 1st lowest bidder |
| 2 | L2₹225.1 CrRejected-Finance | ₹225.1 Cr | L2 | Rejected-Finance 2nd lowest bidder |
| 3 | L3₹246.2 CrRejected-Finance | ₹246.2 Cr | L3 | Rejected-Finance 3rd lowest bidder |
| 4 | L4₹258.0 CrRejected-Finance 19 PARKDRIVE MALIBU TOWN SECTOR 47 SOHNA ROAD GURGAON HARYANA 122001 | GURGAON | GURGAON | HARYANA | 122001 | ₹258.0 Cr | L4 | Rejected-Finance 4th lowest bidder |
| 5 | L5₹268.3 CrRejected-Finance | ₹268.3 Cr | L5 | Rejected-Finance 5th lowest bidder |
| Sl No | Description | Qty | Unit | gawar construction limited L4 | CEIGALL INDIA LIMITED L1 | Brij Gopal Construction Company Pvt. Ltd. L2 | VRC Constructions (India) Limited L5 | SHIVALAYA CONSTRUCTION PVT LTD L3 | LCC Projects Limited L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in hilly/plain area in all heights and depths and in all kind of soil by mannual/ mechanical means including saturated soil comprising of ordinary soil, soft rock, hard rock, chieselling, wedging out of rock (where blasting is prohibitted) and their intermediate classification of soil,setting out true to the required lines, grades, width cutting and trimming of side slopes and level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification clause 1603.1 and sorting of useful materials and stacking the same in all leads and lifts and transportation of un useful material for filling in Industrial area, road ways, camber, embankments for grade improvements and disposal of all un-useful material to required width of the road or on dumping sites as managed by Contractor himself through all modes of transportation including head load or animal transport or mechanical means along with its levelling, fine dressing , Grading with grader, Rolling, watering, Compaction, and carriage of machineries, materials, tools, equipments and safety measures and incidentals necessary to complete the work by mechanical means and or /labour if required. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per the direction of Engineer- in- charge including carriage of material with in all leads and lifts. The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. The contractor will have to arrange the safe dumping site for dumping of surplus excavated material on his own in all leads and lifts. Recovery at the rate of Rs. 300/- (Rupees Three Hundred) per cubic metre shall be effected from the bills for the 3% of the quantity actually measured. The rates quoted for excavation are deemed to include the charges for the clearance of jungle, shurbs, bushes, trees etc. | 2,01,80,014.6 | Per cubic metre | 81 ₹163.5 Cr | 67 ₹135.2 Cr | 48.15 ₹97.2 Cr | 83 ₹167.5 Cr | 69 ₹139.2 Cr | 106 ₹213.9 Cr |
| 2.00 | Construction of sub grade and earthen shoulder/camber with approved materials obtained from borrow pits within all leads and lifts,transporting to site,spreading grading to required slope and compacted to meet requirement of table 300.2 as per MORD technical speficiations clause 303.1 including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including octroi,royality, Malkana toll tax ,sale tax,GST or other taxes imposed by the Goverment. | 2,31,165 | per square metre | 14 ₹32.4 L | 10.1 ₹23.3 L | 100 ₹2.3 Cr | 62 ₹1.4 Cr | 13 ₹30.1 L | 300 ₹6.9 Cr |
| 3.00 | Cosolidation of sub grade and earthen shoulder including camber etcetra with approved materials obtained from borrow pits within all leads and lifts,transporting to site,spreading grading to required slope and compacted to meet requirement of table 300.2 as per MORD technical speficiations clause 303.1 including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment. | 2,31,165 | per square metre | 14 ₹32.4 L | 10 ₹23.1 L | 100 ₹2.3 Cr | 62 ₹1.4 Cr | 13 ₹30.1 L | 16 ₹37.0 L |
| 4.00 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down as per MoRTH specifications clause section 1200 & clause 710.1.4 of IRC 78 including rolling watering, laying in uniform layers with paver in drainage layer on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per drawing and Technical Specification.including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment. | 57,791.25 | Per cubic metre | 925 ₹5.3 Cr | 820 ₹4.7 Cr | 1,793 ₹10.4 Cr | 827 ₹4.8 Cr | 1,196 ₹6.9 Cr | 1,588 ₹9.2 Cr |
| 5.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Specification Clause 401.including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment. | 46,233 | Per cubic metre | 1,250 ₹5.8 Cr | 800 ₹3.7 Cr | 2,226 ₹10.3 Cr | 1,334 ₹6.2 Cr | 1,290 ₹6.0 Cr | 2,000 ₹9.2 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and MORTH Technical Specification Clause 406.including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment. | 57,791.25 | Per cubic metre | 1,350 ₹7.8 Cr | 1,300 ₹7.5 Cr | 2,377 ₹13.7 Cr | 1,619 ₹9.4 Cr | 1,500 ₹8.7 Cr | 2,500 ₹14.4 Cr |
| 7.00 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0(zero point seven to one point zero )kilogramme per squaremetre using mechanical means as per MORTH Technical Specification Clause 502.including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment. | 2,31,165 | per square metre | 30 ₹69.3 L | 35 ₹80.9 L | 50 ₹1.2 Cr | 42 ₹97.1 L | 48 ₹1.1 Cr | 120 ₹2.8 Cr |
| 8.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 (zero point two five to zero point three zero) kilogramme per square metre on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per MORTH Technical Specification Clause 503 including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment. | 4,62,330 | per square metre | 13 ₹60.1 L | 15 ₹69.3 L | 15 ₹69.3 L | 15 ₹69.3 L | 24 ₹1.1 Cr | 50 ₹2.3 Cr |
| 9.00 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 (Seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder at the rate of 4.0 to 4.5 (four point zero to four point five zero) per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment. | 18,493.2 | Per cubic metre | 9,500 ₹17.6 Cr | 9,000 ₹16.6 Cr | 9,858 ₹18.2 Cr | 9,563 ₹17.7 Cr | 10,180 ₹18.8 Cr | 13,000 ₹24.0 Cr |
| 10.00 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 (seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder at the rate of 5.4 to 5.6 ( five point four to five point six ) per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment. | 9,246.6 | Per cubic metre | 10,500 ₹9.7 Cr | 10,500 ₹9.7 Cr | 12,055 ₹11.1 Cr | 11,239 ₹10.4 Cr | 12,900 ₹11.9 Cr | 13,000 ₹12.0 Cr |
Tender Value
₹287.6 Cr
EMD Value
₹3.0 Cr
Closing Date
30 May 2025, 5:00 pmClosed
Executive Engineer
HPSIDC Shimla
Formation cutting, c/o internal roads, storm water drains, bridge and boundary fencing PH-I.
2025_SIDC_103997_1
Job No. 1
Open Tender
Civil Works
540 days
Una
Please refer Tender documents.
19 documents required · 19 mandatory
₹47,200
₹3.0 Cr
19 Aug 2025
19 Apr 2025
31 May 2025
19 Apr 2025
30 May 2025
19 Apr 2025
Amount
Excavation in hilly/plain area in all heights and depths and in all kind of soil by mannual/ mechanical means including saturated soil comprising of ordinary soil, soft rock, hard rock, chieselling, wedging out of rock (where blasting is prohibitted) and their intermediate classification of soil,setting out true to the required lines, grades, width cutting and trimming of side slopes and level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification clause 1603.1 and sorting of useful materials and stacking the same in all leads and lifts and transportation of un useful material for filling in Industrial area, road ways, camber, embankments for grade improvements and disposal of all un-useful material to required width of the road or on dumping sites as managed by Contractor himself through all modes of transportation including head load or animal transport or mechanical means along with its levelling, fine dressing , Grading with grader, Rolling, watering, Compaction, and carriage of machineries, materials, tools, equipments and safety measures and incidentals necessary to complete the work by mechanical means and or /labour if required. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per the direction of Engineer- in- charge including carriage of material with in all leads and lifts. The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. The contractor will have to arrange the safe dumping site for dumping of surplus excavated material on his own in all leads and lifts. Recovery at the rate of Rs. 300/- (Rupees Three Hundred) per cubic metre shall be effected from the bills for the 3% of the quantity actually measured. The rates quoted for excavation are deemed to include the charges for the clearance of jungle, shurbs, bushes, trees etc.
Construction of sub grade and earthen shoulder/camber with approved materials obtained from borrow pits within all leads and lifts,transporting to site,spreading grading to required slope and compacted to meet requirement of table 300.2 as per MORD technical speficiations clause 303.1 including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including octroi,royality, Malkana toll tax ,sale tax,GST or other taxes imposed by the Goverment.
Cosolidation of sub grade and earthen shoulder including camber etcetra with approved materials obtained from borrow pits within all leads and lifts,transporting to site,spreading grading to required slope and compacted to meet requirement of table 300.2 as per MORD technical speficiations clause 303.1 including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down as per MoRTH specifications clause section 1200 & clause 710.1.4 of IRC 78 including rolling watering, laying in uniform layers with paver in drainage layer on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per drawing and Technical Specification.including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Specification Clause 401.including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and MORTH Technical Specification Clause 406.including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0(zero point seven to one point zero )kilogramme per squaremetre using mechanical means as per MORTH Technical Specification Clause 502.including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 (zero point two five to zero point three zero) kilogramme per square metre on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per MORTH Technical Specification Clause 503 including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 (Seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder at the rate of 4.0 to 4.5 (four point zero to four point five zero) per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 (seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder at the rate of 5.4 to 5.6 ( five point four to five point six ) per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Construction of cement concrete kerb with top and bottom width 115 ( one hundred fifteen ) and 165 (one hundred sixty five) millimetre respectively, 250 (two hundred fifty)millimetre high in M 20 (M-tewnty) grade PCC on M-10 (M-ten) grade foundation 150 (one hundred fifty ) millimetre thick, foundation having 50 (fifty) millimetre projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, including form work all complete as per MORTH Technical specifications clause 408 including hauling of materials in all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing and laying of hot applied thermoplastic compound 2.5 ( two point five) millimetre thick including reflectorising glass beads at the rate of 250 (two hundred fifty)grams per square metre area, thickness of 2.5 (two point five) millimetre exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes including all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
C/o strom water drains, culverts, Retaining wall/ Brest walls/ protection work and fencing : Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lead and lift as per MORD Technical specification on dumping site as managed by the contractor himself through all modes of transportation including head load or animal transport or mechanical means along with its levelling and fine dressing, grading with garder, roller, watering, compaction and carriage of machineries, materials, tools, equipments and safety measures and including all nessecisty to complete the work by mechanical means or manual means where required.Any loss to the public/ private property during the course of execution shall be absolute responsibility of the contractor which shall have to dully compensated by him in all cases as per direction of Engineer-in-charge. ncluding all leads,lifts and other incidentials or as per the entire satisfaction and directions of Engineer-in-charge.The rate including all octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing and laying mechanically mixed and vibrated plain cement concrete in foundation for all type of structure complete of plain concrete nominal mix 1:4:8 (one cement isto four sand isto eight graded stone agreegate 40 mm (forty millimetre) nominal size) in or under water and curing complete and including pumping or bailing out water,dewatering,removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work complete in all respect as per drawing and MORTH technical specification clause 802,803,1202,1203 and as per the direction of the engineer-in-charge The rate including octroi,royality, Malkana toll tax ,sale tax, GST or other taxes imposed by the Goverment.
Providing and laying mechanically mixed concrete for plain/reinforced concrete in sub structure for all type of structure complete of plain cement concrete M-15(M-fifteen) grade nominal size nominal mix 1:2½:5 (one cement: two & half sand: five graded crushed/broken stone aggregate 40mm (forty miilimetre) nomianl size) in or under water and curing complete including pumpingor bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and MORTH technical specifications clause 1700 and 2700 and as per the direction of the Engineer-in-charge.Including carriage of materials within all leads lifts and other incidential . The rate including octroi,royality,Malkana,Tol tax,sale tax , GSTor other taex imposed by the Government.
Providing and laying mechanically mixed and vibrated reinforced cement concrete in super structure as pe drawing and MORTH technical specification clause 1500,1700 and 2300 RCC grade M-25( Twenty five) nominal size 1:1½:3( One cement isto one and half sand: three graded crushed stone aggregate) 20mm (twenty millimetre) nominal size} mix design to obtained the minimum compresive strength of grade M-25(Twenty five) and curing complete including cost of form work but excluding the cost of reinforcement for reinforced concrete work in kerbs,string courses,bed plates,anchor blocks etcetra including carriage of materials within all leads andlifts and other incidental. The rate including octroi,royality,Malkana,toll tax,sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated reinforced cement concrete noninal mix 1:1:2 ( one cement:one sand: two graded crushed stone aggregate 20mm(twenty millimetre) nominal size mix design to obtain the minimum compressive strength of grade M-30 ( Thirty) in superstructure as per drawing and MORTH technical specification for Rural Road Clause 1500,1700 and 2100 in wearing coat upto any floor including the cost of form work,curing TMT bar reinforcement and hauling of materials in all kinds of leads,lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-charge. The rate including ectroi,royality,Malkana,toll tax sale tax,GST or other taxes imposed by the Government.
Supplying fitting and placing HYSD bar reinforcement (Fe-415) in substructure complete as per drawing and MORTH technical specifications clause 1600 and 2200 including cutting ,bending ,binding and placing in position complete in all respect including cost of binding wire upto any floor level as per the directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidental. The rate including ectroi,royality,Malkana,toll tax sale tax ,GST or other taxes imposed by the Government.
Providing and laying 40 (forty) millimetre thick heavy duty precast cement conrete inter locking paver blocks vibro compacted upto M-30 (M-thirty) grade including border or kurb block grey or coloured over sub-base of concrete with 25 (twenty five )millimetre thick average thickness of cement mortar 1:4 (1 cement : 4 sand) laid over and jointed with neat cement slurry mixed with pigment to match the shade of blocks i/c curing rubbing & polishing complete (Sub base concrete floor to be paid for separately) as per the directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidental. The rate including ectroi, royality, Malkana, toll tax sale tax ,GST or other taxes imposed by the Government.
Reinforced Cement Concrete Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 (six) millimetre bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately) as per the directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidental. The rate including ectroi,royality,Malkana,toll tax sale tax ,GST or other taxes imposed by the Government.as per the directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidental.
Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundation for all type of structure complete of plain cement concrete grade M-15(M-fifteen) nominal mix 1;3:6 ( one cement: three sand: six graded crushed stone aggregate 40mm (forty millimetre) nominal size in or binder water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths excluding the cost of form work as per drawing and MORTH technical specification clause-1500,1700 & 2100 as per the direction of the Engineer-in-charge including carriage of material within all leads and lifts and other incidential. The rate including of octroi,royality,Malkana,Tol Tax,sale tax,GST or other taxes imposed by the Government.
Fencing with reinforced cement concrete Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 (six)millimetre bar nibs placed at 3.0 (three) metre distance, embedded in cement concrete blocks, every 15th (fifteen) post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 (nine point thee eight ) kilogrammes per 100 (hundred) metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 (six) millimetre bar nibs fixed while casting the post ( earth work and concrete to be paid for separately) :Payment to be made per metre cost of total length of barbed wire used.as per the directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidental. The rate including ectroi,royality,Malkana,toll tax sale tax ,GST or other taxes imposed by the Government.
Providing and laying 100mm(Hundred millimetre) dia PVC pipe weep holes in brick masonry/stone masonry ,plain/reinforced concrete abutment,wing wall,return wall and retaining /breast walls extending through the full width of the structure with slope of 1(V):20(H) towards drainage face complete as per drawing and MORTH technical specifications clause2706 and as per direction of Engineer-in-charge including carriage of materials witin all leads and lifts and other incidental The rate including ectroi,royality,Malkana,toll tax sale tax, GST or other taxes imposed by the Government .
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications clause 710.1.4 of IRC 78 and section 1200 to a thickness of not less than 600 (six hundred) millimetre with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.as per direction of Engineer-in-charge including carriage of materials witin all leads and lifts and other incidental The rate including ectroi,royality,Malkana,toll tax sale tax, GST or other taxes imposed by the Government .
C/o Bridge, Bridge approach and protection work: Construction of 30 mtr long Bridge (6 Lane) with Carriage way of 3.75 mtr each over khad at R/D 1/500 as per parameter specified in Drg. No CIC/2020/GAD/1 i.e. clear carriage way of 11.25 metre each side IRC class-A/70-R loading. The construction including sub structure P/F of bearing, superstructure, kerbs, railing, drainage spouts, dirt wall and other ancillary work/ allied work complete in all respect confirming to all IRC /IS-codes etcetra. The work will include soil investigation at both the abutments and pier position getting GAD/working drawingd acordingly submitting detail design of the same dully checked by proof consultant of NIT Hamirpur / PEC Chandigarh & other Govt. institutes and execution of the bridge as per MORTH specification including carriage of material through all mode transportation within all leads lifts and other incidentials. The rates are inclusive octroi, royality, Malkhana, Toll tex, GST & other taxes imposed by the Government.
Excavation in hilly area in all heights and depths and in all kind of soil by mannual/mechanical means including saturated soil comprising of ordinary soil,soft rock,hard rock chiselling,wedging out of rock(where blasting is prohibited) and their intermediate classification of soild setting out true to the required lines grades width cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-Charge at site according to the MORD technical specification clause 302,1603 and 1603.2 and sorting out useful materials and stacking the same in all leads and lifts in acquired width of road and transporation of unuseful material for filling in road wyas camber,embankments for grade improvements and disposal of all material to required width of the road or on approved dumping site through all modes of transporation including head load or animal transport or mechanical means alongwith its levelling fine dressing and carriage of machineries ,materials, tolls,equipments and safety measures and incidentials necessary to complete the work by mechanical means as per direction of Engineer-in-charge including carriage of materials witin all leads and lifts and other incidental. The rate including octroi,royality,Malkana,toll tax sale tax, GST or other taxes imposed by the Government .
Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundation for all type of structure complete of plain cement concrete grade M-15(M-fifteen) nominal mix 1;3:6 ( one cement: three sand: six graded crushed stone aggregate 40mm (forty millimetre) nominal size in or binder water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths excluding the cost of form work as per drawing and MORTH technical specification clause-1500,1700 & 2100 as per the direction of the Engineer-in-charge including carriage of material within all leads and lifts and other incidential. The rate including of octroi,royality,Malkana,Tol Tax,sale tax,GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated reinforced cement concrete in super structure as pe drawing and MORTH technical specification clause 1500,1700 and 2300 RCC grade M-25( Twenty five) nominal size 1:1½:3( One cement isto one and half sand: three graded crushed stone aggregate) 20mm (twenty millimetre) nominal size} mix design to obtained the minimum compresive strength of grade M-25(Twenty five) and curing complete including cost of form work but excluding the cost of reinforcement for reinforced concrete work in kerbs,string courses,bed plates,anchor blocks etcetra including carriage of materials within all leads andlifts and other incidental. The rate including octroi,royality,Malkana,toll tax,sale tax, GST or other taxes imposed by the Government.
Supplying fitting and placing HYSD bar reinforcement (Fe-415) in substructure complete as per drawing and MORTH technical specifications clause 1600 and 2200 including cutting ,bending ,binding and placing in position complete in all respect including cost of binding wire upto any floor level as per the directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidental. The rate including ectroi,royality,Malkana,toll tax sale tax ,GST or other taxes imposed by the Government.
Providing and laying 100mm(Hundred millimetre) dia PVC pipe weep holes in brick masonry/stone masonry ,plain/reinforced concrete abutment,wing wall,return wall and retaining /breast walls extending through the full width of the structure with slope of 1(V):20(H) towards drainage face complete as per drawing and MORTH technical specifications clause2706 and as per direction of Engineer-in-charge including carriage of materials witin all leads and lifts and other incidental The rate including ectroi,royality,Malkana,toll tax sale tax, GST or other taxes imposed by the Government .
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications clause 710.1.4 of IRC 78 and section 1200 to a thickness of not less than 600 (six hundred) millimetre with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.as per direction of Engineer-in-charge including carriage of materials witin all leads and lifts and other incidental The rate including ectroi,royality,Malkana,toll tax sale tax, GST or other taxes imposed by the Government .
Brij Gopal Construction Company Pvt. Ltd. (BID ID -520646)
SHIVALAYA CONSTRUCTION PVT LTD (BID ID -520726)
gawar construction limited (BID ID -517047)
VRC Constructions (India) Limited (BID ID -520256)
LCC Projects Limited (BID ID -520682)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid