Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VILLAGE P O DANSA TEHSIL RAMPUR DISTT SHIMLA H P | RAMPUR | SHIMLA | HIMACHAL PRADESH | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.6 L
EMD Value
₹19,262
Closing Date
1 Sept 2022, 5:00 pmClosed
Executive Engineer
JSD Rampur
AR AND MO Sewerage Scheme Rampur Town Tehsil Rampur Distt. Shimla HP
2022_HPIPH_63852_1
EE-JSD-RMP-E-TEN/22-5620-70 DT. 20.8.22
Open Tender
Civil Works
Item Rate
90 days
Kalyanpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹400
EE Rampur
₹19,262
Yes
19 May 2023
26 Aug 2022
2 Sept 2022
26 Aug 2022
1 Sept 2022
26 Aug 2022
Amount
Demolition of stone masonary below ground G.L. upto 1.50 mtr. Depth and disposal of unserviceable material within 20 meteres lead complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge.
Demolition above ground G.L. upto upto floor two level disposal of unserviceable material within 20 meteres lead and including imparting of & cutting the necessary reinforcement and separating out from RCC/ RB works complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge.
Cutting in earth work in all classification of earth work such as pick work, jumper work, saturated soil, blasting soft/ hard rock or chiselling soft/ hard rock where blasting is prohibited in all lifts including trimming and dressing of sides levelling of beds to correct grades including shoring, strutting, planking, timbering where ever required, stacking the serviceable/ unserviceable materials/soil separately complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge.
Excavation in foundation trenches etc.(for pipes & pits upto all depth) in earth work in all classification of earth work such as pick work, jumper work, saturated soil , blasting soft/hard rock or chiselling soft/ hard rock including wedging out of a rock where blasting is prohibited in all lifts including trimming and dressing of sides levelling of beds to correct grades including shoring, strutting, planking, timbering and dewatering where ever required, stacking the serviceable/unserviceable materials/soil separately and after laying and jointing of pipes, returning the usable soil in trenches in 15 CM layers including consolidation of each deposited layers by ramming and watering and then dispositng of all surplus excavated soil, useable materials as directed within all leads/lifts including restoration of metalled surfaces to its original condition and including cost of diversion for traffic night signals, fixing caution boards, crossing over trenches for access to houses fencing etc. complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge.
Providing and laying cement concrete 1:6:12 ( 1 cement : 6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads & lifts and as per the direction & to the entire satisfaction of the Engineer-in-Charge.
Providing and laying cement concrete 1:5:10 ( 1 cement : 5 sand : 10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads & lifts and as per the direction & to the entire satisfaction of the Engineer-in-Charge.
Prov.and laying cement concrete 1:4:8(1Cement: 4Sand: 8Graded stone agg.40mm nominal size) & curing complete excluding cost of form work in foundation and plinth complete.
Providing and laying cement concrete 1 : 1.5 :3 (1 cement :1.5 sand :3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcemnt for reinforced concrete work
foundation and Plinth
Walls (any thickness but not less than 0.10 metre thickness) including attached pilasters buttersses, plinth and string courses etc. from top of foundation upto floor two level
Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work complete as per direction & to the entire satisfaction of the Engineer-in-Charge. in :-
In suspended floor roofs ,landing and shelves and their support.balconies , beams,girders, bressumers and contilever up to floor two level
Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :-
Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like.
Flat surfaces such as soffits & suspended foors, roofs, landing and the like. Floor etc. upto 200mm in thickness.
Edges of slab and breaks in floors & walls ( under 20 cmtr wide)
Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts . Tor Steel.
Providing /Fixing of SFRC / Precast concrete manhole cover and frame, confirming ti IS 12592-2002 560 mm dia complete in all respect as per direction of Engineer-in-Charge.
Stoner filling behind retaining wall as per direction and to the entire satisfaction of Engineer -In-Charge.
Laying jointing testing D.I Pipe with Tyton joint ( IS : 8329:2000) of wall thickness 5.00 mm in a random length complete in all respect excluding earth work in trenches in all lead and lifts as per the direction to the entire satisfaction of Engineer in charge)
150 mm Nominal Bore
Providing tyton ( Push on joints) to Ducline iron pipes and fitting including the testing of the joints cost of rubber gasket (SBR quality) confirming to IS 12820/1989 150 mm dia complete in all respect as per direction of Engineer-in-Charge.
150 mm Nominal bore
Providing & Fixing D I Bends of required degree with DI Pipe 150 mm dia complete in all respect as per direction of Engineer-in-Charge.
11.25 degree
22.50 degree
45 degree
90 degree
Mechnical Joint
M/S PREM CHAND
M/S BANSI LAL KAITH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .