Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹24.4 L+₹1.6 L (6.83%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹25.7 L+₹2.9 L (12.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹28.2 L+₹5.4 L (23.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹32.0 L
EMD Value
₹63,960
Closing Date
29 Sept 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
NIT
2026_RDPR_325451_18
e.NIT No. 188 REW UDHAMPUR of 2026.27 Dated 21-09-2026
Open Tender
Civil Works
Percentage
90 days
udhampur
BOQ
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹63,960
6 Oct 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of sign borad necessary painting and wrihting including inaguration plate all complete | 1 | no. | 5,000 | ₹5,000 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.46 | cum | 4,826.5 | ₹11,873.19 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.7 | cum | 5,733.6 | ₹21,214.32 |
| 4 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: 1cement : 6 coarse sand mortar. For super structure | 58.49 | cum | 7,571.55 | ₹4,42,859.96 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 2 coarse sand : 4 graded stone aggregates 20mm nominal size. | 19.83 | cum | 9,821.85 | ₹1,94,767.29 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size. in 1:1.5:3 mix | 13.89 | cum | 9,395.7 | ₹1,30,506.27 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 2,360.72 | kg | 123.2 | ₹2,90,840.7 |
| 8 | Centring and shuttering including strutting, propping etc and removal of the formwork. Columns ,Pillars, piers, abutments, posts, and struts | 142.19 | Sqm | 718.2 | ₹1,02,120.86 |
| 9 | Lintel, beams, plinth, girders, bressumers and cantilevers. | 150.41 | sqm | 577.55 | ₹86,869.3 |
| 10 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. riveted and bolted | 6,230.53 | cum | 138.2 | ₹8,61,059.25 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1100067.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .