Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC AOC issue |
| 2 | L2₹8.4 LSame as L1Rejected-Finance | ₹8.4 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
| 3 | L2₹8.4 LSame as L1Rejected-Finance 12 36 126 A GWALTOLI KANPUR | ₹8.4 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
| 4 | L2₹8.4 LSame as L1Rejected-Finance 88 307 T CHAMAN GANJ KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹8.4 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
| 5 | L2₹8.4 LSame as L1Rejected-Finance | ₹8.4 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
Tender Value
₹9.9 L
EMD Value
₹98,644
Closing Date
20 May 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Improvement work of Footpath and Drain from Gupta Jewellers to Arya Nagar chauraha under Behnajhabar Khalasi Line Arya Nagar ward-10 zone-4.
2026_NNKAN_1146642_1
04/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
ward-10
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,644
6 Jul 2026
18 May 2026
20 May 2026
18 May 2026
20 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of B.O.E soling/inter locking tiles Including Stacking of serviceable material and disposal of unserviceable material within a lead of 50m as per direction of EI/C (Labour only) | 310 | sqm | 11 | ₹3,410 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: 2.1.1 All kinds of soil. | 11.3 | cum | 174 | ₹1,966.2 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm (nominal size) | 34.6 | cum | 5,740 | ₹1,98,604 |
| 4 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (Icement: 3 coarser sand) including making joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm) including making drainage, opening wherever required complete etc. as per direction of Engg-in-charge (Length of finished kerb shall be measured for payment) | 100 | rmt | 458 | ₹45,800 |
| 5 | Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place OMC and method with rotovator al compacting with viberatory roller to achieve the desired density as per clause 401. | 24.8 | cum | 3,671 | ₹91,040.8 |
| 6 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement: 4 coarse sand):25 mm thick | 310 | sqm | 1,615 | ₹5,00,650 |
| 7 | Providing and fixing in position pre-cast RC.C. manhole cover and frame of required shape and approved quality
Circular shape 500 mm Internal diameter | 3 | nos | 908 | ₹2,724 |
| 8 | Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work. | 4 | nos | 5,180 | ₹20,720 |
| 9 | Disposal of moorum/building rubbish/malba/similar unserviceable, dismantled or waste material by mechanical transport including loading. transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. | 9 | cum | 255 | ₹2,295 |
| 10 | Sale of materials of old Interlocking tiles etc all complete. | 1,488 | nos | -21 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2144450.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.66 MB
BOQ_2144450.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .