Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC | ₹12.5 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹12.9 LRejected-AOC | ₹12.9 L | L2 | Rejected-AOC 2nd |
| Sl No | Description | Qty | Unit | The Ratta Khera Coop. L and C So. Ltd. L2 | THE SIRSA ANNUTAM COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | [4.1]Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 21,053.25 | Sqm | 4 ₹84,213 | 4.74 ₹99,792.40 |
| 2.00 | [4.2]Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,41,921.87 | Sqm | 2.25 ₹3.2 L | 2.37 ₹3.4 L |
| 3.00 | [4.41]Earth work of silt-clearance of channels and drains. Kassi work undressed involving an average horizontal through upto 2 metres and average vertical lift upto 0.5 metre. | 14,774.21 | cum | 60 ₹8.9 L | 55.3 ₹8.2 L |
Tender Value
₹15.9 L
EMD Value
₹31,720
Closing Date
18 May 2026, 6:00 pmClosed
SANDEEP KUMAR
Ghaggar W.S. Divn. Sirsa
Silt clearance,Internal and outer clearance of SGC Lined from RD 0 to 59100
2026_HRY_520285_1
2026215B2D51 859E 4C47 AF3A 43613A0C779B118IRR
Open Tender
Civil Works
30 days
FEROZABAD FEROZABAD OTTU OTTU GIDRANWALI KESH
Silt clearance Internal and outer clearance of SGC
5 documents required · 5 mandatory
₹1,000
₹31,720
Yes
26 May 2026
8 May 2026
19 May 2026
9 May 2026
18 May 2026
9 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | [4.1]Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 21,053.25 | Sqm | 6 | ₹1,26,319.5 | [4.1]Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 2 | [4.2]Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,41,921.87 | Sqm | 3 | ₹4,25,765.61 | [4.2]Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 3 | [4.41]Earth work of silt-clearance of channels and drains. Kassi work undressed involving an average horizontal through upto 2 metres and average vertical lift upto 0.5 metre. | 14,774.21 | cum | 70 | ₹10,34,194.7 | [4.41]Earth work of silt-clearance of channels and drains. Kassi work undressed involving an average horizontal through upto 2 metres and average vertical lift upto 0.5 metre. |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.36 MB
BOQ_599179.xls
BOQ • 0.28 MB
AD0162717.pdf
Additional Documents • 1.75 MB
Download all tender documents and submit your bid